ML19325D231
| ML19325D231 | |
| Person / Time | |
|---|---|
| Site: | 07001100 |
| Issue date: | 10/06/1989 |
| From: | Della Ratta A, Keimig R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19325D230 | List: |
| References | |
| 70-1100-89-05, 70-1100-89-5, NUDOCS 8910190221 | |
| Download: ML19325D231 (2) | |
Text
twp -
-m q'A.qj -
,w r j[b;g_;j. '" '
)J:
e o
i
-l'.
i
,. s Y
U.S. NUCLEAR REGULATORY COMMISSION l'
s REGION I 1
.i n
Report No. :70-1100/89 ~;
L Docket No.. '70-1100 e
4 License No'.'SNM-1067 Safeguards Group. III p.
Licensee':
Comb'ustion Engineering.-Inc.
- D. ;
H.6
'P. O. Box 500
- Windsor, Connecticut 06095
- Facility Name
Combustion Engineering-Nuclear Fuel Manufacturing 4
Inspection'At: Windsor, Connecticut Inspection Conducted:
September 27-29 -1989
?
Type.of: Inspection:
Routine, Unannounced Physical Security Inspector:
/Y7/ M
/'
/#"I p A.'Della-Ratta, Safegu&rd(Audit 6r date 7
- Approved by:c nE4~
//>- 4-/9
- f. R. Keiliiicft-GMef, feguards Section date Division;of'Radiati Safety and' Safeguards b
LI'nspectiobSummary:
Routine, Unannounced Physical Security Inspection on September 27-29, 1989 (Report No. 70-1100/89-05) l^
Areas Inspected:
Physical protection measures for special nuclear material of low strategic significance.
m
-- Re sul ts :
The 11censee was~1n compliance with NRC requiremerts in the area 1
examined.during this' inspection.
8910190221 891006 PDR ADOCK 07001100 C
PDC L
v
Z c y..
. $.M...i.
4.
{ d..,,
e j
DETAILS b
1.
Key Persons Contacted P. McGill, Vice President, Nuclear Fuel Manufacturing 3
r
- C. Waterman Vice President and General Manager, Nuclear Fuel Manufacturing
- R. Vaughn, Manager, Operations
- R. Sheeran, Manager, Accountability and Security l
K. Butenas, Accountability Specialist R.'Duncan, Director, Product Development e
F. White, Security. Supervisor J. Lucero, Supervisor Site Security Operations
~K. Keating, Site Security
'The inspector also interviewed other licensee employees involved with physical - security.
- present at exit interview 2.-
General Recuirements for the Protection of Special Nuclear Material of Low Strategic Significance s
i The licensee.was protecting special nuclear material of low strategic
. significance in conformance with the NRC-approved physical security plan (the Plan).- The inspector confirmed this by examining barriers, access controls,-key control and procedures, and by observations of a licensee test-of alarm system features. The inspector verified that
, implementation of the Plan met the general performance requirements and
' objectives of the governing regulations.
~ 3.
Exit Interview The inspector met with the licensee representatives indicated in paragraph 1 at the completion of the inspection on September 29,-1989 and
. summarized the scope and findings of the inspection.
~At no time during this inspection was written material provided to the p
. licensee by the inspector.
E
~ ^
\\
~
. - - - - - -