Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000250/1986011 + (06:50:09, 4 December 2024)
- TXX-6113, Forwards Vols I & II of Comanche Peak Response Team Results Repts + (06:50:10, 4 December 2024)
- 05000324/LER-1986-016-01, :on 860711,automatic Scram Signal Occurred Due to Reactor Low Level During Warmup Flush of Unit RHR Loop B. Caused by Failure to Terminate Warmup Flush Prior to Reactor Level Decreasing to lo-lo Setpoint + (06:50:11, 4 December 2024)
- ML20214J881 + (06:50:12, 4 December 2024)
- ML20214J882 + (06:50:12, 4 December 2024)
- ML20214J878 + (06:50:13, 4 December 2024)
- ML20214J877 + (06:50:14, 4 December 2024)
- ML20214J874 + (06:50:15, 4 December 2024)
- ML20214J872 + (06:50:15, 4 December 2024)
- ML20214J868 + (06:50:16, 4 December 2024)
- ML20214J869 + (06:50:16, 4 December 2024)
- ML20214J867 + (06:50:17, 4 December 2024)
- 05000309/LER-1986-004, :on 860709,emergency Feedwater Pump Found Inoperable Due to Intermittent Contact of Charging Motor Secondary Coupler.Caused by Bent Coupler Pin Tip Which Prevented Connection.Coupler Replaced + (06:50:18, 4 December 2024)
- ML20214J864 + (06:50:19, 4 December 2024)
- ML20214J865 + (06:50:19, 4 December 2024)
- ML20214J862 + (06:50:20, 4 December 2024)
- IR 05000309/1987005 + (06:50:21, 4 December 2024)
- ML20214J860 + (06:50:21, 4 December 2024)
- PY-CEI-NRR-0656, Forwards Rept of Changes to Initial Test Program,Including Changes Made from 870427-0504.Changes Made in Accordance W/ License Condition 2.C(4) & 10CFR50.59 + (06:50:22, 4 December 2024)
- ML20214J857 + (06:50:23, 4 December 2024)
- ML20214J853 + (06:50:24, 4 December 2024)
- ML20214J852 + (06:50:24, 4 December 2024)
- ML20214J851 + (06:50:25, 4 December 2024)
- 05000374/LER-1986-011-01, :on 860601,feedwater Transient Occurred Causing Reactor Vessel Level to Drop to Level 3 Trip Setpoint.Caused by Failure of Reactor Vessel Level 3 Switches.Action Plan Has Been Developed + (06:50:27, 4 December 2024)
- ML20214J846 + (06:50:27, 4 December 2024)
- ML20214J844 + (06:50:28, 4 December 2024)
- IR 05000341/1987014 + (06:50:32, 4 December 2024)
- ML20214J839 + (06:50:33, 4 December 2024)
- ML20214J838 + (06:50:34, 4 December 2024)
- W3P87-1063, Forwards Response to NRC 870406 Request for Addl Info Re Analyses Conducted for Pressurizer Safety Valve Piping & Supports,Per 821229 Response to Item II.D.1 of NUREG-0737 + (06:50:34, 4 December 2024)
- ML20214J833 + (06:50:36, 4 December 2024)
- ML20214J832 + (06:50:36, 4 December 2024)
- ML20214J829 + (06:50:37, 4 December 2024)
- ML20214J830 + (06:50:37, 4 December 2024)
- ML20214J828 + (06:50:38, 4 December 2024)
- IR 05000498/1987018 + (06:50:39, 4 December 2024)
- ML20214J825 + (06:50:40, 4 December 2024)
- ML20214J822 + (06:50:41, 4 December 2024)
- ML20214J821 + (06:50:44, 4 December 2024)
- ML20214J818 + (06:50:45, 4 December 2024)
- ML20214J814 + (06:50:46, 4 December 2024)
- AECM-86-0226, Forwards Vols I & II to Grand Gulf Nuclear Station Unit 1 Dcrdr Summary Rept... & Proposed Schedule for Implementation of Mods for Review by Mar 1987 + (06:50:47, 4 December 2024)
- ML20214J812 + (06:50:47, 4 December 2024)
- ML20214J809 + (06:50:48, 4 December 2024)
- ML20214J810 + (06:50:48, 4 December 2024)
- ML20214J808 + (06:50:50, 4 December 2024)
- 05000259/LER-1987-008-01, :on 870420,phase-to-phase Short Occurred in Diesel Generator Control Cabinet Contacts During Monthly Surveillance Test Performance.Caused by Failure of Potential Transformer Fuse Contacts + (06:50:51, 4 December 2024)
- ML20214J806 + (06:50:52, 4 December 2024)
- IR 05000498/1987022 + (06:50:53, 4 December 2024)
- ML20214J803 + (06:50:54, 4 December 2024)
- ML20214J801 + (06:50:54, 4 December 2024)