Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18040B262 + (16:03:17, 6 January 2025)
- ML18040B261 + (16:03:18, 6 January 2025)
- PLA-3263, Forwards Final Response to Request for Addl Info Re Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. Listed Items Included in Previous & Current Ref Responses + (16:03:19, 6 January 2025)
- PLA-3253, Semiannual Effluent & Waste Disposal Rept for Jan-June 1989 + (16:03:22, 6 January 2025)
- ML18040B256 + (16:03:22, 6 January 2025)
- PLA-3238, Discusses Insp of Operational Status of Emergency Preparedness Program.Susquehanna Review Committee 1987 & 1988 Emergency Plan Audits Encl W/Other Supporting Documentation + (16:03:28, 6 January 2025)
- PLA-3215, Forwards Summary Rept of Safety Evaluations Approved During 1988.Changes Include Backseating Control Box to Electrically Backset HV-202168 to Reduce Steam Leakage & Rerouting Condensate Supply Line to Main Condenser Keepfill + (16:03:31, 6 January 2025)
- PLA-3191, Pennsylvania Power & Light Co Annual Financial Rept,1988. Alleghany Electric Cooperative,Inc Financial Statements & Encl + (16:03:34, 6 January 2025)
- PLA-3180, Forwards Application for Amends to Licenses NPF-14 & NPF-22, Resulting from Mods Performed to Essential Svc Water Sys,Per 10CFR50,App R,Consisting of Proposed Amends 23 & 70 + (16:03:36, 6 January 2025)
- ML18040B240 + (16:03:39, 6 January 2025)
- ML18040B239 + (16:03:39, 6 January 2025)
- PLA-3150, Semiannual Effluent & Waste Disposal Rept,Jul-Dec 1988 + (16:03:41, 6 January 2025)
- PLA-3117, Forwards Listed Addl Info Re Plant Fire Protection Review rept.W/16 Oversize Drawings + (16:03:43, 6 January 2025)
- PLA-3060, Responds to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. Staff Position on Matls, Water Chemistry,Crack Evaluation & Repair Criteria & Insp Schedules Among Topics Addressed.Flaw Evaluations Encl + (16:03:45, 6 January 2025)
- PLA-3066, Forwards Comments to Each Specific SALP Category,Per 880707 Meeting W/Nrc.Presentations from Meeting Also Encl + (16:03:47, 6 January 2025)
- PLA-2575, Forwards Plant Rept Summarizing Safety Evaluations Approved for 1984 + (16:03:48, 6 January 2025)
- PLA-3049, Forwards 1987 Annual Rept for Allegheny Electric Cooperative,Inc + (16:03:50, 6 January 2025)
- ML18040B209 + (16:04:37, 6 January 2025)
- PLA-3009, Pennsylvania Power & Light Co Annual Rept 1987 + (16:04:41, 6 January 2025)
- PLA-2959, Responds to NRC Re Violations Noted in Insp Repts 50-387/87-19 & 50-388/87-19.Corrective Actions:Nuclear Dept Instruction & Plant Administrative Procedures Revised to Reflect Suitability of Individuals for Certain Mgt Position + (16:04:43, 6 January 2025)
- PLA-2966, Forwards Util Final Response to IE Bulletin 85-003, Motor- Operated Valve Common Mode Failure Due to Improper Switch Settings + (16:04:45, 6 January 2025)
- PLA-2953, Forwards Application for Proposed Amend 58 to License NPF-22,changing Tech Specs to Support Cycle 3 Reload.Unit Scheduled to Shutdown on 880305 & Restart on 880503.Reload Summary & Transient Analysis Repts Encl.Fee Paid + (16:04:51, 6 January 2025)
- IR 05000387/1987018 + (16:04:57, 6 January 2025)
- ML18040B189 + (16:04:58, 6 January 2025)
- ML18040B188 + (16:04:59, 6 January 2025)
