- pm 83%q#o UNITED STATES NUCLEAR REGULATORY COMMISSION
[
[\\
REGION IV n
3'I 611 RYAN PLAZA DRIVE, SUITE 1000 ARLINGTON, TEXAS 76011
/
80 MAR 1979 Docket No. S9900334/79-01 De Laval Turbine Incorporated Engine and Compressor Division Subsidiary of Transamerica Corporation Attn: Mr. D.11. Martini Vice President and General Manager 550 85th Avenue Oakland, California 94621 Gentlemen:
This refers to the QA Program inspection conducted by Mr. W. E. Foster of this office on March 5-9, 1979, of your facility at Oakland, California associated with the manufacture of diesel generators and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.
This inspection was made to confirm that, in the areas inspected, your QA Program is being effectively iinplemented. The inspection effort is not designed to assure tl1at unique quality rec,uirements imposed by a customer are being implamented; r.or to assure that a specific product, component or service provided by you to your customers, is of acceptable quality. As you know, the NRC requires each of its licensees to assume full responsibility for the quality of specific products, components or services procured from others. You should therefore not conclude that the NRC's inspection exempts you from inspections by an NRC licensee or his agents nor from taking effective corrective action in response to their findings.
~
Areas examined and our findings are discussed in the enclosed report.
Within these areas, the inspection censisted of an examination of procedures and representc tive records, interviews with personnel, and observations by the inspector.
Dur'ng the inspection it was found that the implementation of your. QA Program failed to meet certain NRC requirements. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.
Please provide us within thirty (30) days of your receipt of this report a written statement containing, (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the date your corrective actions and preventive measures were or will be completed.
2146 101 7906290 N [
De Laval Turbine Incorporated In accordance with Section 2.790 of the Commission's " Rules of Practice,"
Part 2 Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply, together with the enclosed inspection report will be placed in the Comission's Public Document Room.
If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claived that the infomation is proprietary, and should be prepared so that proprietary infomation identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, sPtaoys,Ch}
Venhai Inspection Branch
Enclosures:
1.
tiotice of Deviation 2.
Inspection Repo:-t flo. 99900334/79-01 a
2146 102