Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000320/LER-1978-023-03, /03L-0:on 780325,while in Mode 4,only One Boron Source Flow Path Verified Operable Prior to Mode 4 Entry. Caused by Clerical Error in Surveillance + (05:48:50, 5 January 2025)
- 05000320/LER-1978-023, Forwards LER 78-023/03L-0 + (05:48:51, 5 January 2025)
- 05000320/LER-1978-011-03, /03L-0 on 780311:entered Mode 4 W/O Establishing Containment Integrity & Surveillance on Bldg Door Not Performed.Door Failure Caused by Damaged O Ring Seals + (05:48:53, 5 January 2025)
- 05000320/LER-1978-011, Forwards LER 78-011/03L-0 + (05:48:55, 5 January 2025)
- 05000320/LER-1978-002-03, /03L-0 on 780208:prior to Initial Refueling,Defect Found in Plate 6 of Seismic Instrumentation Triaxial Response Spectrum Recorder 714.Caused by Mfg Error + (05:48:57, 5 January 2025)
- 05000320/LER-1978-002, Forwards LER 78-002/03L-0 + (05:49:00, 5 January 2025)
- ML19206A576 + (05:49:01, 5 January 2025)
- 05000320/LER-1978-024-03, /03L-0 on 780404:while in Mode 5,nuclear Svc Closed Cooling Valve Failed to Open.Caused by Malfunction of Solenoid Operated Operator Pilot Valve + (05:49:03, 5 January 2025)
- 05000320/LER-1978-024, Forwards LER 78-024/03L-0 + (05:49:05, 5 January 2025)
- ML19206A572 + (05:49:06, 5 January 2025)
- ML19206A571 + (05:49:07, 5 January 2025)
- ML19206A569 + (05:49:08, 5 January 2025)
- ML19206A568 + (05:49:09, 5 January 2025)
- ML19206A567 + (05:49:10, 5 January 2025)
- ML19206A562 + (05:49:11, 5 January 2025)
- ML19206A561 + (05:49:12, 5 January 2025)
- ML19206A560 + (05:49:14, 5 January 2025)
- ML19206A559 + (05:49:15, 5 January 2025)
- ML19206A558 + (05:49:16, 5 January 2025)
- ML19206A557 + (05:49:17, 5 January 2025)
- ML19206A556 + (05:49:18, 5 January 2025)
- ML19206A554 + (05:49:19, 5 January 2025)
- ML19206A551 + (05:49:20, 5 January 2025)
- ML19206A550 + (05:49:21, 5 January 2025)
- ML19206A549 + (05:49:22, 5 January 2025)
- ML19206A548 + (05:49:23, 5 January 2025)
- ML19206A546 + (05:49:24, 5 January 2025)
- 05000320/LER-1978-034-01, /01T-0 on 780424:reactor Trip Caused Main Steam Relief Valves to Lift.Inadequate Design Caused Ejection of Several Steel Liners Used to Protect Bellows + (05:49:29, 5 January 2025)
- ML19206A543 + (05:49:31, 5 January 2025)
- 05000320/LER-1978-033-01, /01T-0 on 780423 Following Reactor Trip,Rcs Rapidly Cooled Down & Depressurized.Main Steam Relief Valves Did Not Reseat at Correct Pressure.Cause Unknown + (05:49:32, 5 January 2025)
- ML19206A541 + (05:49:34, 5 January 2025)
- ML19206A539 + (05:49:35, 5 January 2025)
- ML19206A538 + (05:49:36, 5 January 2025)
- ML19206A537 + (05:49:37, 5 January 2025)
- ML19206A536 + (05:49:38, 5 January 2025)
- ML19206A535 + (05:49:39, 5 January 2025)
- ML19206A533 + (05:49:40, 5 January 2025)
- ML19206A532 + (05:49:41, 5 January 2025)
- ML19206A531 + (05:49:42, 5 January 2025)
- ML19206A529 + (05:49:43, 5 January 2025)
- ML19206A528 + (05:49:44, 5 January 2025)
- ML19206A527 + (05:49:45, 5 January 2025)
- ML19206A524 + (05:49:46, 5 January 2025)
- ML19206A523 + (05:49:47, 5 January 2025)
- ML19206A522 + (05:49:49, 5 January 2025)
- ML19206A520 + (05:49:50, 5 January 2025)
- ML19206A519 + (05:49:51, 5 January 2025)
- ML19206A518 + (05:49:52, 5 January 2025)
- ML19206A515 + (05:49:53, 5 January 2025)
- ML19206A513 + (05:49:54, 5 January 2025)
- ML19206A511 + (05:49:55, 5 January 2025)