Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000220/LER-1977-029, 77-030-00, 77-031-00, 77-034-00, & 77-035-00 for Nine Mile Point Unit 1 Low-Low-Low Level Set Point Out of Specs on RE-18A, Vacuum Switch Trip & Reset Point on Torus Relief Valves Out of Specs, Weld Leak in Emergency Condenser + (10:20:00, 7 January 2025)
- ML18018B139 + (10:20:01, 7 January 2025)
- ML18018B138 + (10:20:02, 7 January 2025)
- 05000220/LER-1977-032, For Nine Mile Point Unit 1 Regarding a Water Phase Material Sample in the Reactor Vessel Inspection Lapse During Refueling + (10:20:03, 7 January 2025)
- ML18018B134 + (10:20:04, 7 January 2025)
- ML18018B133 + (10:20:05, 7 January 2025)
- 05000220/LER-1978-003, Regarding Drywell High Pressure Switch RE04A Setpoint Drift and LER 78-003-00 + (10:20:06, 7 January 2025)
- ML18018B117 + (10:20:08, 7 January 2025)
- ML18018B115 + (10:20:09, 7 January 2025)
- ML18018B114 + (10:20:09, 7 January 2025)
- ML18018B112 + (10:20:10, 7 January 2025)
- 05000410/LER-1999-010-01, For Nine Mile Point, Unit 2, Regarding Two Standby Liquid Control Valves Not Tested as Required by Technical Specification 4.0.5 and LER 99-010-01, Supplement 1, Unit 2 Reactor Trip Due to a Feedwater Master + (10:20:12, 7 January 2025)
- ML18018B102 + (10:20:13, 7 January 2025)
- ML18018B098 + (10:20:14, 7 January 2025)
- ML18018B099 + (10:20:14, 7 January 2025)
- ML18018B092 + (10:20:15, 7 January 2025)
- ML18018B085 + (10:20:16, 7 January 2025)
- ML18018B082 + (10:20:17, 7 January 2025)
- ML18018B081 + (10:20:18, 7 January 2025)
- ML18018B080 + (10:20:19, 7 January 2025)
- ML18018B078 + (10:20:19, 7 January 2025)
- ML18018B074 + (10:20:20, 7 January 2025)
- ML18018B077 + (10:20:20, 7 January 2025)
- ML18018B070 + (10:20:21, 7 January 2025)
- ML18018B065 + (10:20:22, 7 January 2025)
- ML18018B059 + (10:20:23, 7 January 2025)
- ML18018B058 + (10:20:24, 7 January 2025)
- ML18018B056 + (10:20:24, 7 January 2025)
- ML18018B053 + (10:20:25, 7 January 2025)
- ML18018B052 + (10:20:26, 7 January 2025)
- ML18018B051 + (10:20:26, 7 January 2025)
- ML18018B049 + (10:20:28, 7 January 2025)
- ML18018B050 + (10:20:28, 7 January 2025)
- ML18018B046 + (10:20:29, 7 January 2025)
- ML18018B042 + (10:20:33, 7 January 2025)
- ML18018B038 + (10:20:34, 7 January 2025)
- ML18018B034 + (10:20:34, 7 January 2025)
- ML18018B033 + (10:20:35, 7 January 2025)
- ML18018B029 + (10:20:36, 7 January 2025)
- ML18018B013 + (10:20:36, 7 January 2025)
- ML18018B012 + (10:20:37, 7 January 2025)
- ML18018B003 + (10:20:38, 7 January 2025)
- ML18018B002 + (10:20:38, 7 January 2025)
- ML18018B001 + (10:20:39, 7 January 2025)
- ML18018B000 + (10:20:40, 7 January 2025)
- ML18018A990 + (10:20:41, 7 January 2025)
- PMNS20180060, January 2018 Reactor Oversight Process Monthly Public Meeting + (10:20:41, 7 January 2025)
- ML18018A967 + (10:20:42, 7 January 2025)
- ML18018A961 + (10:20:43, 7 January 2025)
- ML18018A962 + (10:20:43, 7 January 2025)
- ML18018A952 + (10:20:44, 7 January 2025)
- ML18018A951 + (10:20:44, 7 January 2025)