Forwards Resident Insp Repts 50-387/86-24 & 50-388/86-26 on 861015 & 1201.No Violations Noted.Mgt Attention Should Be Focused on Determining Root Cause of Waterhammer Events & Establishing & Implementing Measures to Prevent Recurrence
ML18040A821
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/09/1987
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML18040A822 List:
References
NUDOCS 8701160195
Download: ML18040A821 (2)


See also: IR 05000387/1986024

Text

JAN

9 l987

Docket Nos.

50-387

~ '50=388~

Pennsylvania

Power

& Light Company

ATTN:

Mr. H.

W. Keiser

Vice President

Nuclear Operations

2 North Ninth Street

Allentown, Pennsylvania

18101

Gentlemen:

Subject:

Routine Resident

Inspection

Nos. 50-387/86-24

~50=388/86-2~6

(10/15/86

and 12/01/86)

This routine inspection of the Susquehanna

Steam Electric Station covered

plant operations,

surveillance,

maintenance,

open

items followup, Unit 2 First

Refueling Outage Activities, allegation followup, and licensee

events.

The

inspection

focused

on Unit 2 refueling outage activities and followup of

events.

No violations were identified.

During this report period,

three

events involving waterhammers

occurred

in

plant systems;

two of which resulted in hanger

damage.

Management attention

should

be focused

on determining

the root cause of these

events

on

establishing

and implementing effective measures

to prevent their recurrence.

Our review of these

events

found that all occurred during non-routine

evolutions not specifically covered

by detailed plant procedures.

Additional

operator training to increase

the sensitivity to waterhammer

events

and

methods of prevention

appears

warranted.

Your cooperati'on with us is appreciated.

Sincerely,

Qz'XgQRQ, $1g~eg g

A.

R. Blough, Chief

Project Branch

No.

1

Division of Reactor Projects

Enclosure:

Combined

NRC Inspection

Report

Nos. 50-387/86-24;

50-388/86-26

8701160195

870109

OFFICIAL RECORD

COPY

CIR SUS 86-24/26 - 0001.0.0

01/06/87>EOI

Pennsylvania

Power 5 Light Company

cc w/encl:

A.

R. Sabol,

Manager,

Nuclear (}uality Assurance

W.

E. Barberich,

Manager,

Nuclear Licensing

R.

G. Bryam, Superintendent

of Plant-SSES

H.

W. Hirst, Manager, Joint Generation

Projects

Department

R. J.

Benich, Services Project Manager,

General Electric Company

B.

O.

Kenyon, Senior Vice President-Nuclear

Bryan A. Snapp,

Esquire, Assistant

Corporate

Counsel

Paul

N. Tethrow, Allegheny Electric Cooperative,

Inc.

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

Commonwealth of Pennsylvania

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

J. Wiggins, Chief, Project Section

1B,

DRP

Robert J.

Bores,

DRSS

Karl Abraham (2 copies)

RI:ORP

~~ Pli sco/ca

1/ P'/87

RI:ORP

~ Wiggins

1/ P/8

OFFICIAL RECORD

COPY

CIR

SUS 86-24/26 - 0002.0.0

01/06/87