Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000272/LER-2078-020-04, Letter Reportable Occurrence of Missed Sampling of River Water for Biocide + (10:30:20, 5 January 2025)
- 05000272/LER-2076-022-03, Failure of No. 13 S/G Level Transmitter LT-538 + (10:30:21, 5 January 2025)
- 05000272/LER-2077-042-03, Inoperability of Channel III Pressurizer Level + (10:30:23, 5 January 2025)
- 05000272/LER-2078-080-03, Inoperability of 1B Diesel + (10:30:25, 5 January 2025)
- 05000272/LER-2078-024-04, Letter Reportable Occurrence on Excessive Concentration of Iodine in Milk Sample Collected at Environmental Sampling Location + (10:30:27, 5 January 2025)
- 05000272/LER-2078-025-03, Re Missed Tech. Specification Surveillance: 4.8.2.4.1 DC and 4.8.2.2 AC Breaker Alignment and Power Availability + (10:30:29, 5 January 2025)
- 05000272/LER-2078-028-03, No. 1 - Licensee Event Report 1978 for Reportable Occurrence 78-28/03L Re Inoperable 100 Ft. Elevation Air Lock Interior Door + (10:30:31, 5 January 2025)
- 05000272/LER-2078-030-03, Licensee Event Report 1978 for Reportable Occurrence 78-30/03L Re Control Bank and Shutdown Rod Misalignment + (10:30:33, 5 January 2025)
- 05000272/LER-2078-036-03, Licensee Event Report 1978 for Reportable Occurrence 78-36/03L Re Vital Bus Under Voltage Relay Setting Outside Technical Specification Limit + (10:30:35, 5 January 2025)
- 05000272/LER-2078-039-03, Licensee Event Report 1978 for Reportable Occurrence 78-39/03L Re No. 13 Containment Fan Foil Unit Inoperable + (10:30:37, 5 January 2025)
- 05000272/LER-2078-038-03, Licensee Event Report 1978 for Reportable Occurrence 78-38/03L Re No. 11 Steam Generator Flow Channel II Inoperable + (10:30:42, 5 January 2025)
- 05000272/LER-2078-043-03, LER 1978 for Reportable Occurrence 78-43/03L on Quadrant Power Tilt Ratio Greater than 1.02 + (10:30:44, 5 January 2025)
- 05000272/LER-2078-045-03, LER 1978 for Reportable Occurrence 78-45/03L on 100 Ft. Elevation Personnel Airlock Inoperable + (10:30:46, 5 January 2025)
- ML19031B498 + (10:30:47, 5 January 2025)
- ML19031B433 + (10:30:47, 5 January 2025)
- ML19031B402 + (10:30:48, 5 January 2025)
- ML19031B398 + (10:30:49, 5 January 2025)
- ML19031B401 + (10:30:49, 5 January 2025)
- ML19031B396 + (10:30:50, 5 January 2025)
- ML19031B393 + (10:30:51, 5 January 2025)
- ML19031B395 + (10:30:51, 5 January 2025)
- ND-19-0064, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.6.05.02.ii (Index Number 629) + (10:30:52, 5 January 2025)
- ML19031B388 + (10:30:52, 5 January 2025)
- ML19031B355 + (10:30:53, 5 January 2025)
- ML19031B343 + (10:30:54, 5 January 2025)
- ML19031B341 + (10:30:55, 5 January 2025)
- BSEP 19-0012, Submittal of 2018 Sea Turtle Annual Report + (10:30:59, 5 January 2025)
- ML19031B329 + (10:31:00, 5 January 2025)
- ML19031B323 + (10:31:00, 5 January 2025)
- ML19031B321 + (10:31:01, 5 January 2025)
- ML19031B322 + (10:31:01, 5 January 2025)
- ML19031B320 + (10:31:02, 5 January 2025)
- ML19031B310 + (10:31:03, 5 January 2025)
- ML19031B309 + (10:31:03, 5 January 2025)
- ML19031B307 + (10:31:04, 5 January 2025)
- ML19031B264 + (10:31:04, 5 January 2025)
- ML19031B257 + (10:31:05, 5 January 2025)
- ML19031B245 + (10:31:06, 5 January 2025)
- ML19031B249 + (10:31:06, 5 January 2025)
- ML19031B244 + (10:31:07, 5 January 2025)
- ML19031B242 + (10:31:08, 5 January 2025)
- ML19031B243 + (10:31:08, 5 January 2025)
- ML19031B229 + (10:31:09, 5 January 2025)
- ML19031B237 + (10:31:09, 5 January 2025)
- ML19031B228 + (10:31:10, 5 January 2025)
- ML19031B227 + (10:31:11, 5 January 2025)
- ML19031B226 + (10:31:14, 5 January 2025)
- ML19031B225 + (10:31:15, 5 January 2025)
- ML19031B223 + (10:31:15, 5 January 2025)
- ML19031B222 + (10:31:16, 5 January 2025)
- ML19031B221 + (10:31:17, 5 January 2025)