- L-82-361, Forwards Public Version of Emergency Plan Implementing Procedures,Including Procedures 20101 Re Duties of Emergency coordinator,20105 Re Onsite Support Ctrs & 20106 Re Natural Emergencies + (17:20:39, 7 January 2025)
- ML17341B379 + (17:20:44, 7 January 2025)
- L-82-388, Forwards Final Response to NUREG-0737,Item II.D.1 Re PWR Relief & Safety Valve Testing.Evaluations of Pressurizer Safety Valves & Pressurizer Safety & Relief Piping Encl + (17:20:45, 7 January 2025)
- L-82-389, Forwards Responses to Questions Re Adequacy of Station Electric Distribution Sys Voltages,Per 820809 Telcon. Explanation of Compliance W/General Design Criteria 17 Encl + (17:20:49, 7 January 2025)
- ML17341B376 + (17:20:50, 7 January 2025)
- L-82-405, Forwards Inservice Insp Rept Per 820422 Commitment.Rept Consists of Class 1 & 2 Summary Exam Tables for Third Period of Program + (17:20:51, 7 January 2025)
- ML17341B373 + (17:20:56, 7 January 2025)
- ML17341B372 + (17:20:57, 7 January 2025)
- L-82-403, Application to Amend Licenses DPR-31 & DPR-41,revising App a to Radiological Effluent Tech Specs Per NUREG-0472.Offsite Dose Calculation Manual for Gaseous & Liquid Effluents Forwarded + (17:21:01, 7 January 2025)
- ML17341B364 + (17:21:07, 7 January 2025)
- L-82-398, Requests That Last Sentence in Final Paragraph of 820810 Proposed Mod to Turbine Runback Sys Be Replaced W/Listed Sentence + (17:21:09, 7 January 2025)
- L-82-382, Forwards Comparison of Design Basis Max Fast Neutron Flux W/Actual Eight Cycle Average Flux Distribution at Reactor Pressure Vessel Inner Radius.Suppls 820503 Response to 820316 Request for Addl Info + (17:21:11, 7 January 2025)
- ML17341B361 + (17:21:16, 7 January 2025)
- ML17341B360 + (17:21:17, 7 January 2025)
- ML17341B359 + (17:21:18, 7 January 2025)
- ML17341B348 + (17:21:20, 7 January 2025)
- ML17341B357 + (17:21:20, 7 January 2025)
- L-82-342, Application for Amend of Licenses DPR-31 & DPR-41,changing Tech Specs 6.5.2.3,6.5.2.4,6.5.2.5,6.5.2.6 & Figure 6.2-1 to Update Offsite Organization + (17:21:21, 7 January 2025)
- L-82-349, Advises That Final Heat Tracing Components Necessary for Completion of Containment Hydrogen Monitor,Per NUREG-0737, Item II.F.1.6,received from Manufacturer on 820801.Estimated Completion of Installation Rescheduled Until 820930 + (17:21:23, 7 January 2025)
- L-82-347, Advises That NUREG-0737,Item II.D.1.B, PWR Relief & Safety Valve Testing Is Satisfied by Submittal of PORV Block Valve Info Package & Listed Info + (17:21:27, 7 January 2025)
- ML17341B343 + (17:21:36, 7 January 2025)
- ML17341B342 + (17:21:40, 7 January 2025)
- ML17341B341 + (17:21:41, 7 January 2025)
- ML17341B336 + (17:21:45, 7 January 2025)
- ML17341B335 + (17:21:49, 7 January 2025)
- L-82-343, Proposes Mod to Turbine Runback Sys,Deleting Flux Rate Input.Sys Prone to Spurious Runbacks Due to Single Failure of Electrical Component.Encl Safety Evaluation Discusses Consequences of Single Dropped Rod Control Cluster Assembly + (17:21:53, 7 January 2025)
