Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207B166 + (03:37:06, 7 December 2024)
- NPL-99-0086, Documents Commitment Change Which Is to Discontinue Actions Contained in Util Ltr Dtd 970613,after NRC Approval of LAR & Lower Containment Leak Rate Limit Is Implemented. Change Is Acceptable IAW Applicable Plant Procedure + (03:37:07, 7 December 2024)
- ML20207B164 + (03:37:07, 7 December 2024)
- ML20207B161 + (03:37:08, 7 December 2024)
- IR 05000320/1986010 + (03:37:13, 7 December 2024)
- JAFP-99-0171, Forwards Revised Ja FitzPatrick Nuclear Power Plant 1999 FSAR Update. Update Also Includes Changes to Chapter 17, QA Program Which Described in Attachment 1.No Commitments Contained in Ltr + (03:37:14, 7 December 2024)
- ML20207B155 + (03:37:15, 7 December 2024)
- ML20207B153 + (03:37:16, 7 December 2024)
- ML20207B150 + (03:37:16, 7 December 2024)
- ML20207B149 + (03:37:17, 7 December 2024)
- ML20207B146 + (03:37:18, 7 December 2024)
- ML20207B143 + (03:37:27, 7 December 2024)
- ML20207B142 + (03:37:28, 7 December 2024)
- ML20207B138 + (03:37:29, 7 December 2024)
- ML20207B136 + (03:37:30, 7 December 2024)
- ML20207B135 + (03:37:30, 7 December 2024)
- ML20207B133 + (03:37:31, 7 December 2024)
- ML20207B132 + (03:37:32, 7 December 2024)
- IR 05000271/1986012 + (03:37:32, 7 December 2024)
- ML20207B130 + (03:37:33, 7 December 2024)
- ML20207B129 + (03:37:34, 7 December 2024)
- ML20207B126 + (03:37:34, 7 December 2024)
- ML20207B125 + (03:37:35, 7 December 2024)
- ML20207B124 + (03:37:36, 7 December 2024)
- ML20207B123 + (03:37:37, 7 December 2024)
- ML20207B119 + (03:37:43, 7 December 2024)
- ML20207B117 + (03:37:44, 7 December 2024)
- ML20207B118 + (03:37:44, 7 December 2024)
- ML20207B116 + (03:37:45, 7 December 2024)
- ML20207B114 + (03:37:46, 7 December 2024)
- ML20207B111 + (03:37:47, 7 December 2024)
- ML20207B103 + (03:37:48, 7 December 2024)
- ML20207B101 + (03:37:51, 7 December 2024)
- ML20207B099 + (03:37:52, 7 December 2024)
- ML20207B092 + (03:43:02, 7 December 2024)
- ML20207B089 + (03:43:03, 7 December 2024)
- ML20207B084 + (03:43:05, 7 December 2024)
- ML20207B087 + (03:43:05, 7 December 2024)
- ML20207B083 + (03:43:06, 7 December 2024)
- ML20207B082 + (03:43:07, 7 December 2024)
- ML20207B076 + (03:43:10, 7 December 2024)
- ML20207B071 + (03:43:11, 7 December 2024)
- ML20207B070 + (03:43:12, 7 December 2024)
- 05000461/LER-1999-004, :on 990126,plant Was Operating Outside Design Basis.Caused Because Design for CR Operator Dose Calculation Did Not Consider Single Failure of CR Ventilation Sys. Revised CR Operator Dose Calculation.With + (03:43:14, 7 December 2024)
- U-603171, Forwards Response to NRC List of Questions Re LAR Re Overall Effort to Resolve Degraded Voltage Concerns at CPS + (03:43:16, 7 December 2024)
- ML20207B063 + (03:43:17, 7 December 2024)
- ML20207B060 + (03:43:18, 7 December 2024)
- ML20207B059 + (03:43:19, 7 December 2024)
- ML20207B057 + (03:43:21, 7 December 2024)
- 05000289/LER-1999-001-01, :on 990122,short Sections of Piping Caused by Misplacement of Sensing Elements & Insulation.Caused by Failure to Adhere to Vendor instruction.Re-installed Heat Trace Sys + (03:43:23, 7 December 2024)
- ML20207B048 + (03:43:24, 7 December 2024)