Docket Nos. 50-250 and 50-251 y7-ggP+AC& L OcToa<R 8 I 1980 DISTRIBUTION'ocket Fil 50-and 50-251 NRC PDRs (2)
Local PDR NSIC TERA NRR Reading ORBl Reading T. Vovak Dr. Robert E. Uhrig, Vice President S.
Varqa Advanced Systems and Technology M. Grogenhuis Florida Power and Light Company D. Chancy Post Office Box 529100 C. Parrish Miami, Florida 33152 I&E (3)
- Attorney, OELD
Dear Dr. Uhrig:
J.
Roe J.
Heltemes We have completed our review of inadvertent safety injection during surveillance testing at the Turkey Point Plant, Unit Nos.
3 and 4.
We find that your letter of November 8. 1979,. which responded to our letter of September 21, 1979 (which enclosed our letter of June 26, 1979) is acceptable.
Based on your letter and our review we consider the matter resolved for your facility.
cc:
See next page Sincerely,
.Original signed bye S., A. Varga Steven A. Varga, Chief Operating Reactors Branch 41 Division of Licensing gpss OFFICE $
SURNAME DATE/
..D.t,; tidal..
DChaney;cf 10/(7/80
..DL:ORB...
~
tlGrotenhuis 10/('80 ga
/80 NRC FORM 318 (9-76) NRCM 0240 AU.S GOVERNMENT PRINTING OFFICE: l979 289 369
41 1P'c
~I 8 t foal 11
'I I II
~ 6
~R Rfgy O~
Oj O
I g
O~
VJ+n
~O
%~*~+
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON,D. C. 20555 October 21, 1980 Docket Nos. 50-250 and 50-251 Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power and Light Company Post Office Box 529100 Miami, Florida 33152
Dear Dr. Uhrig:
We have completed our review of inadvertent safety injection during surveillance testing. at the Turkey Point Plant, Unit Nos.
3 and 4.
We find that your letter of November 8, 1979, which responded to our letter of September 21.
1979 (which enclosed our letter of June 26, 1979) is acceptable.
Based on your letter and our review we consider the matter resolved for your facility.
Sincerely,
~'S even A.
r'a, C
f
\\
g s
Operating Reactors.
anch
$ 1 Division of Licensing cc: 'ee next page
I Robert E-Uhrig Florida Power and Light Company October 21, 1980 CC.
'I a'ir Library rsity.'nvi ronmental and Urban Flori da International Un f:
v
~
I I c E
, IE -.':
Miami, Florida 33199 Mr. Norman A. Coll, Esquire
.I
/
- Steel, Hector and Davis';
1400 Southeast First Natio Bank Building Miami, Florida 33131 al Mr. Henry Yaeger,,
Plant Manager Turkey Point Plant.
Florida Power and Light Company P. 0. Box 013100 Miami, Florida 33101 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida.
32304 Mr. Robert Lowenstein, Esquire Lowenstein,
- Newman, Reis and Axelrad 1025 Connecticut Avenue,.
N.M-Suite 1214 Washington, D-C.
20036 I
1
'L Admi nistrator Department of Environmental Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Regu 1 at ion Resident Inspector Turkey Point Nuclear Generating Station, U. S. Nuclear Regulatory Comnission Post Office Box 971277 guail Heights Station Miami, Florida 33197