Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19325C410 + (22:49:19, 31 December 2024)
- ML19325C412 + (22:49:19, 31 December 2024)
- ML19325C409 + (22:49:20, 31 December 2024)
- ML19325C408 + (22:49:21, 31 December 2024)
- 05000344/LER-1989-018, :on 890908,both Train a & Train B of RHR Became Inoperable at Same Time.Caused by Inadequate Communication Between Shifts.Train a of Component Cooling Water Sys & RHR Restored to Svc + (22:49:23, 31 December 2024)
- 05000278/LER-1989-003-03, :on 890808,subsequent Sys Walkdown & Analysis Revealed That as-found Configuration Would Result in Piping Stresses Adjacent to Valves Exceeding Code Limits.Caused by Design & Installation Error + (22:49:27, 31 December 2024)
- ML19325C403 + (22:49:28, 31 December 2024)
- ML19325C401 + (22:49:30, 31 December 2024)
- ML19325C398 + (22:49:31, 31 December 2024)
- ML19325C397 + (22:49:34, 31 December 2024)
- ML19325C396 + (22:49:40, 31 December 2024)
- ML19325C395 + (22:49:46, 31 December 2024)
- ML19325C393 + (22:49:52, 31 December 2024)
- ML19325C394 + (22:49:52, 31 December 2024)
- TAC:74807 + (22:49:53, 31 December 2024)
- ML19325C392 + (22:49:53, 31 December 2024)
- ML19325C390 + (22:49:54, 31 December 2024)
- ML19325C389 + (22:49:55, 31 December 2024)
- ML19325C387 + (22:50:01, 31 December 2024)
- IR 05000397/1989025 + (22:50:07, 31 December 2024)
- U-601541, Forwards Rev 1 to Updated FSAR for Clinton Power Station & 10CFR50.59 Repts of Changes for Jan-Mar 1989.Updated FSAR Reflects Changes Through Mar 1989 + (22:50:08, 31 December 2024)
- ML19325C382 + (22:50:15, 31 December 2024)
- ML19325C380 + (22:50:21, 31 December 2024)
- PLA-3277, Forwards Change DD to Physical Security Plan.Change Withheld (Ref 10CFR73.21) + (22:50:27, 31 December 2024)
- ML19325C379 + (22:50:27, 31 December 2024)
- ML19325C375 + (22:50:34, 31 December 2024)
- ML19325C374 + (22:50:41, 31 December 2024)
- NLS8900382, Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling Model S350W Swing Check Valves or Valves of Similar Design. No Such Valves in Svc at Plant + (22:50:44, 31 December 2024)
- ML19325C372 + (22:50:51, 31 December 2024)
- 05000317/LER-1989-017, :on 890907,determined That Discrepancy in Acceptance Criteria of Surveillance Test Procedure M-452-0 Resulted in Failure to Fully Comply W/Requirements of Tech Spec 3.9.12.Main Cause Undetermined + (22:50:53, 31 December 2024)
- ML19325C368 + (22:50:59, 31 December 2024)
- ML19325C367 + (22:51:05, 31 December 2024)
- ML19325C365 + (22:51:11, 31 December 2024)
- ML19325C363 + (22:51:17, 31 December 2024)
- LD-89-111, Provides Update to Rev 4 of Physical Security Plan Amend Submitted on 890420.Encl Withheld (Ref 10CFR2.790(d)) + (22:51:23, 31 December 2024)
- 0CAN108903, Responds to Violations Noted in Insp Repts 50-313/89-30 & 50-368/89-30.Corrective Actions:Procedure Revised to Incorporate Steps to Ensure 1/4 Inch Gap Between Ends of Each Packing Ring & Proper Orientation of Gaps + (22:51:25, 31 December 2024)
- ML19325C358 + (22:51:32, 31 December 2024)
- ML19325C352 + (22:51:36, 31 December 2024)
- ML19325C351 + (22:51:37, 31 December 2024)
- ML19325C350 + (22:51:42, 31 December 2024)
- JPN-89-064, Forwards Status Rept on Response to NRC Generic Ltr 89-04, Guidance on Developing Acceptable Inservice Testing Programs. Rescoping Process,Testing Rev & Procedural Changes Will Require 16 Wks to Complete + (22:51:51, 31 December 2024)
- 05000259/LER-1989-020, :on 890908,analysis Revealed That Valve Yokes for Core Spray Sys Min Flow Bypass Valves Would Exceed Allowable Yield Stress.Caused by Design Error in Original Analysis.Review of Valves Performed + (22:51:54, 31 December 2024)
- ML19325C341 + (22:51:55, 31 December 2024)
- TAC:44303 + (22:52:05, 31 December 2024)
- ML19325C336 + (22:52:11, 31 December 2024)
- A07992, States Belief That Development & Addition of New Procedures to Implement Safeguards Contingency Plans of Plants as Required by 10CFR50.34(d) Addresses Possibility of Land Vehicle Bomb,Per Provisions of Generic Ltr 89-07 & Suppl + (22:52:17, 31 December 2024)
- ML19325C330 + (22:52:24, 31 December 2024)
- ML19325C331 + (22:52:24, 31 December 2024)
- ML19325C326 + (22:52:33, 31 December 2024)
- ML19325C325 + (22:52:39, 31 December 2024)
- ML19325C323 + (22:52:45, 31 December 2024)