Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18107A311 + (05:02:40, 6 January 2025)
- ML18107A308 + (05:02:41, 6 January 2025)
- ML18107A307 + (05:02:42, 6 January 2025)
- TAC:M83669 + (05:02:43, 6 January 2025)
- ML18107A304 + (05:02:45, 6 January 2025)
- ML18107A303 + (05:02:46, 6 January 2025)
- ML18107A302 + (05:02:47, 6 January 2025)
- LR-N99-0225, Monthly Operating Rept for Apr 1999 for Salem Unit 1.With + (05:02:48, 6 January 2025)
- ML18107A300 + (05:02:48, 6 January 2025)
- LR-N99-0226, Monthly Operating Rept for Apr 1999 for Salem Unit 2.With + (05:02:50, 6 January 2025)
- LR-N990238, Submits SG Tube Plugging Rept,Per Plant TS 4.4.6.5.a.Total of 47 Tubes Were Plugged During SG Tube Insps,Which Were Completed During Plant Tenth RFO + (05:02:53, 6 January 2025)
- ML18107A296 + (05:02:53, 6 January 2025)
- 05000272/LER-1999-002-02, :on 990413,determined That Number 12 Auxiliary Bldg Exhaust Fan Was Rotating Backwards.Caused by mis-wiring of Motor Due to Human Error by Maint technician.Mis-wiring Was Corrected & Fan Was Returned to Svc.With + (05:02:56, 6 January 2025)
- ML18107A290 + (05:02:57, 6 January 2025)
- ML18107A289 + (05:02:58, 6 January 2025)
- ML18107A288 + (05:02:59, 6 January 2025)
- LR-N990227, Forwards Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. COLR Rept Was Received by Util as Part of Reload SE + (05:03:00, 6 January 2025)
- ML18107A285 + (05:03:01, 6 January 2025)
- ML18107A281 + (05:03:02, 6 January 2025)
- 05000311/LER-1999-003-01, :on 990406,all Salem Unit 2 Chillers Rendered Inoperable.Caused by Human Error.Lessons Learned from Event Were Communicated to All Operators by Including Them in Night Orders.With + (05:03:04, 6 January 2025)
- 05000311/LER-1999-004-01, :on 990411,automatic Actuation of ESF Occurred During Reactor Vessel Head Removal in Support of Refueling Operations.Caused by High Radiation Condition.Containment Atmosphere Was Monitored.With + (05:03:06, 6 January 2025)
- IR 05000272/1999003 + (05:03:11, 6 January 2025)
- ML18107A275 + (05:03:12, 6 January 2025)
- 05000311/LER-1999-002-01, :on 990405,determined That Containment Isolation Valve Failed as Found Leakrate Test.Caused by Foreign Matl Blocking Valves from Closing.Check Valve Mechanically Agitated.With + (05:03:14, 6 January 2025)
- ML18107A272 + (05:03:15, 6 January 2025)
- ML18107A270 + (05:03:17, 6 January 2025)
- ML18107A269 + (05:03:18, 6 January 2025)
- ML18107A265 + (05:03:19, 6 January 2025)
- LR-N990196, Provides Clarification on Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting SBO & Loca/ LOOP Loading Requirements + (05:03:20, 6 January 2025)
- ML18107A258 + (05:03:22, 6 January 2025)
- ML18107A257 + (05:03:22, 6 January 2025)
- L-2018-091, Radiological Emergency Plan - Revision 67 + (05:03:23, 6 January 2025)
- ML18107A254 + (05:03:24, 6 January 2025)
- ML18107A253 + (05:03:25, 6 January 2025)
- L-2018-096, Radiological Emergency Plan - Revision 66 + (05:03:26, 6 January 2025)
- LR-N990200, Submits 30-day Fuel Clad Temp Rept for Salem Generating Station,Units 1 & 2.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Plant Large & Small LOCA & Small Break LOCA Analyses + (05:03:27, 6 January 2025)
- ML18107A250 + (05:03:28, 6 January 2025)
- ML18107A248 + (05:03:29, 6 January 2025)
- ML18107A246 + (05:03:30, 6 January 2025)
- ML18107A241 + (05:03:30, 6 January 2025)
- ML18107A240 + (05:03:31, 6 January 2025)
- LR-N990197, Forwards Corrected Response to NRC RAI Re Licensee Request for Change to TS Permissible Enrichment Values for New Fuel Storage.Incorrect Attachment Was Provided with Util to Nrc.Encl Supersedes 990412 Submittal + (05:03:32, 6 January 2025)
- ML18107A238 + (05:03:32, 6 January 2025)
- 05000311/LER-1999-001-03, :on 990330,MSSV Failed Lift Set Test.Caused by Setpoint Variance Which Is Result of Aging.Valves Were Adjusted & Retested to Ensure TS Tolerance.With + (05:03:35, 6 January 2025)
- ML18107A230 + (05:03:36, 6 January 2025)
- ML18107A229 + (05:03:37, 6 January 2025)
- ML18107A225 + (05:03:38, 6 January 2025)
- ML18107A220 + (05:03:39, 6 January 2025)
- ML18107A216 + (05:03:43, 6 January 2025)
- NL-18-020, Core Operating Limits Report for Cycle 24 + (05:03:44, 6 January 2025)
- ML18107A215 + (05:03:44, 6 January 2025)