Forwards Insp Repts 50-272/99-03 & 50-311/99-03 on 990315- 19.No Violations Were Identified
ML18107A275
Person / Time
Site: Salem  PSEG icon.png
Issue date: 05/03/1999
From: Lanning W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
Public Service Enterprise Group
Shared Package
ML18107A276 List:
References
50-272-99-03, 50-272-99-3, 50-311-99-03, 50-311-99-3, NUDOCS 9905120021
Download: ML18107A275 (4)


See also: IR 05000272/1999003

Text

..

Mr. Harold W. Keiser

President and Chief Nuclear Officer

Nuclear Business Unit

May 3, 1999

Public Service Electric and Gas Company (PSE&G)

Post Office Box 236

Hancocks Bridge, NJ 08038

SUBJECT:

NRC OPERATIONAL SAFETY TEAM INSPECTION REPORT 50-272/99-03,

50-311199-03

Dear Mr. Keiser:

The NRC conducted an Operational Safety Team Inspection (OSTI) at the Salem facilities from

March 15-19, 1999. The enclosed report presents the results of this inspection. On March 19,

1999 preliminary results were discussed with Mr. E. C. Simpson and other members of your

staff during an exit meeting held'at the Salem facility. The team performed a risk-informed,

performance-based inspection tcS evaluate specific activities in the Operations and Maintenance

functional areas, including corrective actions .

Overall the team concluded that operational and maintenance activities were acceptable to .

  • support continued safe plant operations. Operational activities were professionally conducted

and operations personnel continued to operate the plant safely during normal operations and

plant transients. Maintenance activities were properly conducted and provided adequate daily

support of operational activities. The team found that your oversight processes had recognized

a decline in performance associated with human performance errors, corrective action backlogs,

and work controls. Station management has been. responsive to these problems and has

implemented a number of recent initiatives to address these areas.

We found your corrective actions reasonable; however, additional time is necessary to validate

\\

the effectiveness of your implemented initiatives. The team determined that corrective action

~ \\

activities associated with significance level 1 corrective actions are not being adequately

resolved within established procedural goals. In order to ensure that corrective action activities

are accomplished in a timely manner continued management attention appears warranted. We

plan to assess your progress during future inspections.

--

-~--

. ----*-- *-

  • -

9905120021 990503

PDR

ADOCK 05000272

G

PDR

~I

Mr. Harold W. Keiser

2

In accordance with 10 CFR 2. 790 of the NRC's "Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room (PDR).

Docket Nos.: 50-272, 50-311

License Nos: DPR-70, DPR-75

Sincerely,

Wayne D. Lanning, Director

Division of Reactor Safety

Enclosures:

Inspection Report 50-272/99-03, 50-311/99-03

i

_
.

Mr. Harold W. Keiser

3

ccw/encl:

L. Storz, Senior Vice President - Nuclear Operations

E. Simpson, Senior Vice President - Nuclear Engineering

E. Salowitz, Director - Nuclear Business Support

A. F. Kirby, Ill, External Operations - Nuclear, Delmarva Power & Light Co.

D. Garchow, General Manager - Salem Operations

J. McMahon, Director - QNNuclear Training/Emergency Preparedness

D. Powell, Director, Licensing, Regulation and Fuels

R. Kankus, Joint Owner Affairs

A. Tapert, Program Administrator

J. J. Keenan, Esquire

M. J. Wetterhahn, Esquire

J. A. Isabella, Manager, Joint Generation

Atlantic Electric

Consumer Advocate, Office of Consumer Advocate

William Conklin, Public Safety Consultant, Lower Alloways Creek Township

Public Service Commission of Maryland

State of New Jersey

State of Delaware

Mr. Harold W. Keiser

4

Distribution w/encl:

Region I Docket Room {with concurrences)

Nuclear Safety Information Center {NSIC)

NRC Resident Inspector

PUBLIC

  • H. Miller, RA/J. Wiggins, DRA

W. Lanning, DRS

G. Meyer, DRP

L. Harrison, DRP

C. O'Daniell, DRP

DRS File

Distribution w/encl: {Via E-Mail)

G. Shear, OEDO

T. Madden, Congressional Affairs

W. Dean, NRR

P. Milano, PD1-2, NRR

Inspection Program Branch, NRR {IPAS)

R. Correia, NRR

DOC DESK

DOCUMENT NAME: G:\\PROGRAMS\\KAUFMAN\\SA990303.wpd

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with

attachment/enclosure "N" = No cop

OFFICE

RI/DRS

NAME

PKaufman

DATE

04/21/99

OFFICIAL RECORD COPY