- PLA-2906, Forwards Revised App R Deviation Request 13, Essential Redundant Raceway Protection. Util Plans to Wrap Raceway Per Deviation During Unit 1 Third Refueling & Insp Outage + (16:05:00, 6 January 2025)
- IR 05000387/1987010 + (16:05:08, 6 January 2025)
- PLA-2847, Forwards Annual Financial Rept for 1986,including Certified Financial Statements for Allegheny Electric Cooperative,Inc for Nov 1985 - Oct 1986 + (16:05:09, 6 January 2025)
- PLA-2820, Pennsylvania Power & Light Co,1986 Annual Rept + (16:05:11, 6 January 2025)
- ML18040B174 + (16:05:13, 6 January 2025)
- ML18040B173 + (16:05:14, 6 January 2025)
- IR 05000387/1986024 + (16:05:33, 6 January 2025)
- ML18040B167 + (16:05:35, 6 January 2025)
- PLA-2756, Forwards Postulated Pipe Rupture Calculations M-MSS-010 & M-MSS-006,per NRC 861112 Telcon Request + (16:05:37, 6 January 2025)
- PLA-2705, Forwards Rev 0 to ISI-T-207.0, Component Listing & Inservice Insp 10 Yr Plan & Response to NRC 860204 Request for Addl Info on Inservice Insp Programs + (16:05:39, 6 January 2025)
- ML18040B158 + (16:05:41, 6 January 2025)
- PLA-2677, Forwards Audited Financial Statements & Other Financial Info for Allegheny Electric Cooperative,Inc for Nov 1984 - Oct 1985 + (16:05:42, 6 January 2025)
- PLA-2668, Forwards Response to Request for Addl Info Re Proposed Amends 80 & 30 to Licenses NPF-14 & NPF-22,respectively, Revising Tech Specs to Reflect Incorporation of Fifth Diesel Generator Into Plant Design.Three Oversize Drawings Encl + (16:05:44, 6 January 2025)
- PLA-2661, Forwards Application for Proposed Amend 39 to License NPF-22,revising Tech Specs to Support Cycle 2 Reload.Fee Paid + (16:05:46, 6 January 2025)
- PLA-2645, Forwards Supplemental Info Re Application for Amends 80 & 33 to Licenses NPF-14 & NPF-22,respectively,per 860428 Telcon Request.Srp Sections Re Design of Fifth Diesel Generator Facility Addressed + (16:05:48, 6 January 2025)
- PLA-2623, Pennsylvania Power & Light Co,1985 Annual Rept + (16:05:50, 6 January 2025)
- ML18040B130 + (16:05:52, 6 January 2025)
- ML18040B129 + (16:05:53, 6 January 2025)
- PLA-2549, Forwards ASME Code NIS-1 Form Re Preservice Exams & GE & Nuclear Energy Svcs Preservice Insp Repts + (16:05:55, 6 January 2025)
- PLA-2541, Suppls Util Re Resolution of Fire Protection Concerns.Listed Replacement Pages Re Sprinkler Protection for Control Structure Elevation & Shutdown Paths Encl + (16:05:57, 6 January 2025)
- ML18040B119 + (16:05:59, 6 January 2025)
- ML18040B110 + (16:06:00, 6 January 2025)
- PLA-2476, Responds to Item 3 or Rev 1 to IE Bulletin 79-26.Computer Code Developed to Calculate Control Blade Depletion.No Control Blades Will Exceed 34% B-10 Depletion Averaged Over Upper 1/4 of Blade Before End of Second Cycle + (16:06:17, 6 January 2025)
- PLA-2485, Forwards Audited Financial Statements & Other Financial Info for Nov 1983 - Oct 1984,in Accordance w/10CFR50.71 + (16:06:19, 6 January 2025)
- PLA-2471, Forwards Reactor Pressure Vessel Internals Steam Dryer Rept Summarizing Indications Found During Unit 1 Refueling Outage,Per Request.Indications Will Not Impact Safe Operation of Facility.Related Info Encl + (16:06:22, 6 January 2025)
- ML18040B100 + (16:06:25, 6 January 2025)