Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18036A362 + (06:43:20, 7 January 2025)
- IR 05000259/1991029 + (06:43:21, 7 January 2025)
- ML18036A358 + (06:43:22, 7 January 2025)
- ML18036A356 + (06:43:23, 7 January 2025)
- CNL-18-013, RD-022: Clinch River Small Modular Reactor Site - Wetland Survey Report, Revision 4 + (06:43:26, 7 January 2025)
- ML18036A351 + (06:43:27, 7 January 2025)
- ML18036A350 + (06:43:28, 7 January 2025)
- ML18036A346 + (06:43:28, 7 January 2025)
- 05000260/LER-1991-015-01, :on 910731,HPCI Sys Did Not Fulfill Safety Function Resulting from Low Suction Pressure Condition During Fast Startup.Caused by Design Deficiency.Permanent Time Delay Relay Installed + (06:43:30, 7 January 2025)
- 05000260/LER-1991-014, :on 910629,manual Reactor Scram Occurred Due to Bulk Suppression Pool Water Temp Exceeding Tech Spec Limit.Caused by Lack of Procedural Controls.Rcic Procedure Revised + (06:43:32, 7 January 2025)
- ML18036A337 + (06:43:33, 7 January 2025)
- ML18036A336 + (06:43:33, 7 January 2025)
- 05000260/LER-1991-010-01, :on 910515,violation of Plant Tech Spec Occurred When LCO Expired.Caused by Inadequate Procedures. Sys Declared Inoperable,Personnel Trained & Procedures Revised + (06:43:35, 7 January 2025)
- ML18036A334 + (06:43:36, 7 January 2025)
- ML18036A333 + (06:43:37, 7 January 2025)
- ML18036A332 + (06:43:38, 7 January 2025)
- ML18036A330 + (06:43:39, 7 January 2025)
- ML18036A328 + (06:43:40, 7 January 2025)
- ML18036A329 + (06:43:40, 7 January 2025)
- ML18036A327 + (06:43:41, 7 January 2025)
- ML18036A325 + (06:43:41, 7 January 2025)
- ML18036A324 + (06:43:42, 7 January 2025)
- ML18036A322 + (06:43:43, 7 January 2025)
- ML18036A321 + (06:43:44, 7 January 2025)
- ML18036A320 + (06:43:45, 7 January 2025)
- IR 05000259/1991010 + (06:43:46, 7 January 2025)
- ML18036A318 + (06:43:48, 7 January 2025)
- IR 05000259/1991022 + (06:43:50, 7 January 2025)
- ML18036A315 + (06:43:51, 7 January 2025)
- IR 05000259/1991018 + (06:43:52, 7 January 2025)
- ML18036A313 + (06:43:53, 7 January 2025)
- 05000260/LER-1991-014-01, :on 910629,manual Reactor Scram Occurred Due to Bulk Suppression Pool Water Temp Exceeding Tech Spec Limits. Procedure for Operating Rcic,Noting Potential for Thermal Stratification of Suppression Pool,Revised + (06:43:54, 7 January 2025)
- ML18036A311 + (06:43:55, 7 January 2025)
- ML18036A310 + (06:43:56, 7 January 2025)
- 05000260/LER-1991-013, :on 910605,Tech Spec Violation Occurred Due to Loss of Primary Containment.Caused by Personnel Error. Specialized Training for Plant Personnel & Procedure Enhancement Initiated + (06:43:58, 7 January 2025)
- ML18036A303 + (06:43:59, 7 January 2025)
- ML18036A305 + (06:43:59, 7 January 2025)
- ML18036A301 + (06:44:00, 7 January 2025)
- ML18036A300 + (06:44:01, 7 January 2025)
- ML18036A298 + (06:44:01, 7 January 2025)
- ML18036A296 + (06:44:02, 7 January 2025)
- ML18036A294 + (06:44:03, 7 January 2025)
- ML18036A292 + (06:44:04, 7 January 2025)
- ML18036A290 + (06:44:04, 7 January 2025)
- IR 05000259/1991019 + (06:44:06, 7 January 2025)
- ML18036A287 + (06:44:10, 7 January 2025)
- IR 05000259/1991021 + (06:44:24, 7 January 2025)
- ML18036A284 + (06:44:25, 7 January 2025)
- 05000260/LER-1991-013-01, :on 910605,loss of Primary Containment Integrity Occurred When Both Drywell Personnel Airlock Doors Opened Due to Personnel Error.Operating & Maint Instructions Revised + (06:44:29, 7 January 2025)
- ML18036A281 + (06:44:30, 7 January 2025)
- ML18036A279 + (06:44:31, 7 January 2025)