Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17348A481 + (15:06:44, 7 January 2025)
- ML17348A480 + (15:06:46, 7 January 2025)
- ML17348A479 + (15:06:47, 7 January 2025)
- TAC:71367 + (15:06:48, 7 January 2025)
- ML17348A478 + (15:06:49, 7 January 2025)
- LR-N17-0188, Response to Integrated Inspection Report 05000272/2017003 and 05000311/2017003 + (15:06:50, 7 January 2025)
- TAC:71732 + (15:06:51, 7 January 2025)
- ML17348A474 + (15:06:53, 7 January 2025)
- IR 05000250/1990021 + (15:06:54, 7 January 2025)
- L-90-232, Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance Testing + (15:07:02, 7 January 2025)
- ML17348A471 + (15:07:02, 7 January 2025)
- L-90-277, Forwards Addl Info on Emergency Power Sys Enhancement Project Re Load Sequencer,Programmable Logic Controllers & Implementation of Sys in Plant,Per NRC 900705 Request + (15:07:05, 7 January 2025)
- 05000250/LER-1990-014, :on 900627,plant Mgt Declared Both PORV Block Valves Inoperable.Caused by Unconservative Min Required Thrust Values Specified by Valve.Util Plans to Readjust PORV Block Valve Operator Torque Switches + (15:07:08, 7 January 2025)
- 05000251/LER-1990-006-02, :on 900705,automatic Start of Component Cooling Water Pump 4B Occurred Due to Low Pump Discharge Header Pressure.Caused by Personnel Error.Responsible Individual Required to Review Procedure + (15:07:10, 7 January 2025)
- IR 05000250/1990024 + (15:07:13, 7 January 2025)
- ML17348A464 + (15:07:15, 7 January 2025)
- ML17348A463 + (15:07:16, 7 January 2025)
- IR 05000250/1990009 + (15:07:17, 7 January 2025)
- IR 05000250/1990023 + (15:07:20, 7 January 2025)
- ML17348A454 + (15:07:21, 7 January 2025)
- IR 05000250/1990022 + (15:07:23, 7 January 2025)
- ML17348A442 + (15:07:25, 7 January 2025)
- IR 05000250/1990019 + (15:07:28, 7 January 2025)
- L-90-248, Forwards Rev 8 to Updated FSAR for Turkey Point Units 3 & 4. Rev Includes Activities Completed Between 890123 & 900122. Rept of Changes for Jul 1989 Through June 1990 Will Be Provided by 900901 + (15:07:30, 7 January 2025)
- ML17348A433 + (15:07:30, 7 January 2025)
- L-90-251, Documents Written & Verbal Request of Region II Personnel for Temporary Waiver of Compliance of Tech Spec 3.4.2.b.1 Re Allowable Out of Svc Time for One Emergency Containment Cooler from 24 H to 72 Hr W/Addl Reasons + (15:07:34, 7 January 2025)
- L-90-245, Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b) + (15:07:41, 7 January 2025)
- L-90-267, Special Rept:On 900604 & 13,fire Barriers Breached for More than 7 Days.Caused by Welding in Area.Plant Continues to Implement Compensatory Measures as Applicable + (15:09:36, 7 January 2025)
- L-90-268, Withdraws 900207 & 0424 Proposed Changes to Tech Specs Re Util Nuclear Review Board Composition + (15:09:43, 7 January 2025)
- ML17348A423 + (15:09:47, 7 January 2025)
- L-90-247, Forwards Revised No Significant Hazards Determination for Proposed Tech Specs 1.17 & 3.0.5 & Bases,Per + (15:09:48, 7 January 2025)
- L-90-275, Advises That Comments on NRC Safety Evaluation Re Implementation of Station Blackout Rule Will Be Provided by 900921 + (15:09:52, 7 January 2025)
- L-90-270, Forwards May 1990 Integrated Schedule Regulatory Rept for Plant + (15:09:56, 7 January 2025)
- L-90-264, Responds to Commitment Re Reverse Testing of Containment Isolation Valves Per Insp Repts 50-250/90-13 & 50-251/90-13. Corrective Action Plan Addresses Penetrations 16 & 53 for Unit 3 Only & Penetrations 11,47,54A & 54B for Both Units + (15:09:59, 7 January 2025)
- L-90-263, Provides Info Re Plant Implementation of 10CFR50.44 & NUREG- 0737,Item II.E.4.1 Re Hydrogen Recombiners,Per 900518 Meeting & Insp Repts 50-250/90-13 & 50-251/90-13.Agreement Re Use of External Recombiners Will Be Reactivated + (15:10:03, 7 January 2025)
- L-90-266, Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount + (15:10:05, 7 January 2025)
- ML17348A414 + (15:10:05, 7 January 2025)
- 05000250/LER-1990-013, :on 900615,reactor Trip Occurred When Operator Raised Power Above 10% W/Turbine in Tripped Condition.Caused by Personnel Error.Event Reviewed W/Operations Personnel & Operator Training in Selfchecking Initiated + (15:10:10, 7 January 2025)
- L-90-257, Monthly Operating Repts for June 1990 for Turkey Point Units 3 & 4 + (15:10:11, 7 January 2025)
- L-90-241, Comment Supporting NUMARC Position on Revised Wording of Petition for Rulemaking PRM-50-55 Concerning Fsars.Resulting Longer Interval Between FSAR Updates Would Benefit Many Licensees + (15:10:13, 7 January 2025)
- L-90-255, Forwards Addl Info Re Responses to NRC Questions on Piping Codes Used for Emergency Power Sys Enhancement Project + (15:10:14, 7 January 2025)
- IR 05000250/1990015 + (15:10:24, 7 January 2025)
- ML17348A401 + (15:10:26, 7 January 2025)
- ML17348A400 + (15:10:27, 7 January 2025)
- L-90-242, Comment Opposing Proposed Rule 10CFR55 Re fitness-for-duty Programs.Believes Current Program Aggressively Supports Performance Objective of fitness-for-duty Regulation & Applied Equally to All Persons Granted Unescorted Access + (15:10:30, 7 January 2025)
- IR 05000250/1990020 + (15:10:34, 7 January 2025)
- ML17348A395 + (15:10:35, 7 January 2025)
- L-90-256, Forwards Requested Addl Info Re Emergency Power Sys Enhancement Project.Specific Detailed Changes Will Be Made to Procedures to Address Mods Affecting Equipment Relied Upon for Safe Shutdown + (15:10:36, 7 January 2025)
- L-90-260, Summarizes Facility Performance Since Last SALP Evaluation Period Which Ended 890731.Util Pursued Aggressive self- Assessment Program,Including Significant Internal or Outside Assessments in Areas of Operator Performance & EOPs + (15:10:38, 7 January 2025)
- L-90-249, Requests Audit of NRC Records to Independently Verify Reasonableness of Charges Assessed Against Util,Per 10CFR170 Svcs + (15:10:39, 7 January 2025)
- L-90-237, Advises That New Date for Submittal of Response to Insp Repts 50-250/90-09 & 50-251/90-09 Is 900702 + (15:10:41, 7 January 2025)