Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18040A834 + (16:09:04, 6 January 2025)
- PLA-2840, Forwards Application Proposing Amends 95 & 48 to Licenses NPF-14 & NPF-22,respectively,changing Tech Spec 4.1.3.1.4(a) Re Surveillance of Scram Discharge Vol Vent & Drain Valves. Fee Paid + (16:09:05, 6 January 2025)
- ML18040A830 + (16:09:08, 6 January 2025)
- ML18040A828 + (16:09:09, 6 January 2025)
- ML18040A826 + (16:09:10, 6 January 2025)
- PLA-2786, Forwards Proposed Amends 90 & 44 to Licenses NPF-14 & NPF-22,respectively,allowing Alternate Method of post-accident Drywell Gaseous Sampling & Providing Relief for Action Statement on Drywell Oxygen Analyzer.Fee Paid + (16:09:11, 6 January 2025)
- ML18040A821 + (16:09:13, 6 January 2025)
- PLA-2747, Further Response to IE Bulletin 79-26 Requirements.Util Developed & Verified Analytical Method to Calculate Control Blade Depletion.Based on Analysis,Util Determined That No Control Blades Will Exceed 34% B-10 Depletion + (16:09:13, 6 January 2025)
- PLA-2749, Forwards Rev to Deviation Request 6,addressing App R Re Nonfireproofing of Structural Steel,Including Issues & Concerns Raised by NRC During 860730 meeting.Thirty-two Oversize Drawings Encl + (16:09:15, 6 January 2025)
- PLA-2698, Forwards Application for Proposed Amends 85 & 40 to Licenses NPF-14 & NPF-22,respectively,revising Tech Specs for Administrative Purposes.Fee Paid + (16:09:17, 6 January 2025)
- PLA-2642, Responds to NRC Re Violations Noted in Insp Rept 50-387/86-05.Corrective Actions:Review of All ASME Code Class 1 & 2 Stainless Steel Matls within Scope of Inservice Insp Program Performed + (16:09:22, 6 January 2025)
- PLA-2602, Forwards Application for Amends to Licenses NPF-14 & NPF-22, Revising Tech Specs to Provide Editorial Correction to Approved Change for Unit 1 & to Support Mods Which Enhance Capability of Drywell Cooling Sys for Unit 2.Fee Paid + (16:09:24, 6 January 2025)
- PLA-2596, Forwards Application for Amends 80 & 33 to Licenses NPF-14 & NPF-22,respectively,changing Tech Specs to Incorporate Fifth Diesel Generator Into Plant Design.Approval by 860801 Requested + (16:09:25, 6 January 2025)
- PLA-2566, Forwards Response to NRC Concerns Re Plant Fire Protection Program,Including Criteria for Fire Protection of Safe Shutdown Sys within Fire Zone Not Complying W/Requirements of Section Iii.G & Analysis of Associated Circuits + (16:09:27, 6 January 2025)
- PLA-2558, Responds to Open Issues Re Dcrdr Concerning Performance of Task Analysis to Rev 3 to Emergency Procedures Guidelines, Color Convention in Control Room & Lack of Bulb Test Capability for Single Indicator Lights + (16:09:29, 6 January 2025)
- PLA-2498, Forwards Errata to Radiological Environ Monitoring Program, 1984 Annual Rept, Footnoting Samples W/Missed Lower Limits of Detection for Various Radioisotopes & Identifying Factors Causing Missed Sensitivity + (16:09:31, 6 January 2025)
- ML18040A789 + (16:09:31, 6 January 2025)
- ML18040A786 + (16:09:33, 6 January 2025)
- PLA-2514, Forwards Response to 850723 Request for Addl Info in Support of Tech Spec Exemption to Allow Diesel Generator Removal from Svc for 60 Days. Design Criteria,500 Kv Steel Pole Structure Transmission Lines, Encl + (16:09:34, 6 January 2025)
- ML18040A783 + (16:09:35, 6 January 2025)
- PLA-2455, Responds to NRC Re Violations Noted in Insp Repts 50-387/85-07 & 50-388/85-07.Corrective Actions:Tags Hung on Svc Air Drops & Breathing Air Lines for 10 DEL-MONOX Units. Personnel Training Will Be Completed by 850515 + (16:09:36, 6 January 2025)
- PLA-2475, Requests Deletion of Nd Weiss & Eb Poser from Svc List & Addition of Rj Benich + (16:09:38, 6 January 2025)
- PLA-2472, Responds to 850319 Request for Addl Info Re Responses to Generic Ltr 83-28,Items 2.1,2.2.2 & 4.5.3.Testing of Backup Scram Valves at Refueling Outage Frequency Added to Preventative Maint Program + (16:09:39, 6 January 2025)
