Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000400/LER-1996-009, :on 960530,identified Deficiencies in Reactor Auxiliary Bldg Exhaust Sys.Caused by Inadequate Surveillance Test Procedures.Revised Test Procedure + (11:14:30, 7 January 2025)
- ML18012A284 + (11:14:32, 7 January 2025)
- ML18012A280 + (11:14:33, 7 January 2025)
- ML18012A279 + (11:14:34, 7 January 2025)
- IR 05000400/1996005 + (11:14:39, 7 January 2025)
- ML18012A276 + (11:14:40, 7 January 2025)
- HNP-96-105, Forwards Response to NRC Re Violations Noted in Insp Rept 50-400/96-04.C/A:Event Review Team Assigned to Perform Root Cause Investigation of Event & Operating Procedure OP-120.0.05 Revised + (11:14:41, 7 January 2025)
- HNP-96-101, Monthly Operating Rept for May 1996 for Shearon Harris Nuclear Power Plant + (11:14:43, 7 January 2025)
- ML18012A272 + (11:14:45, 7 January 2025)
- ML18012A269 + (11:14:46, 7 January 2025)
- IR 05000238/2017001 + (11:14:47, 7 January 2025)
- ML18012A266 + (11:14:51, 7 January 2025)
- 05000400/LER-1996-002-04, :on 960508,failed to Properly Perform Tech Spec Surveillance Testing.Caused by Personnel Error.Personnel Counseled,Procedure Revised & Continued in-program Tech Spec Testing Program Review + (11:14:52, 7 January 2025)
- ML18012A260 + (11:14:54, 7 January 2025)
- ML18012A259 + (11:14:56, 7 January 2025)
- ML18012A258 + (11:14:57, 7 January 2025)
- ML18012A256 + (11:14:58, 7 January 2025)
- ML18012A253 + (11:14:59, 7 January 2025)
- ML18012A255 + (11:14:59, 7 January 2025)
- HNP-96-087, Application for Amend to License NPF-63,correcting Location Described for One of Three Triaxial Peak Accelerograph Recorders + (11:15:00, 7 January 2025)
- 05000400/LER-1996-007, :on 960425,failed to Perform Tech Spec Surveillance Testing Per Specification 4.7.6.d.3.Caused by Inadequate Procedure Development.Satisfied Differential Pressure Testing Requirement + (11:15:03, 7 January 2025)
- ML18012A246 + (11:15:07, 7 January 2025)
- IR 05000400/1996002 + (11:15:08, 7 January 2025)
- HNP-96-083, Monthly Operating Rept for Apr 1996 for Harris Nuclear Plant + (11:15:09, 7 January 2025)
- HNP-96-080, Forwards Response to NRC Re Violations Noted in Insp Rept 50-400/96-02.Corrective Actions:Completed Review of Implementation Procedures for Complying TS Action Statements Re Esfa Sys & Reactor Protection Sys + (11:15:18, 7 January 2025)
- HNP-96-068, Annual Environ (Nonradiological) Operating Rept,App B for Jan-Dec 1995 + (11:15:20, 7 January 2025)
- HNP-96-073, Annual Radioactive Effluent Release Rept Jan-Dec 1995. W/ + (11:15:22, 7 January 2025)
- HNP-96-076, Forwards Amend 47 to FSAR for Shnpp,Incorporating Addl Engineering Evaluations as Indicated in 960412 Submittal of Amend 46 to Fsar.Info in Amend 47 Update Completes Amend Scope as Defined in 960412 Submittal of Amend 46 + (11:15:23, 7 January 2025)
- HNP-96-072, 1995 Annual Radiological Environ Operating Rept,Vols I- III + (11:15:28, 7 January 2025)
- 05000400/LER-1996-006, :on 960325,separation of Valve Stem & Disk for Main FW Isolation Valve Caused Valve to Become Inoperable. Caused by Mfg Defect.Valve Stem Machined & Procedures Revised + (11:15:31, 7 January 2025)
- ML18012A229 + (11:15:33, 7 January 2025)
- ML18012A227 + (11:15:34, 7 January 2025)
- ML18012A226 + (11:15:36, 7 January 2025)
- ML18012A225 + (11:15:37, 7 January 2025)
- ML18012A222 + (11:15:38, 7 January 2025)
- HNP-96-056, Submits Response to NRC GL 96-01, Testing of Safety-Related Logic Circuits + (11:15:39, 7 January 2025)
- ML18012A219 + (11:15:41, 7 January 2025)
- ML18012A218 + (11:15:42, 7 January 2025)
- HNP-96-071, Forwards Addl Info Re NPDES Permit non-compliance Condition Originally Reported on 960329 + (11:15:43, 7 January 2025)
- HNP-96-023, Clarifies Commitments Re Macroscopic Biological Fouling + (11:15:45, 7 January 2025)
- 05000400/LER-1996-005-01, :on 960312,failure to Properly Test Containment Bldg Outer Personnel Air Lock Door Occurred.Caused by Personnel Error.Individual Involved Counseled.W/Undated Ltr + (11:15:47, 7 January 2025)
- HNP-96-059, Monthly Operating Rept for Mar 1996 for Harris Nuclear Plant + (11:15:49, 7 January 2025)
- HNP-96-063, Forwards Rept Per 10CFR50.59(b)(c) of Changes,Tests & Experiments for Plant for 940712-951212 + (11:15:51, 7 January 2025)
- HNP-96-048, Forwards Rev 26 to PLP-201, Shearon Harris Nuclear Power Plant Emergency Plan, Including Changes to Eals,Staffing, Facility/Equipment Improvements,Emergency Response & Clerical & Grammatical Error + (11:15:53, 7 January 2025)
- HNP-96-055, Forwards 30-day Response to NRC Bulletin 96-001, Control Rod Insertion Problems + (11:15:54, 7 January 2025)
- HNP-96-058, Responds to NRC Re Violation Noted in Insp Rept 50-400/96-01.C/A:training Performed to re-emphasize Requirements for Reactor Auxiliary Bldg Emergency Exhaust Sys Boundary Doors & Radiation Work Permits Revised + (11:15:56, 7 January 2025)
- HNP-96-047, Requests Prior Approval for Rev to HNP Emergency Plan,Table 2.2-1 + (11:15:58, 7 January 2025)
- ML18012A195 + (11:16:01, 7 January 2025)
- 05000400/LER-1996-004, :on 960205,RWST Level Transmitters Failed & Violation of TS Action Statement Occurred.Caused by Freezing of Level Transmitter Sensing Lines.Frozen Lines Thawed & Missing Insulation Replaced + (11:16:05, 7 January 2025)
- HNP-96-054, NPDES Noncompliance Notification:On 960326 Internal Audit Identified Concern W/Sampling Frequency for Fecal Coliform at Heec Outfall.Investigation in Progress & Upon Completion Results Will Be Communicated + (11:16:06, 7 January 2025)
- IR 05000400/1996001 + (11:16:46, 7 January 2025)