ML19206A538

From kanterella
Jump to navigation Jump to search
Responds to IE Circular 77-08.Advises That Primary & Secondary Sys Reviewed.Potential for Failure of Sample Probes Does Not Exist as They Are Not in Sys
ML19206A538
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/15/1977
From: Herbein J
Metropolitan Edison Co
To: O'Reilly J
NRC Office of Inspection & Enforcement (IE Region II)
References
GQL-0938, GQL-938, NUDOCS 7904200117
Download: ML19206A538 (1)


Text

A_T Q e, ?, 3g cgawL F#

-. m

~.a. - -,u METROPOLITAN EDISON COMPANY.

r T OFF'CC EOX 542 REA LNG. PENNsYLVANI A 196 3 TELEPHCNE 215 - 929 ^601 w,. ly, c;-,.94i GC 0938 Mr. J. P. O'Reilly, Directer U. S. Nuclear Regulatory CO 21ssion Office of Inspe *d - a-d Enf rce:ent Eegi:n I 631 Pa.h krecue ding Of Prussia, Pennsylvania 19hC6 Cear Sir:

? ee Mile Island Nuclear Stati:n Unit 2 (2C-2)

'icense N0. C??E-66 Oceket 50. 50-320 II Circular 77-08 II Circular 77-C0, dated April 13, 1977, concerns the failure of sanple p'eebes in light water reacters and states the need for veri-fication of tue integrity of similar : =penents in a facility while requesting assessment of the potential consequences should such a failure : ur.

Please be advised that the CC-2 primary and seccndary systems have been reviewed and the pctential for this failure does not exist in that the type of sa=ple prebe ander censideration d ec not exist in either systen at CC-2.

Sheuld you have any questiens, please : tact ne.

Sincerely, C

J. G. Herbein Vice President

-v.

V v. dm. ~e. < -,.

.m T.

Ernst 7:lgenau, Cirector Office of Inspection L 7

  1. --~a-a-:

U. S. Nuclear Eegulatory C--

'ssion u.

A <,.

v A

.) n

... 3.

i.s c

7904200//

l