- ML18040A778 + (16:09:41, 6 January 2025)
- PLA-2440, Forwards Application for Proposed Amends 66 & 19 to Licenses NPF-14 & NPF-22,respectively.Amends Change Tech Specs to Support Operation W/One Recirculation Loop Out of Svc.Fee Paid + (16:09:44, 6 January 2025)
- PLA-2443, Submits Actions Taken in Response to Findings Resulting from NRC Review of Fire Protection Program & Fire Hazards Analysis During Wk of 850318.Control Room Panels Will Be Reanalyzed.Summary of Analysis Will Be Submitted by 850624 + (16:09:45, 6 January 2025)
- ML18040A770 + (16:09:47, 6 January 2025)
- ML18040A767 + (16:09:47, 6 January 2025)
- PLA-2407, Forwards Applications for Proposed Amends 63 & 17 to Licenses NPF-14 & NPF-22,respectively,revising Membership of Util Review Committee.Fee Paid + (16:09:48, 6 January 2025)
- PLA-2370, Forwards Applications for Proposed Amends 57 & 12 to Licenses NPF-14 & NPF-22,respectively.Amends Change Tech Specs to Separate Unit 1 & 2 Battery Loads to Avoid Forced Shutdown of Unit 2 During Unit 1 Refueling Outage + (16:09:50, 6 January 2025)
- ML18040A748 + (16:09:52, 6 January 2025)
- PLA-2354, Submits Additions & Corrections to Svc List for Facility. W Matson Should Be Added to List.We Barberich Title Should Be Corrected to Manager of Nuclear Licensing + (16:09:53, 6 January 2025)
- ML18040A744 + (16:09:54, 6 January 2025)
- ML18040A742 + (16:09:55, 6 January 2025)
- ML18040A741 + (16:09:55, 6 January 2025)
- PLA-2210, Responds to Generic Ltr 84-11, Insp of BWR Stainless Steel Piping. Induction Heating Stress Improvement & Ultrasonic Testing or Radiography Will Be Performed on Unit 1 Welds During First Refueling Outage + (16:09:57, 6 January 2025)
- ML18040A739 + (16:09:57, 6 January 2025)
- PLA-2142, Amends Response to FSAR Question 110.57,per 840319 Telcon. Visual Insp on Unit 1 Lines Revealed No Appreciable Vibratory Effects.Fsar Rev,Reflecting Position,Will Be Provided + (16:09:59, 6 January 2025)
- PLA-2109, Clarifies Cover Ltr to Rev 7 to Emergency Plan (PLA-1940). Details Provided for Manning Emergency Operation Facility (EOF) & Activation of Backup Eof.Unit 2 Fuel Load Scheduled for 840326.Expeditious Approval Requested + (16:10:01, 6 January 2025)
- ML18040A729 + (16:10:01, 6 January 2025)
- PLA-2134, Requests That Further Action on BWR Core Thermal Hydraulic Stability Be Deferred,Due to Lack of Time to Review New Info Presented at 840308 Meeting W/Nrc + (16:10:03, 6 January 2025)
- ML18040A726 + (16:10:05, 6 January 2025)
- ML18040A725 + (16:10:05, 6 January 2025)
- PLA-2060, Responds to Inquiry Re Feedwater Piping Outside Reactor Bldg.Main Steam Piping Runs Through Turbine Bldg Main Steam Pipe Tunnel,Resulted in Total Separation from Feedwater Piping in Area + (16:10:06, 6 January 2025)
- PLA-2059, Provides Revised Scheduled Completion Date for Safety Parameter Display Sys of No Later than 840701.Extending Completion Date Will Not Reduce Ability to Deal W/Emergency + (16:10:08, 6 January 2025)
- PLA-2052, Requests Exemption from 10CFR50,App E Requirement for State & Local Govt Full Offsite Participation in Emergency Planning Exercise + (16:10:09, 6 January 2025)
- ML18040A718 + (16:10:11, 6 January 2025)
- PLA-1879, Requests Approval of ASME Code Case N-253-2, Const of Class 2 or 3 Components for Elevated Temp Svc Section III, Div I, for Application to Diesel Engine Exhaust Gas Expansion Joint for Addl New Diesel Generator + (16:10:12, 6 January 2025)
- ML18040A717 + (16:10:12, 6 January 2025)
- ML18040A709 + (16:10:14, 6 January 2025)
- PLA-1820, Forwards Revised FSAR Section 7.4 Changing Pressure at Which Reactor Shutdown Cooling Sys Will Operate.Rev Will Be Incorporated Into Next FSAR Amend + (16:10:15, 6 January 2025)