Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18012A523 + (11:10:16, 7 January 2025)
- HNP-97-040, Forwards Harris Unit 1 Cycle 7 Colr,Rev 4. Revision Incorporates Changes Necessary to Support Temporary Relaxation of Min Required Number of Detector Thimbles in Movable Incore Detection Sys for Remainder of Cycle 7 + (11:10:17, 7 January 2025)
- ML18012A519 + (11:10:19, 7 January 2025)
- ML18012A517 + (11:10:21, 7 January 2025)
- IR 05000400/1996010 + (11:10:22, 7 January 2025)
- HNP-97-029, Monthly Operating Rept for Jan 1997 for Shearon Harris Nuclear Power Plant + (11:10:23, 7 January 2025)
- HNP-97-022, Forwards Emergency Planning Info in Response to NRC Administrative Ltr 94-07, Distribution of Site-Specific & State Emergency Planning Info. W/O Encl + (11:10:25, 7 January 2025)
- ML18012A513 + (11:10:25, 7 January 2025)
- ML18012A511 + (11:10:27, 7 January 2025)
- HNP-97-025, Forwards Bases Section for TS 3.2.3 Re Rated Thermal Power. Attached Retyped Bases Page B 3/4 2-5 + (11:10:28, 7 January 2025)
- ML18012A510 + (11:10:28, 7 January 2025)
- TAC:M97826 + (11:10:30, 7 January 2025)
- ML18012A507 + (11:10:31, 7 January 2025)
- ML18012A506 + (11:10:36, 7 January 2025)
- ML18012A503 + (11:10:36, 7 January 2025)
- ML18012A502 + (11:10:37, 7 January 2025)
- HNP-97-026, Application for Amend to License NPF-63,adding New Entry 3.0.5 to 3/4.0 Applicability.New 3.0.5 Provides Specific Guidance for Returning Equipment to Svc for Sole Purpose of Performing Testing to Demonstrate Operability + (11:10:38, 7 January 2025)
- ML18012A501 + (11:10:38, 7 January 2025)
- ML18012A497 + (11:10:41, 7 January 2025)
- HNP-97-009, Application for Amend to License NPF-63,requesting to Add New Entry 3.0.5 to 3/4.0 to Provide Specific Guidance for Returning Equipment to Service in Order to Demonstrate Operability + (11:10:42, 7 January 2025)
- ML18012A496 + (11:10:42, 7 January 2025)
- ML18012A492 + (11:10:45, 7 January 2025)
- ML18012A491 + (11:10:46, 7 January 2025)
- ML18012A489 + (11:10:47, 7 January 2025)
- IR 05000454/2018410 + (11:10:48, 7 January 2025)
- HNP-97-020, Forwards Request for License Amend to Clarify Pressure Testing Requirements for Isolable & non-isolable Diesel Fuel Oil Piping Based on Guidance Provided in ASME Code Section Xi.W/One Oversize Drawing + (11:10:49, 7 January 2025)
- HNP-97-011, Responds to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions + (11:10:51, 7 January 2025)
- ML18012A479 + (11:10:53, 7 January 2025)
- ML18012A478 + (11:10:54, 7 January 2025)
- HNP-97-013, Forwards Ltr Re Commitment Made to NRC for CPL Implementation for GL 96-01 Requirements at HNP Dated on 960416 + (11:10:55, 7 January 2025)
- ML18012A477 + (11:10:55, 7 January 2025)
- HNP-97-006, Forwards Revised Request for Relief from ISI Requirements for ASME Code Case N-522 + (11:10:57, 7 January 2025)
- HNP-97-012, Submits Requested Preliminary Reactor & Senior Reactor Operator License Applications + (11:10:59, 7 January 2025)
- HNP-97-003, Forwards Rev 29 to Shearon Harris Nuclear Power Plant Emergency Plan Including Changes to (PLP-201) + (11:11:01, 7 January 2025)
- HNP-97-004, Submits Revised Request for Addl Info Re ASME Boiler & Pressure Vessel Code,Section XI ISI Program Relief Request for Regenerative Heat Exchanger + (11:11:02, 7 January 2025)
- HNP-97-008, Responds to NRC Re Violations Noted in Insp Rept 50-400/96-10.Corrective Actions:Submitted Proposed Amend to TS 3/4.7.5 Re Ultimate Heat Sink,Reviewed Other Active TS Interpretations & Revised Procedure AP-107 + (11:11:04, 7 January 2025)
- PNO-II-97-002, on 970122,maint Technician Discovered Cut Wire Among Wire Bundle.Wire Cut W/Insulation Stripped Back & Wire Ends Twisted Together.Harris Security Notified & Determined Tampering & Vandalism Could Not Be Ruled Out + (11:11:14, 7 January 2025)
- 05000400/LER-1996-025, :on 961218,determined Missed Surveillance Test on PORV Block Valve 1RC-115.Caused by Personnel Error.Tested 1RC-115 & Counseled Personnel Involve + (11:11:16, 7 January 2025)
- HNP-97-001, Monthly Operating Rept for Dec 1996 for Shearon Harris Nuclear Power Plant + (11:11:17, 7 January 2025)
- ML18012A464 + (11:11:19, 7 January 2025)
- HNP-96-209, Application for Amend to License NPF-63,requesting Rev to TS 4.8.1.1.2.h.2 Re Test Tanks & Nonisolable Piping at Test Pressure + (11:11:20, 7 January 2025)
- ML18012A461 + (11:11:23, 7 January 2025)
- ML18012A460 + (11:11:24, 7 January 2025)
- ML18012A457 + (11:11:26, 7 January 2025)
- ML18012A454 + (11:11:27, 7 January 2025)
- ML18012A453 + (11:11:28, 7 January 2025)
- IR 05000254/2017007 + (11:11:35, 7 January 2025)
- HNP-96-206, Application for Amend to License NPF-63,requesting Rev to Chemistry Data (Nickel Content) in TS 3/4.4.9 Re Pressure/ Temp Limits + (11:11:36, 7 January 2025)
- 05000400/LER-1996-022, :on 961122,wiring Discrepancy Was Found in Auxiliary Building Ventilation Sys Circuitry.Caused by Personnel Error.Training on This Event Will Also Be Performed for Appropriate Maintenance + (11:11:38, 7 January 2025)
- 05000400/LER-1996-024, :on 961121,identified Common Mode Failure in RAB Electrical Equipment Protection Rooms Ventilation Sys. Caused by Inadequate Initial Sys Design.Will Install Plant Mod to Resolve AH-16 Single Failure + (11:11:40, 7 January 2025)
- ML18012A444 + (11:11:42, 7 January 2025)