Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000325/LER-1979-043, Forwards LER 79-043/03L-0 + (11:30:58, 3 January 2025)
- 05000334/LER-1979-013-03, /03L-0 on 790522:during Surveillance of Control Room Habitability Sys,Pressure Regulators for Control Room Pressurization Were Found Cycling.Caused by Improper Calibr. Controls Tuned & Procedure Revised + (11:31:00, 3 January 2025)
- ML19269E596 + (11:31:01, 3 January 2025)
- 05000334/LER-1979-009-03, /03L-0 on 790320:during Surveillance Test,Diesel Generator 1 Output Breaker Failed to Close Upon Actuation of Control Switch.Cause of Inoperable Breaker Unknown.Operators Reinstructed in Test Circuit & Surveillance Increased + (11:31:04, 3 January 2025)
- ML19269E592 + (11:31:05, 3 January 2025)
- ML19269E584 + (11:31:06, 3 January 2025)
- ML19269E583 + (11:31:06, 3 January 2025)
- ML19269E581 + (11:31:07, 3 January 2025)
- ML19269E579 + (11:31:08, 3 January 2025)
- 05000321/LER-1979-037-01, /01T-0 on 790612:GE Review of Class IE Drywell Equipment Per IE Bulletin 79-01 Found Incomplete Documentation of Limit Switches on MSIV B21-F022 A,B,C & D. Caused by Changed Requirements.New Switch Ordered + (11:31:09, 3 January 2025)
- ML19269E572 + (11:31:11, 3 January 2025)
- 05000321/LER-1979-037, Forwards LER 79-037/01T-0 + (11:31:12, 3 January 2025)
- ML19269E566 + (11:31:13, 3 January 2025)
- ML19269E564 + (11:31:14, 3 January 2025)
- 05000336/LER-1977-056-03, /03X-2 on 771118:during Routine Operation,Aerated Waste Evaporator Concentrates Tank Was Pressurized W/Air & Ruptured.Caused by Application of 100 Psi Air to Tank W/Blockage in Tee in Unvalved Vent Line.No Repair Planned + (11:31:18, 3 January 2025)
- ML19269E562 + (11:31:19, 3 January 2025)
- ML19269E560 + (11:31:20, 3 January 2025)
- TAC:11856 + (11:31:21, 3 January 2025)
- ML19269E559 + (11:31:21, 3 January 2025)
- ML19269E557 + (11:31:22, 3 January 2025)
- ML19269E558 + (11:31:22, 3 January 2025)
- 05000336/LER-1977-056, Forwards LER 77-056/03X-2 + (11:31:24, 3 January 2025)
- ML19269E554 + (11:31:25, 3 January 2025)
- 05000336/LER-1979-013-03, /03L-0 on 790525:during Check of Control Room Chlorine Detection Sys,Both Detectors Declared Inoperable Due to Low Drip Rates in Sensor.Caused by Clogged Dispensers.Dispensers Cleaned,Restoring Operability + (11:31:26, 3 January 2025)
- IR 05000454/2019012 + (11:31:28, 3 January 2025)
- ML19269E550 + (11:31:29, 3 January 2025)
- ML19269E547 + (11:31:30, 3 January 2025)
- ML19269E548 + (11:31:30, 3 January 2025)
- ML19269E546 + (11:31:31, 3 January 2025)
- ML19269E545 + (11:31:31, 3 January 2025)
- 05000336/LER-1979-013, Forwards LER-79-013/03L-0 + (11:31:33, 3 January 2025)
- ML19269E541 + (11:31:34, 3 January 2025)
- ML19269E538 + (11:31:35, 3 January 2025)
- ML19269E537 + (11:31:35, 3 January 2025)
- ML19269E536 + (11:31:36, 3 January 2025)
- 05000338/LER-1979-081-03, /03L-0 on 790608:individual Rod Position Indicators M-10 & D-10 Placed in Test Status,Contrary to Tech Specs.Caused by Repair Work to Remove Previously Installed Jumper.Calibr Performed + (11:31:37, 3 January 2025)
- ML19269E531 + (11:31:39, 3 January 2025)
- ML19269E530 + (11:31:40, 3 January 2025)
- ML19269E529 + (11:31:42, 3 January 2025)
- ML19269E527 + (11:31:43, 3 January 2025)
- ML19269E528 + (11:31:43, 3 January 2025)
- ML19269E526 + (11:31:44, 3 January 2025)
- ML19269E523 + (11:31:45, 3 January 2025)
- 05000338/LER-1979-080-03, /03L-0 on 790608:during Power Escalation,Axial Flux Difference Deviated More than +5% from Target for 16 Minutes,Contrary to Tech Specs.Caused by Withdrawal of Control Rods + (11:31:47, 3 January 2025)
- ML19269E521 + (11:31:48, 3 January 2025)
- ML19269E519 + (11:31:49, 3 January 2025)
- 05000338/LER-1979-075-03, /03L-0 on 790604:during Steady State Operation, Axial Flux Difference Deviated Over 5% from Target for Two Minutes,Contrary to Tech Specs.Caused by Xenon Oscillation Initated by Rod Operability Test.Power Reduced by 2% + (11:31:50, 3 January 2025)
- ML19269E517 + (11:31:54, 3 January 2025)
- ML19269E515 + (11:31:56, 3 January 2025)
- ML19269E508 + (11:31:57, 3 January 2025)
- ML19269E513 + (11:31:57, 3 January 2025)