Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18024A649 + (09:28:47, 7 January 2025)
- ML18024A648 + (09:28:47, 7 January 2025)
- IR 05000259/1978027 + (09:28:50, 7 January 2025)
- ML18024A646 + (09:28:52, 7 January 2025)
- ML18024A645 + (09:28:52, 7 January 2025)
- ML18024A644 + (09:28:53, 7 January 2025)
- ML18024A642 + (09:28:57, 7 January 2025)
- ML18024A641 + (09:28:58, 7 January 2025)
- ML18024A639 + (09:28:59, 7 January 2025)
- 05000296/LER-1978-034-03, /03L-0 on 781216:during Normal Operation,The Relief Valve on Discharge of Standby Liquid Control Pump 3A PCV-63-512 Was Observed to Open at Wrong Set Pressure. Caused by Maladjustment of Crosby 1X2 Style Jm Wk Valve + (09:29:00, 7 January 2025)
- ML18024A636 + (09:29:02, 7 January 2025)
- 05000296/LER-1978-034, Forwards LER 78-034/03L-0 + (09:29:03, 7 January 2025)
- ML18024A631 + (09:29:04, 7 January 2025)
- ML18024A629 + (09:29:05, 7 January 2025)
- 05000260/LER-1978-023-03, /03L-0 on 781211:reactor High Pressure Switches Ps-3-204A&B Exceeded Tech Spec Limits When Static-O-Ring 9N-AA45-(x9)-TT Pressure Switch Drifted Out of Tolerance + (09:29:07, 7 January 2025)
- 05000260/LER-1978-023, Forwards LER 78-023/03L-0 + (09:29:08, 7 January 2025)
- IR 05000259/1978029 + (09:29:11, 7 January 2025)
- ML18024A623 + (09:29:12, 7 January 2025)
- ML18024A621 + (09:29:12, 7 January 2025)
- ML18024A620 + (09:29:13, 7 January 2025)
- ML18024A617 + (09:29:14, 7 January 2025)
- ML18024A610 + (09:29:16, 7 January 2025)
- IR 05000296/1978028 + (09:29:18, 7 January 2025)
- 05000296/LER-1978-032-03, /03L-0 on 781124:during Master Refuel Test Instruction,Rcic Tripped on Overspeed & Was Inoperable. Electro-Governor-Regulator,Electro-Governor-Mechanism & Ramp Generator Were Replaced & RCIC Proved Operable + (09:29:19, 7 January 2025)
- ML18024A604 + (09:29:24, 7 January 2025)
- 05000296/LER-1978-032, Forwards LER 78-032/03L-0 + (09:29:25, 7 January 2025)
- 05000260/LER-1978-021-03, /03L-0 on 781201:suppression Chamber Hydrogen Monitoring Sys Failed to Meet Tech Spec Requirements.Caused by Low Signal Output of Torus Hydrogen Sensor + (09:29:27, 7 January 2025)
- 05000260/LER-1978-021, Forwards LER 78-021/03L-0 + (09:29:29, 7 January 2025)
- IR 05000259/1978026 + (09:29:30, 7 January 2025)
- ML18024A596 + (09:29:32, 7 January 2025)
- ML18024A595 + (09:29:33, 7 January 2025)
- ML18024A594 + (09:29:34, 7 January 2025)
- ML18024A592 + (09:29:34, 7 January 2025)
- 05000296/LER-1978-033-03, /03L-0 on 781114:leakage from 35 Isolation Valves Which Terminate Below Suppression Pool Water Level Exceeded Inventory Restriction of 20781 Cubic Feet Per 30 Days.Caused by Wearing of Seats on Valves + (09:29:36, 7 January 2025)
- 05000296/LER-1978-033, Forwards LER 78-033/03L-0 + (09:29:38, 7 January 2025)
- 05000296/LER-1978-031-01, /01T-0 on 781128:during CRD Scram Timing & Associated LPRM Connect on Verification Noted That All LPRMs Had Been Connected in Reverse Order.Caused by Lack of Explanation in Documents Describing Connection Procedure + (09:29:39, 7 January 2025)
- 05000296/LER-1978-031, Forwards LER 78-031/01T-0 + (09:29:41, 7 January 2025)
- IR 05000259/1978025 + (09:29:43, 7 January 2025)
- ML18024A580 + (09:29:44, 7 January 2025)
- 05000260/LER-1978-020-03, /03L-0 on 781110:during Normal Pwr Oper,Reactor & Turbine Bldg & Refueling Zone Ventilation Exhaust Monitor, RM-90-250 Became Inoperable.Instr & Its Sensing Line Dried Out & Returned to Svc + (09:29:45, 7 January 2025)
- ML18024A578 + (09:29:46, 7 January 2025)
- 05000260/LER-1978-020, Forwards LER 78-020/03L-0 + (09:29:48, 7 January 2025)
- ML18024A575 + (09:29:49, 7 January 2025)
- 05000260/LER-1978-018-03, /03L-0 on 781103:reactor Pressure Switch PS-6B-96, Switch 1 Failed to Operate During Surveillance Testing. Switch Exercised & Adjusted + (09:29:50, 7 January 2025)
- OIG-17-A-16, (OEDO-17-00522) Response to Status of Recommendations: the Office of the Inspector Generals Audit Report of the Nuclear Regulatory Commissions Adoption of Cloud Computing (OIG-17-A-16) + (09:29:51, 7 January 2025)
- 05000260/LER-1978-018, Forwards LER 78-018/03L-0 + (09:30:00, 7 January 2025)
- ML18024A570 + (09:30:01, 7 January 2025)
- IR 05000259/1978022 + (09:30:03, 7 January 2025)
- ML18024A568 + (09:30:05, 7 January 2025)
- ML18024A567 + (09:30:06, 7 January 2025)
- IR 05000424/2017009 + (09:30:09, 7 January 2025)