Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18011B055 + (11:19:59, 7 January 2025)
- IR 05000400/1995014 + (11:20:03, 7 January 2025)
- HNP-95-102, Monthly Operating Rept for Oct 1995 for Shearon Harris Nuclear Power Plant + (11:20:05, 7 January 2025)
- ML18011B050 + (11:20:05, 7 January 2025)
- 05000400/LER-1995-009-01, :on 951005,unanticipated Actuation of ESF Components While in Refueling Outage 6 Due to Defective Retest Procedure.Revised Temporary Procedure to Reset SI Signal + (11:20:08, 7 January 2025)
- RAIO-0118-58130, LLC Response to NRC Request for Additional Information No. 281 (Erai No. 9082) on the NuScale Design Certification Application + (11:20:09, 7 January 2025)
- HNP-95-096, Forwards Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (11:20:11, 7 January 2025)
- PNO-II-95-064, on 951105,during Quarterly Testing of Automatic Actuation Logic & Relays of Main Steam Line Isolation Portion of ESF Instrumentation Test Relay Failure Caused Unexpected Closure of MSIV a + (11:20:14, 7 January 2025)
- ML18011B043 + (11:20:15, 7 January 2025)
- HNP-95-094, Informs That Personnel from Util Will Attend NRC GL 95-07 Meeting on 951024 in Atlanta,Ga to Discuss & Clarify Various Aspects Re Issue + (11:20:23, 7 January 2025)
- PNO-II-95-059, on 951020,Unit 1 Commenced Normal Shutdown in Excess of 72 H,To Repair body-to-bonnet Leak on Main Feedwater Isolation Valve.Resident Inspector Responded to Site & Monitored Activities Throughout Weekend + (11:20:23, 7 January 2025)
- HNP-95-085, Provides Addl Info Requested by NRC Re GL 95-03, Circumferential Cracking of SG Tubes + (11:20:25, 7 January 2025)
- ML18011B039 + (11:20:28, 7 January 2025)
- ML18011B038 + (11:20:29, 7 January 2025)
- HNP-95-089, Submits Plant Rev 1 to COLR in Support of Cycle 7 Operations Per Requirements of HNP TS 6.9.1.6.4 + (11:20:30, 7 January 2025)
- ML18011B037 + (11:20:30, 7 January 2025)
- ML18011B032 + (11:20:33, 7 January 2025)
- ML18011B031 + (11:20:33, 7 January 2025)
- HNP-95-090, Submits Addl Info Re RAB Emergency Exhaust Sys Design & Licensing Basis Issues + (11:20:34, 7 January 2025)
- ML18011B028 + (11:20:36, 7 January 2025)
- HNP-95-002, Monthly Operating Rept for Sept 1995 for Harris Nuclear Plant + (11:20:37, 7 January 2025)
- ML18011B027 + (11:20:37, 7 January 2025)
- ML18011B025 + (11:20:39, 7 January 2025)
- ML18011B023 + (11:20:40, 7 January 2025)
- ML18011B022 + (11:20:41, 7 January 2025)
- 05000400/LER-1995-006-01, :on 950824,determined Discrepancy Re Design of RAB EES Constituted Condition Outside Design Basis.Cause Still Under Investigation.Established Administrative Leakage Limit of 1 Gallon Per Hour + (11:20:42, 7 January 2025)
- HNP-95-083, Discusses Reactor Auxiliary Bldg Emergency Exhaust Sys Design & Licensing Basis Issues.Description of Proposed Changes to FSAR Which Incorporate Results of Dose Assessment Reanalysis & Details of Administrative Controls Encl + (11:20:43, 7 January 2025)
- ML18011B019 + (11:20:45, 7 January 2025)
- TAC:M91857 + (11:20:46, 7 January 2025)
- HNP-95-082, Submits Supplemental Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers + (11:20:47, 7 January 2025)
- ML18011B017 + (11:20:47, 7 January 2025)
- IR 05000400/1995012 + (11:20:55, 7 January 2025)
- ML18011B012 + (11:20:58, 7 January 2025)
- ML18011B011 + (11:20:59, 7 January 2025)
- HNP-95-078, Monthly Operating Rept for Aug 1995 for Shearon Harris Nuclear Power Plant + (11:21:00, 7 January 2025)
- ML18011B009 + (11:21:02, 7 January 2025)
- ML18011B007 + (11:21:03, 7 January 2025)
- ML18011B008 + (11:21:03, 7 January 2025)
- ML18011B006 + (11:21:04, 7 January 2025)
- ML18011B004 + (11:21:05, 7 January 2025)
- IR 05000400/1995010 + (11:21:06, 7 January 2025)
- HNP-95-074, Provides 90 Day Response to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity + (11:21:07, 7 January 2025)
- HNP-95-073, Monthly Operating Rept for Jul 1995 for Shearon Harris Nuclear Power Plant + (11:21:09, 7 January 2025)
- ML18011A996 + (11:21:11, 7 January 2025)
- HNP-95-072, Requests That 950320 Request for License Amend Re Reactor Trip Sys Instrumentation Setpoint Relocation to COLR Be Withdrawn,Per NRC Position That TS Parameters in Questions Would Not Meet Commission Criteria for Relocation + (11:21:12, 7 January 2025)
- ML18011A994 + (11:21:15, 7 January 2025)
- IR 05000400/1995030 + (11:21:17, 7 January 2025)
- ML18011A991 + (11:21:18, 7 January 2025)
- ML18011A990 + (11:21:19, 7 January 2025)
- IR 05000400/1995011 + (11:21:24, 7 January 2025)
- ML18011A987 + (11:21:26, 7 January 2025)