- L-82-341, Advises That Response to Question 1 of NRC 820316 Request for Addl Info Re Containment Purge & Vent Valve Operability Will Be Submitted by 821001.Util Awaiting Analysis from Valve Manufacturer,Due in Early Sept 1982 + (17:21:57, 7 January 2025)
- L-82-346, Forwards Addl Info Re Schedular Commitments for Items in Draft Technical Evaluation Rept on Control of Heavy Loads + (17:21:59, 7 January 2025)
- ML17341B331 + (17:22:04, 7 January 2025)
- L-82-336, Forwards Repts of Steam Generator Insp & Tube Repair - Jul 1982 Outage + (17:22:05, 7 January 2025)
- ML17341B328 + (17:22:19, 7 January 2025)
- L-82-334, Application for Amend to Licenses DPR-31 & DPR-41,revising Tech Spec Tables 3.5-2 Re Emergency buses,3.5-4 Re Undervoltage Relay Setpoints & 4.1-1 Re 4.16-kV & 480-volt Load Ctr Test Requirements + (17:22:20, 7 January 2025)
- L-82-312, Forwards Public Version of Emergency Plan Implementing Procedure 20126, Offsite Dose Calculations, Per 820727 Telcon + (17:22:22, 7 January 2025)
- ML17341B323 + (17:22:27, 7 January 2025)
- L-82-324, Informs That Info Requested in Re NUREG-0737, Item II.B.3, Post-Accident Sampling Sys, Will Be Transmitted on or Before 821115 + (17:22:29, 7 January 2025)
- ML17341B322 + (17:22:29, 7 January 2025)
- L-82-330, Advises That Radiological Effluent Tech Spec & Offsite Dose Calculation Manual Will Be Submitted by 820910 + (17:22:31, 7 January 2025)
- ML17341B319 + (17:22:40, 7 January 2025)
- ML17341B311 + (17:22:41, 7 January 2025)
- ML17341B310 + (17:22:42, 7 January 2025)
- W3F1-2017-0083, License Renewal Application Supplement Clarification + (17:22:45, 7 January 2025)
- L-82-295, Forwards Turkey Point Units 3 & 4 Updated Fsar,Vols 1-4 + (17:22:49, 7 January 2025)
- L-82-293, Responds to Requesting Clarification of NUREG- 0737,Item II.K.3.25, Loss of AC Power to Reactor Coolant Pump Seals. Component Cooling Water Sys Exchange Is Automatically Restored During Event + (17:22:54, 7 January 2025)
- ML17341B275 + (17:23:02, 7 January 2025)
- L-82-281, Forwards Reactor Containment Bldg Integrated Leak Rate Test,Types A,B & C + (17:23:03, 7 January 2025)
- L-82-275, Responds to 820701 Request for Submittal Addressing Functionability of Pressurizer Safety Valves & Power Operated Relief Valves,Required by NUREG-0737,Item II.D.1.A. Final Safety Valve Evaluation Will Be Sent by 820901 + (17:23:04, 7 January 2025)
- L-82-276, Submits Suppl 2 of Response to Generic Ltr 82-05 Re Progress in Completing post-TMI Items II.B.2, Plant Shielding, II.B.3, Post-Accident Sampling Capability, II.F.1.6 & II.F.1.4, Containment Hydrogen & Pressure Monitors + (17:23:06, 7 January 2025)
- L-82-258, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 20101 Re Duties of Emergency coordinator,20106 Re Natural Emergencies & 20107 Re Fire & Explosion Emergencies + (17:23:08, 7 January 2025)
- ML17341B261 + (17:23:13, 7 January 2025)
- ML17341B259 + (17:23:17, 7 January 2025)
- L-82-268, Provides Results of Engineering Evaluation of Loss of Ventilation on Components in Critical Areas During Loss of Ac Power.Loss of Ventilation Will Not Affect Capability to Maintain Coolant Inventory & Heat Removal + (17:23:18, 7 January 2025)