Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18107A352 + (05:02:02, 6 January 2025)
- ML18107A351 + (05:02:03, 6 January 2025)
- ML18107A344 + (05:02:04, 6 January 2025)
- ML18107A341 + (05:02:05, 6 January 2025)
- ML18107A340 + (05:02:06, 6 January 2025)
- ML18107A339 + (05:02:07, 6 January 2025)
- ML18107A337 + (05:02:08, 6 January 2025)
- ML18107A334 + (05:02:09, 6 January 2025)
- ML18107A335 + (05:02:09, 6 January 2025)
- LR-N990254, Forwards Suppl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves. Encl Contains Methodology Used in Determination of Pressure Locking Susceptibility of PORVs Block Valves + (05:02:11, 6 January 2025)
- ML18107A332 + (05:02:11, 6 January 2025)
- LR-N990249, Forwards Redacted Response to NRC 990322 RAI Re Notification of Licensed Operator That Tested Positive for Alcohol. Attachment 2 Withheld,Per 10CFR2.790(a)(6) + (05:02:13, 6 January 2025)
- IR 05000272/1999002 + (05:02:31, 6 January 2025)
- ML18107A325 + (05:02:33, 6 January 2025)
- ML18107A319 + (05:02:34, 6 January 2025)
- ML18107A317 + (05:02:35, 6 January 2025)
- ML18107A318 + (05:02:35, 6 January 2025)
- ML18107A315 + (05:02:36, 6 January 2025)
- ML18107A314 + (05:02:37, 6 January 2025)
- ML18107A313 + (05:02:38, 6 January 2025)
- ML18107A312 + (05:02:38, 6 January 2025)
- ML18107A310 + (05:02:40, 6 January 2025)
- ML18107A311 + (05:02:40, 6 January 2025)
- ML18107A308 + (05:02:41, 6 January 2025)
- ML18107A307 + (05:02:42, 6 January 2025)
- TAC:M83669 + (05:02:43, 6 January 2025)
- ML18107A304 + (05:02:45, 6 January 2025)
- ML18107A303 + (05:02:46, 6 January 2025)
- ML18107A302 + (05:02:47, 6 January 2025)
- LR-N99-0225, Monthly Operating Rept for Apr 1999 for Salem Unit 1.With + (05:02:48, 6 January 2025)
- ML18107A300 + (05:02:48, 6 January 2025)
- LR-N99-0226, Monthly Operating Rept for Apr 1999 for Salem Unit 2.With + (05:02:50, 6 January 2025)
- LR-N990238, Submits SG Tube Plugging Rept,Per Plant TS 4.4.6.5.a.Total of 47 Tubes Were Plugged During SG Tube Insps,Which Were Completed During Plant Tenth RFO + (05:02:53, 6 January 2025)
- ML18107A296 + (05:02:53, 6 January 2025)
- 05000272/LER-1999-002-02, :on 990413,determined That Number 12 Auxiliary Bldg Exhaust Fan Was Rotating Backwards.Caused by mis-wiring of Motor Due to Human Error by Maint technician.Mis-wiring Was Corrected & Fan Was Returned to Svc.With + (05:02:56, 6 January 2025)
- ML18107A290 + (05:02:57, 6 January 2025)
- ML18107A289 + (05:02:58, 6 January 2025)
- ML18107A288 + (05:02:59, 6 January 2025)
- LR-N990227, Forwards Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. COLR Rept Was Received by Util as Part of Reload SE + (05:03:00, 6 January 2025)
- ML18107A285 + (05:03:01, 6 January 2025)
- ML18107A281 + (05:03:02, 6 January 2025)
- 05000311/LER-1999-003-01, :on 990406,all Salem Unit 2 Chillers Rendered Inoperable.Caused by Human Error.Lessons Learned from Event Were Communicated to All Operators by Including Them in Night Orders.With + (05:03:04, 6 January 2025)
- 05000311/LER-1999-004-01, :on 990411,automatic Actuation of ESF Occurred During Reactor Vessel Head Removal in Support of Refueling Operations.Caused by High Radiation Condition.Containment Atmosphere Was Monitored.With + (05:03:06, 6 January 2025)
- IR 05000272/1999003 + (05:03:11, 6 January 2025)
- ML18107A275 + (05:03:12, 6 January 2025)
- 05000311/LER-1999-002-01, :on 990405,determined That Containment Isolation Valve Failed as Found Leakrate Test.Caused by Foreign Matl Blocking Valves from Closing.Check Valve Mechanically Agitated.With + (05:03:14, 6 January 2025)
- ML18107A272 + (05:03:15, 6 January 2025)
- ML18107A270 + (05:03:17, 6 January 2025)
- ML18107A269 + (05:03:18, 6 January 2025)
- ML18107A265 + (05:03:19, 6 January 2025)
- LR-N990196, Provides Clarification on Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting SBO & Loca/ LOOP Loading Requirements + (05:03:20, 6 January 2025)