Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18113A597 + (04:43:05, 6 January 2025)
- 05000281/LER-1978-035-03, /03L-0:on 781007,during Cold Shutdown,Valve Pit Flooded While Draining Circulating Water Box D.Caused by Damage of Valve from Flooding + (04:43:06, 6 January 2025)
- 05000281/LER-1978-034-03, /03L-0:on 781006,w/unit at Cold Shutdown,Snubbers 2-RH-HSS-20 & 2-WFPD-HSS-9 Inoperable.Caused by Low Fluid Level.Defective Snubbers Dry Because of Leaking Rod Seals & Mechanical Damage to Seals.Snubbers Replaced + (04:43:08, 6 January 2025)
- ML18113A591 + (04:43:09, 6 January 2025)
- ML18113A590 + (04:43:11, 6 January 2025)
- IR 05000280/1978020 + (04:43:12, 6 January 2025)
- ML18113A586 + (04:43:14, 6 January 2025)
- ML18113A584 + (04:43:18, 6 January 2025)
- ML18113A581 + (04:43:18, 6 January 2025)
- ML18113A579 + (04:43:19, 6 January 2025)
- IR 05000280/1978019 + (04:43:20, 6 January 2025)
- ML18113A576 + (04:43:22, 6 January 2025)
- 05000281/LER-1978-032-03, /03L-0:on 780921,heat Tracing Circuit Manual Boration/Boric acid-to-blender Failed.Caused by Boric Acid Penetration of Heat Tracing Tape Circuits.Heat Tracing Tape Replaced + (04:43:24, 6 January 2025)
- 05000281/LER-1978-032, Forwards LER 78-032/03L-0 + (04:43:29, 6 January 2025)
- ML18113A569 + (04:43:31, 6 January 2025)
- ML18113A571 + (04:43:31, 6 January 2025)
- 05000280/LER-1978-029, Forwards LER 78-029/03L-0 + (04:43:35, 6 January 2025)
- 05000281/LER-1978-033, Forwards LER 78-033/03L-0 + (04:43:37, 6 January 2025)
- ML18113A556 + (04:43:38, 6 January 2025)
- ML18113A552 + (04:43:39, 6 January 2025)
- ML18113A550 + (04:43:40, 6 January 2025)
- ML18113A549 + (04:43:41, 6 January 2025)
- 05000281/LER-1978-011-03, /03X-1 on 780305:During Normal Full Pwr Oper,There Was No Svc Water Flow Thru Charging Pump Intermediate Seal Cooler 2-SW-E-1B,due to Failure of the Coolers Discharge Gate Valve + (04:43:46, 6 January 2025)
- ML18113A533 + (04:43:47, 6 January 2025)
- NRC 2018-0023, Response to Regulatory Information Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations + (04:43:51, 6 January 2025)
- ML18113A529 + (04:43:54, 6 January 2025)
- ML18113A524 + (04:43:55, 6 January 2025)
- L-78-114, Forwarding Report, CEN-89 (F)-P, Solutions to Increased Water Hold Peaking in Operating Reactors (St. Lucie-1), Dated March 10, 1978 + (04:43:56, 6 January 2025)
- L-78-136, Forwarding CEN-89(F)-P, Increased Water Hold Peaking in Operating Reactors (St. Lucie-1), Dated March 30, 1978 + (04:43:56, 6 January 2025)
- ML18113A520 + (04:43:57, 6 January 2025)
- ML18113A519 + (04:43:58, 6 January 2025)
- W3F1-2018-0020, Responses to Request for Additional Information Set 18 Regarding the License Renewal Application + (04:43:59, 6 January 2025)
- L-78-135, Forwarding Amendments 1 and 2 to Report CEN-79-P, Reactor Operation with Guide Tube Wear + (04:44:00, 6 January 2025)
- SBK-L-18077, Submittal of 2017 Annual Environmental Operating Report + (04:44:03, 6 January 2025)
- L-77-100, Forwards Annual Radiological Environmental Monitoring Report for 1/1-12/31/1976 + (04:44:04, 6 January 2025)
- ML18113A504 + (04:44:04, 6 January 2025)
- L-78-108, Annual Radiological Environmental Monitoring Report for the Period: 1-01-77 to 12-31-77 + (04:44:05, 6 January 2025)
- ML18113A483 + (04:44:09, 6 January 2025)
- ML18113A481 + (04:44:10, 6 January 2025)
- ML18113A482 + (04:44:10, 6 January 2025)
- ML18113A480 + (04:44:11, 6 January 2025)
- ML18113A469 + (04:44:13, 6 January 2025)
- IR 05000280/2018001 + (04:44:16, 6 January 2025)
- 05000335/LER-2076-009, Five Mechanical Piping Restraints Were Locked Up During Heatup for Post Core Hot Functional Testing + (04:44:18, 6 January 2025)
- 05000335/LER-2076-012, During Preoperational Testing, Main Steam Isolation Valves Did Not Close within 6 Seconds as Required by Tech Spec 4.7.1.5.b + (04:44:20, 6 January 2025)
- 05000335/LER-2076-013, During Preoperational Testing, Steam Auxiliary Feed Pump Would Not Start Properly from Hot Shutdown Control Panel + (04:44:22, 6 January 2025)
- 05000335/LER-2076-014, During Preoperational Testing, Outer Personnel Access Door to Containment Would Not Pass Air Leakage Test + (04:44:24, 6 January 2025)
- NL-18-0153, Withdrawal of Alternatives FNP-ISI-ALT-05-02 and VEGP-ISI-ALT-04-02 + (04:44:25, 6 January 2025)
- 05000335/LER-2076-016, During Preoperational Testing with Plant in Hot Standby, Control Room Air Conditioner Was Out of Service + (04:44:27, 6 January 2025)
- ML18113A444 + (04:44:28, 6 January 2025)
- 05000335/LER-2076-017, During Surveillance Test, Four Bistables Were Drifted Such That Their Trip Setpoints Were Less Conservative than Required by Tech Spec 3.3.2.1 + (04:44:29, 6 January 2025)