Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19208A807 + (04:52:48, 5 January 2025)
- 05000293/LER-1979-032-01, /01T-0:on 790828,drywell Sump Containment Isolation Valves AO-7011A&B & AO-7017A&B Discovered Unqualified.Caused by High Radiation Exposure to Solenoid Valve Internals Constructed of Synthetic Matls + (04:52:50, 5 January 2025)
- 05000293/LER-1979-032, Forwards LER 79-032/01T-0 + (04:52:52, 5 January 2025)
- 05000317/LER-1979-034-03, /03L-0:on 790813,during Routine Surveillance Test, Control Element Assembly Deviation Exceeded 7.5 Inches Required to Initiate Assembly Motion Inhibit.Caused by Circuit Failing,W/High Conduction Affecting Other Failures + (04:52:53, 5 January 2025)
- 05000318/LER-1979-028-03, /03L-0:on 790902,during Surveillance Test,Control Element Assembly 43 Slipped to 100 Inches.Caused by Voltage Fluctuation in 15-volt Power Supply.Design Mod Initiated to Install Dual Power Supplies + (04:52:55, 5 January 2025)
- 05000317/LER-1979-034, Forwards LER 79-034/03L-0 + (04:52:57, 5 January 2025)
- 05000318/LER-1979-028, Forwards LER 79-028/03L-0 + (04:52:58, 5 January 2025)
- ML19208A797 + (04:53:00, 5 January 2025)
- ML19208A795 + (04:53:01, 5 January 2025)
- ML19208A796 + (04:53:01, 5 January 2025)
- ML19208A794 + (04:53:02, 5 January 2025)
- 05000312/LER-1979-009-03, /03L-0:on 790814,contrary to Tech Specs,Borated Water Storage Tank Had Less than Specified Boron Concentration.Reactor Shutdown Initiated & Boric Acid Added to Tank,Bringing Concentration Above Limit + (04:53:06, 5 January 2025)
- ML19208A791 + (04:53:08, 5 January 2025)
- ML19208A789 + (04:53:08, 5 January 2025)
- IR 05000266/1979009 + (04:53:10, 5 January 2025)
- ML19208A785 + (04:53:12, 5 January 2025)
- 05000312/LER-1979-009, Forwards LER 79-009/03L-0 + (04:53:14, 5 January 2025)
- ML19208A782 + (04:53:16, 5 January 2025)
- IR 05000409/1979015 + (04:53:20, 5 January 2025)
- ML19208A779 + (04:53:22, 5 January 2025)
- 05000271/LER-1979-020-03, /03L-0:on 790815,during Surveillance Testing of Msiv,Inboard Valve V2-80A in Main Steam Line Closed Properly But Did Not Fully Reopen.Caused by Spring Plate Binding on Guide Shaft + (04:53:23, 5 January 2025)
- 05000313/LER-1979-012, Forwards LER 79-012/03L-1 + (04:53:24, 5 January 2025)
- ML19208A773 + (04:53:27, 5 January 2025)
- ML19208A771 + (04:53:28, 5 January 2025)
- 05000277/LER-1979-037-03, /03L-0:on 790812,A&B Control Room Intake Air Radiation Monitors a & B Failed Downscale.Caused by Transistor Circuit Failure within Monitors.Monitor a Replaced & Monitor B Repaired + (04:53:30, 5 January 2025)
- 05000271/LER-1979-020, Forwards LER 79-020/03L-0 + (04:53:32, 5 January 2025)
- ML19208A762 + (04:53:34, 5 January 2025)
- ML19208A759 + (04:53:35, 5 January 2025)
- ML19208A760 + (04:53:35, 5 January 2025)
- ML19208A758 + (04:53:36, 5 January 2025)
- ML19208A756 + (04:53:40, 5 January 2025)
- TXX-3038, Informs NRC of Plans to Start Onsite Examination Activities Re Pipe Wall Thickness by 790920 + (04:53:40, 5 January 2025)
- ML19208A754 + (04:53:43, 5 January 2025)
- 05000029/LER-1979-020-03, /03L-0:on 790813,during Leak Rate Surveillance Testing on VD-TV-202,leakage Past Upstream Isolation Valves Stopped Test.Caused by Leakage in Seat of One or More Valves.Valves to Be Tested on 790908 + (04:53:44, 5 January 2025)
- ML19208A751 + (04:53:45, 5 January 2025)
- 05000368/LER-1979-065-03, /03L-0:on 790809,battery Charger 2D31 Failed, Rendering Dc Bus a Inoperable.Caused by Dc Output Lamp Socket Burning Up Due to Higher Voltage & Increased Resistance in Circuit.Unit Cleaned + (04:53:46, 5 January 2025)
- ML19208A749 + (04:53:47, 5 January 2025)
- ML19208A747 + (04:53:48, 5 January 2025)
- 05000029/LER-1979-020, Forwards LER 79-020/03L-0 + (04:53:49, 5 January 2025)
- ML19208A744 + (04:53:51, 5 January 2025)
- ML19208A743 + (04:53:52, 5 January 2025)
- ML19208A741 + (04:53:53, 5 January 2025)
- 05000344/LER-1979-013-03, /03L-0:on 790807,seismic Restraint on Containment Spray Suction Piping Nonfunctional.Base Plate of Pedestal Support Slid Off Graphite Plate & Cracked Plate.Support Redesigned,Repaired & Returned to Svc + (04:53:55, 5 January 2025)
- 05000368/LER-1979-063-03, /03L-0:on 790806,containment Atmosphere Sample Reactor Bldg Penetration Outside Isolation Valve 2SV-8263-2 Would Not Indicate Closed During Stroke Test.Caused by Limit Switch Being Out of Adjustment.Limit Adjusted + (04:53:56, 5 January 2025)
- 05000277/LER-1979-040-01, /01T-0:on 790821,contract Personnel Disarmed Carbon Dioxide Sys & Established Fire Watch.Caused by Personnel Error.Sys Restored to Normal & Personnel Involved Received Instruction on Work Requirements + (04:54:01, 5 January 2025)
- ML19208A734 + (04:54:02, 5 January 2025)
- 05000324/LER-1979-073-03, /03L-0:on 790813,RHR Pump Breaker 2A Was Erroneously Racked Out,Making Both Loops of Sys Inoperable. Caused by Incorrect Prepration of Tag & tag-out Sheet by Control Operator.Personnel Instructed + (04:54:03, 5 January 2025)
- 05000277/LER-1979-040, Forwards LER 79-040/01T-0 + (04:54:05, 5 January 2025)
- ML19208A730 + (04:54:07, 5 January 2025)
- ML19208A728 + (04:54:08, 5 January 2025)
- 05000324/LER-1979-073, Forwards LER 79-073/03L-0 + (04:54:09, 5 January 2025)