Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19325D242 + (22:36:27, 31 December 2024)
- ML19325D240 + (22:36:34, 31 December 2024)
- ML19325D238 + (22:36:35, 31 December 2024)
- 05000313/LER-1989-028, :on 890912,extra Contact Found in Control Circuits for Svc Water Pumps P4A & P4C Which Was Not on Schematics.Caused by Inadequate Configuration Control During Design Phases.Wiring Insps Program Initiated + (22:36:39, 31 December 2024)
- ML19325D235 + (22:36:41, 31 December 2024)
- ML19325D236 + (22:36:41, 31 December 2024)
- ML19325D234 + (22:36:42, 31 December 2024)
- ML19325D233 + (22:36:46, 31 December 2024)
- TAC:74898 + (22:36:47, 31 December 2024)
- ML19325D232 + (22:36:48, 31 December 2024)
- ML19325D231 + (22:36:49, 31 December 2024)
- ML19325D229 + (22:36:50, 31 December 2024)
- IR 05000333/1989009 + (22:36:56, 31 December 2024)
- ML19325D226 + (22:36:58, 31 December 2024)
- ML19325D225 + (22:37:00, 31 December 2024)
- IR 05000416/1989021 + (22:37:03, 31 December 2024)
- ML19325D222 + (22:37:07, 31 December 2024)
- ML19325D219 + (22:37:08, 31 December 2024)
- ML19325D218 + (22:37:09, 31 December 2024)
- ML19325D213 + (22:37:10, 31 December 2024)
- ML19325D212 + (22:37:12, 31 December 2024)
- ML19325D210 + (22:37:13, 31 December 2024)
- PY-CEI-NRR-1076, Monthly Operating Rept for Sept 1989 for Perry Nuclear Plant Unit 1,per Tech Spec 6.9.1.8 + (22:37:13, 31 December 2024)
- ML19325D206 + (22:37:16, 31 December 2024)
- ML19325D207 + (22:37:16, 31 December 2024)
- ML19325D205 + (22:37:17, 31 December 2024)
- ML19325D204 + (22:37:18, 31 December 2024)
- ML19325D202 + (22:37:19, 31 December 2024)
- ML19325D203 + (22:37:19, 31 December 2024)
- NMP2L2713, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Increase Allowable MSIV Leakage Rates + (22:37:20, 31 December 2024)
- ML19325D199 + (22:37:21, 31 December 2024)
- ML19325D197 + (22:37:22, 31 December 2024)
- ML19325D196 + (22:37:22, 31 December 2024)
- 3F1089-06, Monthly Operating Rept for Sept 1989 for Crystal River Unit 3 + (22:37:23, 31 December 2024)
- ML19325D194 + (22:37:25, 31 December 2024)
- ML19325D193 + (22:37:29, 31 December 2024)
- IR 05000424/1989024 + (22:37:30, 31 December 2024)
- ML19325D188 + (22:37:31, 31 December 2024)
- 05000293/LER-1989-028, :on 890907,HPCI Sys Declared Inoperable Because Mechanical Overspeed Trip Occurred During Surveillance Test. Caused by Failure of Ramp Generator Signal Converter Module. Module Removed & Sent to Mfg for Exam + (22:37:35, 31 December 2024)
- ML19325D185 + (22:37:36, 31 December 2024)
- ML19325D184 + (22:37:36, 31 December 2024)
- ML19325D183 + (22:37:37, 31 December 2024)
- ML19325D182 + (22:37:38, 31 December 2024)
- ML19325D181 + (22:37:40, 31 December 2024)
- ML19325D180 + (22:37:40, 31 December 2024)
- AECM-89-0190, Monthly Operating Rept for Sept 1989 for Grand Gulf Nuclear Unit 1 + (22:37:41, 31 December 2024)
- ML19325D178 + (22:37:43, 31 December 2024)
- ML19325D174 + (22:37:47, 31 December 2024)
- ML19325D172 + (22:37:48, 31 December 2024)
- 05000325/LER-1989-019, :on 890914,determined That Svc Water Sys May Not Have Met Design Requirements Under Certain worst-case Conditions.Caused by Failure of Startup Testing to Detect Inadequacies.Assessment of Event Initiated + (22:37:49, 31 December 2024)
- ML19325D169 + (22:37:52, 31 December 2024)