Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19242C563 + (18:25:10, 4 January 2025)
- ML19242C561 + (18:25:11, 4 January 2025)
- ML19242C560 + (18:25:13, 4 January 2025)
- ML19242C554 + (18:25:14, 4 January 2025)
- ML19242C552 + (18:25:15, 4 January 2025)
- ML19242C550 + (18:25:16, 4 January 2025)
- ML19242C548 + (18:25:17, 4 January 2025)
- ML19242C542 + (18:25:18, 4 January 2025)
- ML19242C545 + (18:25:18, 4 January 2025)
- ML19242C541 + (18:25:19, 4 January 2025)
- IR 05000482/1979004 + (18:25:20, 4 January 2025)
- ML19242C533 + (18:25:22, 4 January 2025)
- ML19242C529 + (18:25:23, 4 January 2025)
- ML19242C528 + (18:25:24, 4 January 2025)
- ML19242C526 + (18:25:25, 4 January 2025)
- ML19242C525 + (18:25:26, 4 January 2025)
- ML19242C524 + (18:25:27, 4 January 2025)
- ML19242C520 + (18:25:28, 4 January 2025)
- ML19242C518 + (18:25:29, 4 January 2025)
- ML19242C517 + (18:25:34, 4 January 2025)
- ML19242C516 + (18:25:34, 4 January 2025)
- ML19242C514 + (18:25:35, 4 January 2025)
- ML19242C513 + (18:25:36, 4 January 2025)
- ML19242C512 + (18:25:37, 4 January 2025)
- ML19242C510 + (18:25:38, 4 January 2025)
- ML19242C509 + (18:25:39, 4 January 2025)
- 05000346/LER-1979-074-03, /03L-0 on 790707:auxiliary Feedwater Pump 1-2 suction-before-strainer Pressure Switch PSL-4929B Actuated at Pressure Input Outside Allowable Tolerance.Caused by Component Failure Due to Misapplication.Switch Replaced + (18:25:41, 4 January 2025)
- 05000346/LER-1979-074, Forwards LER 79-074/03L-0 + (18:25:44, 4 January 2025)
- 05000277/LER-1979-034-03, /03L-0 on 790703:following Surveillance Flow Test, Core Spray Loop a Test Valve MO2-14-26A Failed to Fully Close.Caused by backed-out & Distorted Valve Seat Ring.Pipe Hanger Repaired.Valve Repair Delayed Pending Unit Outage + (18:25:47, 4 January 2025)
- 05000317/LER-1979-024-04, /04T-0 on 790712:while Regenerating Condensate Deep Bed Demineralizer,Caustic Solution Discharge Occurred. Caused by Equipment Malfunction.Affected Valve Will Be Repaired + (18:25:49, 4 January 2025)
- 05000317/LER-1979-024, Forwards LER 79-024/04T-0 + (18:25:50, 4 January 2025)
- ML19242C497 + (18:25:54, 4 January 2025)
- 05000312/LER-1979-007-01, /01T-0:on 790720,during Normal Operation,Analysis of Pipe Support Base Plate Design Using Concrete Expansion Anchor Bolts Indicated That Six safety-related Anchors at Facility Failed to Meet IE Bulletin 79-02,Criterion 2 + (18:25:56, 4 January 2025)
- ML19242C491 + (18:25:57, 4 January 2025)
- 05000312/LER-1979-007, Forwards LER 79-007/01T-0 + (18:25:59, 4 January 2025)
- ML19242C485 + (18:26:00, 4 January 2025)
- ML19242C484 + (18:26:01, 4 January 2025)
- ML19242C482 + (18:26:02, 4 January 2025)
- 05000289/LER-1979-014-04, /04T-0 on 790626:informed by Consultant That Sediment Showed Co-58 Levels Exceeding Control Station Value.Caused by Increased Vol of Liquid Radioactive Waste.No Corrective Action Planned + (18:26:06, 4 January 2025)
- ML19242C478 + (18:26:11, 4 January 2025)
- ML19242C479 + (18:26:11, 4 January 2025)
- 05000289/LER-1979-014, Forwards LER 79-014/04T-0 + (18:26:15, 4 January 2025)
- 05000302/LER-1979-064, Suppl Info to LER 79-064/04L-0 on 790727:difference of More than Two Std Deviations Discovered Between Preoperational & Operational Study in Metabolic Functions of Aquatic Sys. Caused by Natural or Seasonal Variations + (18:26:17, 4 January 2025)
- ML19242C470 + (18:26:18, 4 January 2025)
- ML19242C467 + (18:26:19, 4 January 2025)
- 05000245/LER-1979-019-03, /03L-0 on 790628:two Feedwater Sys Check Valves, One Inboard & One Outboard (1-FW-9A,10A) Found Leaking in Excess of Tech Specs.Caused by Normal Deterioration of Seating Surface.Seal Ring Wear Valves Reworked + (18:26:22, 4 January 2025)
- 05000334/LER-1979-018-03, /03L-0 on 790703:while Switching Vital Bus 3 to Alternate Source Containment Isolation,Phase B Actuation Occurred.Caused by Hi-Hi Containment Pressure.Revised Procedure for Transferring Vital Bus + (18:26:24, 4 January 2025)
- 05000334/LER-1979-018, Forwards LER 79-018/03L-0 + (18:26:26, 4 January 2025)
- ML19242C462 + (18:26:27, 4 January 2025)
- ML19242C461 + (18:26:28, 4 January 2025)
- 05000245/LER-1979-019, Forwards LER 79-019/03L-0 + (18:26:29, 4 January 2025)