Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19059A323 + (09:34:32, 5 January 2025)
- ML19059A276 + (09:34:38, 5 January 2025)
- ML19059A275 + (09:34:39, 5 January 2025)
- ML19059A274 + (09:34:42, 5 January 2025)
- NRC-19-0019, Notice of Organization Change - Senior Vice President and Chief Nuclear Officer + (09:34:43, 5 January 2025)
- NRC-19-0017, Submittal of the Snubber Program Relief Request RR-S1 for the Fourth 10-Year Interval + (09:34:46, 5 January 2025)
- ML19059A253 + (09:34:47, 5 January 2025)
- ML19059A252 + (09:34:48, 5 January 2025)
- ML19059A230 + (09:34:50, 5 January 2025)
- ML19059A207 + (09:34:53, 5 January 2025)
- ML19059A206 + (09:34:54, 5 January 2025)
- ML19059A189 + (09:34:56, 5 January 2025)
- Inspection Manual Change Notice 19-009, Table of Contents for Inspection Manual Change Notice 19-009 + (09:34:57, 5 January 2025)
- L-2019-038, 2018 Annual Radioactive Effluent Release Report + (09:34:58, 5 January 2025)
- ML19059A178 + (09:34:59, 5 January 2025)
- ML19059A161 + (09:35:00, 5 January 2025)
- ML19059A162 + (09:35:00, 5 January 2025)
- ML19059A160 + (09:35:01, 5 January 2025)
- ML19059A158 + (09:35:02, 5 January 2025)
- ML19059A159 + (09:35:02, 5 January 2025)
- ML19059A156 + (09:35:03, 5 January 2025)
- ML19059A157 + (09:35:03, 5 January 2025)
- ML19059A155 + (09:35:04, 5 January 2025)
- Press Release-II-19-004, NRC Names Resident Inspector at Vogtle Nuclear Plant + (09:35:05, 5 January 2025)
- Press Release-II-19-003, NRC Announces Two Resident Inspectors at Vogtle Construction Site + (09:35:05, 5 January 2025)
- SECY-16-0142, Final Rule: Mitigation of Beyond-Design-Basis Events Backfitting and Issue Finality Assessment + (09:35:06, 5 January 2025)
- ML19059A148 + (09:35:08, 5 January 2025)
- ML19059A139 + (09:35:12, 5 January 2025)
- 05000255/LER-2019-002, Automatic Reactor Trip and AFW System Actuation Due to the Loss of Power to the RPS Bd Matrix + (09:35:14, 5 January 2025)
- ML19059A122 + (09:35:15, 5 January 2025)
- ML19059A120 + (09:35:19, 5 January 2025)
- ML19059A119 + (09:35:20, 5 January 2025)
- L-2019-047, Request for Exemption from 10 CFR 73.55(p)(1)(i) and (II) Related to the Suspension of Security Measures in an Emergency or During Severe Weather + (09:35:21, 5 January 2025)
- LR-N19-0005, Supplemental Information to License Amendment Request (LAR) to Amend the Hope Creek Technical Specifications (TS) to Revise Action for Inoperable Emergency Diesel Generator (Eog) a or B + (09:35:22, 5 January 2025)
- ML19059A084 + (09:35:24, 5 January 2025)
- ML19059A085 + (09:35:24, 5 January 2025)
- 05000255/LER-2019-001, Reactor Protection System and Auxiliary Feedwater System Actuation Due to Turbine Governor Valve Failure + (09:35:27, 5 January 2025)
- LR-N18-0127, Application to Revise Technical Specifications to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement + (09:35:31, 5 January 2025)
- ML19059A040 + (09:35:35, 5 January 2025)
- 05000254/LER-2018-004-01, Reactor Scram Due to Turbine-Generator Load Reject + (09:35:37, 5 January 2025)
- ML19059A029 + (09:35:38, 5 January 2025)
- ML19059A028 + (09:35:39, 5 January 2025)
- ML19059A027 + (09:35:39, 5 January 2025)
- PLA-7764, Guarantee of Payment of Deferred Premiums - 10 CFR 140.21 (PLA-7764) + (09:35:40, 5 January 2025)
- ML19059A023 + (09:35:41, 5 January 2025)
- L-19-045, Submittal of Retrospective Premium Guarantee + (09:35:42, 5 January 2025)
- ML19058A862 + (09:35:50, 5 January 2025)
- ML19058A833 + (09:35:57, 5 January 2025)
- ML19058A832 + (09:35:58, 5 January 2025)
- ML19058A831 + (09:35:58, 5 January 2025)
- ML19058A790 + (09:36:04, 5 January 2025)