Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000250/LER-1979-015-03, /03L-0 on 790426:B Emergency Diesel Generator Failed Loading Acceptance Criteria.Caused by Cracked half-inch Nipple to Fuel Pump Which Resulted in Partial Fuel Starvation.Nipple Replaced & Old Nipple Reanalyzed + (20:40:34, 3 January 2025)
- ML19259C100 + (20:40:43, 3 January 2025)
- ML19259C099 + (20:40:47, 3 January 2025)
- 05000250/LER-1979-015, Forwards LER 79-015/03L-0 + (20:41:29, 3 January 2025)
- ML19259C096 + (20:41:33, 3 January 2025)
- ML19259C095 + (20:41:34, 3 January 2025)
- ML19259C093 + (20:41:35, 3 January 2025)
- 05000250/LER-1979-014-03, /03L-0 on 790424:ready to Start Light on B Emergency Diesel Generator Engine Control Panel Failed. Caused by Vibration of Lamp Socket.Tests Under Way to Determine If Neon Unit Would Be Better Suited + (20:41:46, 3 January 2025)
- ML19259C090 + (20:41:49, 3 January 2025)
- ML19259C088 + (20:41:51, 3 January 2025)
- ML19259C087 + (20:41:53, 3 January 2025)
- ML19259C086 + (20:41:55, 3 January 2025)
- 05000250/LER-1979-014, Forwards LER 79-014/03L-0 + (20:41:57, 3 January 2025)
- ML19259C083 + (20:41:59, 3 January 2025)
- ML19259C082 + (20:42:01, 3 January 2025)
- ML19259C080 + (20:42:02, 3 January 2025)
- ML19259C079 + (20:42:03, 3 January 2025)
- ML19259C078 + (20:42:04, 3 January 2025)
- ML19259C077 + (20:42:13, 3 January 2025)
- ML19259C075 + (20:42:14, 3 January 2025)
- 05000309/LER-1979-012-01, /01T-0 on 790524:reactor Protection Sys Low Pressure Trip Bistables in Error Set at 415 Psig.Caused by Incorrectly Transposing Data Transmitter Calibr Sheets to Procedure.Calibr Sheets & Procedures Being Revised + (20:42:19, 3 January 2025)
- 05000309/LER-1979-012, Forwards LER 79-012/01T-0 + (20:42:24, 3 January 2025)
- ML19259C071 + (20:42:28, 3 January 2025)
- ML19259C069 + (20:42:30, 3 January 2025)
- 05000237/LER-1979-029-03, /03L-0 on 790508:DIS 1400-3,pressure Switch 2-1430-1466D Failed to Trip.Caused by Sticky Plunger in Pressure Switch.Switch Removed,Cleaned & Reset to Trip at 94.5 Psig Increasing + (20:42:54, 3 January 2025)
- 05000293/LER-1979-018-01, /01T-1: on 790519,recirculation Pump Started W/Delta Temp Between Loops Greater than 50 F & Reactor Coolant Temp Greater than 212 F.Caused by Failure to Follow Station Operating Procedures & Temp Monitors + (20:43:08, 3 January 2025)
- 05000293/LER-1979-018, Forwards LER 79-018/01T-1 + (20:43:12, 3 January 2025)
- ML19259C064 + (20:43:16, 3 January 2025)
- TXX-2996, Forwards Affidavit of Svc for Amend 6 to FSAR + (20:43:17, 3 January 2025)
- ML19259C062 + (20:43:24, 3 January 2025)
- ML19259C061 + (20:43:26, 3 January 2025)
- ML19259C060 + (20:43:29, 3 January 2025)
- ML19259C059 + (20:43:30, 3 January 2025)
- ML19259C057 + (20:43:31, 3 January 2025)
- ML19259C056 + (20:43:33, 3 January 2025)
- ML19259C055 + (20:43:34, 3 January 2025)
- ML19259C054 + (20:43:42, 3 January 2025)
- ML19259C053 + (20:43:44, 3 January 2025)
- ML19259C052 + (20:43:45, 3 January 2025)
- ML19259C051 + (20:43:48, 3 January 2025)
- ML19259C050 + (20:43:49, 3 January 2025)
- ML19259C049 + (20:43:51, 3 January 2025)
- ML19259C048 + (20:43:52, 3 January 2025)
- ML19259C047 + (20:43:56, 3 January 2025)
- ML19259C046 + (20:43:58, 3 January 2025)
- ML19259C045 + (20:44:00, 3 January 2025)
- ML19259C044 + (20:44:01, 3 January 2025)
- ML19259C042 + (20:44:03, 3 January 2025)
- IR 05000309/1979002 + (20:44:05, 3 January 2025)
- ML19259C040 + (20:44:09, 3 January 2025)
- ML19259C039 + (20:44:11, 3 January 2025)