Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214M559 + (06:29:09, 4 December 2024)
- ML20214M554 + (06:29:10, 4 December 2024)
- ML20214M556 + (06:29:10, 4 December 2024)
- ML20214M553 + (06:29:11, 4 December 2024)
- RBG-25995, Responds to Generic Ltr 87-06, Periodic Verification of Leak Tight Integrity of Pressure Isolation Valves. Leak Testing Performed Every 18 Months at Facility,Including High Pressure Tests at 1,025 Psig,Per Tech Specs + (06:29:12, 4 December 2024)
- ML20214M548 + (06:29:13, 4 December 2024)
- ML20214M546 + (06:29:14, 4 December 2024)
- ML20214M545 + (06:29:15, 4 December 2024)
- ML20214M542 + (06:29:16, 4 December 2024)
- ML20214M541 + (06:29:20, 4 December 2024)
- ML20214M538 + (06:29:21, 4 December 2024)
- RBG-24023, Monthly Operating Rept for June 1986 + (06:29:22, 4 December 2024)
- ML20214M535 + (06:29:22, 4 December 2024)
- ML20214M531 + (06:29:23, 4 December 2024)
- PNO-V-86-060, on 860903,reactor Feedwater Pump B Tripped Due to Failure of Overspeed Controls.Caused by Partial Control Valve Closure Re Tripping of Hydraulic Power Units. Investigation Underway + (06:29:24, 4 December 2024)
- ML20214M528 + (06:29:25, 4 December 2024)
- ML20214M525 + (06:29:27, 4 December 2024)
- ML20214M522 + (06:29:28, 4 December 2024)
- ML20214M519 + (06:29:28, 4 December 2024)
- ML20214M517 + (06:29:30, 4 December 2024)
- ML20214M513 + (06:29:30, 4 December 2024)
- ML20214M511 + (06:29:32, 4 December 2024)
- W3P87-1376, Forwards Draft Waterford 3 Nuclear Plant Island Structure Basemat Summary Rept, Per 870331 Agreement.Final Rept Will Be Submitted by 870701 + (06:29:33, 4 December 2024)
- ML20214M508 + (06:29:33, 4 December 2024)
- ML20214M503 + (06:29:35, 4 December 2024)
- ML20214M495 + (06:29:36, 4 December 2024)
- ML20214M493 + (06:29:37, 4 December 2024)
- ML20214M490 + (06:29:38, 4 December 2024)
- ML20214M488 + (06:29:39, 4 December 2024)
- ML20214M487 + (06:29:40, 4 December 2024)
- ML20214M485 + (06:29:41, 4 December 2024)
- ML20214M484 + (06:29:42, 4 December 2024)
- IR 05000456/1987017 + (06:29:53, 4 December 2024)
- 05000338/LER-1987-006-01, :on 870430, as Found Dropout Voltages for Undervoltage Relay Found Below Min Allowable Value Stated in Periodic Test & Immediately Recalibr.Caused by Setpoint Drift.Periodic Test Revised + (06:29:57, 4 December 2024)
- ML20214M477 + (06:29:57, 4 December 2024)
- ML20214M474 + (06:29:58, 4 December 2024)
- ML20214M473 + (06:29:59, 4 December 2024)
- W3P87-1067, Responds to NRC Ltr Re Violation Noted in Insp Rept 50-382/87-06.Corrective Actions:Completed Shipping Records Placed in lockable,1 H Rated Fireproof Filing Cabinet Purchased & Received on 870406 + (06:29:59, 4 December 2024)
- ML20214M471 + (06:30:00, 4 December 2024)
- ML20214M468 + (06:30:01, 4 December 2024)
- ML20214M466 + (06:30:02, 4 December 2024)
- 05000251/LER-1986-014, :on 860805,while Tests 4-OSP-089 & TOP-233 Being Performed,Subcritical Reactor Trip Occurred.Caused by Personnel Oversight in Preparing TOP-233 to Ensure at Power Trip Signals Clear.Procedure Reviewed + (06:30:04, 4 December 2024)
- ML20214M462 + (06:30:04, 4 December 2024)
- ML20214M459 + (06:30:05, 4 December 2024)
- ML20214M456 + (06:30:06, 4 December 2024)
- ML20214M454 + (06:30:07, 4 December 2024)
- ML20214M453 + (06:30:08, 4 December 2024)
- IR 05000128/1986002 + (06:30:09, 4 December 2024)
- ML20214M448 + (06:30:10, 4 December 2024)
- ML20214M447 + (06:30:11, 4 December 2024)
- ML20214M440 + (06:30:12, 4 December 2024)