Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000326/1997201 + (13:57:54, 3 December 2024)
- ML20217E944 + (13:57:55, 3 December 2024)
- ML20217E943 + (13:57:55, 3 December 2024)
- ML20217E939 + (13:57:56, 3 December 2024)
- ML20217E937 + (13:57:57, 3 December 2024)
- ML20217E935 + (13:57:58, 3 December 2024)
- ML20217E934 + (13:57:59, 3 December 2024)
- L-98-075, Submits Supplemental Response to Violations Noted in Insp Repts 50-334/97-08 & 50-412/97-08.Corrective actions:self- Assessments,External & Internal,Conducted That Evaluated Calibration Method & Practices Currently Employed + (13:58:00, 3 December 2024)
- ML20217E933 + (13:58:00, 3 December 2024)
- ML20217E930 + (13:58:01, 3 December 2024)
- ML20217E928 + (13:58:02, 3 December 2024)
- ML20217E926 + (13:58:03, 3 December 2024)
- ML20217E927 + (13:58:03, 3 December 2024)
- ML20217E923 + (13:58:04, 3 December 2024)
- ML20217E925 + (13:58:04, 3 December 2024)
- ML20217E922 + (13:58:05, 3 December 2024)
- ML20217E921 + (13:58:05, 3 December 2024)
- ML20217E920 + (13:58:06, 3 December 2024)
- 05000498/LER-1999-008, :on 990912,unit Tripped During Performance of Main Turbine Emergency Trip Test Procedures.Caused by Failure in Turbine Trip Test Circuitry.Main Control Boards Were Cleaned & Other Panels Were Inspected + (13:58:08, 3 December 2024)
- ML20217E918 + (13:58:08, 3 December 2024)
- ML20217E916 + (13:58:10, 3 December 2024)
- ML20217E914 + (13:58:11, 3 December 2024)
- ML20217E915 + (13:58:11, 3 December 2024)
- ML20217E911 + (13:58:14, 3 December 2024)
- ML20217E909 + (13:58:16, 3 December 2024)
- ML20217E907 + (13:58:16, 3 December 2024)
- ML20217E906 + (13:58:17, 3 December 2024)
- ML20217E905 + (13:58:17, 3 December 2024)
- ML20217E903 + (13:58:18, 3 December 2024)
- ML20217E902 + (13:58:19, 3 December 2024)
- ML20217E901 + (13:58:19, 3 December 2024)
- 2CAN099706, Forwards Results of Pilot Plant Application Study Performed at Ano,Unit 2 for Review.Prompt Staff Review Is Requested. Formal Request for NRC Approval Will Be Made Following Submittal of Svc Water Sys Risk Evaluation in Dec 1997 + (13:58:20, 3 December 2024)
- ML20217E900 + (13:58:20, 3 December 2024)
- ML20217E895 + (13:58:21, 3 December 2024)
- ML20217E898 + (13:58:21, 3 December 2024)
- ML20217E893 + (13:58:22, 3 December 2024)
- ML20217E891 + (13:58:23, 3 December 2024)
- ML20217E888 + (13:58:23, 3 December 2024)
- ML20217E887 + (13:58:24, 3 December 2024)
- ML20217E886 + (13:58:25, 3 December 2024)
- ML20217E881 + (13:58:26, 3 December 2024)
- ML20217E880 + (13:58:27, 3 December 2024)
- ML20217E879 + (13:58:27, 3 December 2024)
- ML20217E876 + (13:58:28, 3 December 2024)
- ML20217E878 + (13:58:28, 3 December 2024)
- 05000277/LER-1998-001-02, :on 960118,failure to Perform SR for First Recirculation Pump Start Was Noted.Caused by Inadequate Review of ITS Requirements.Revised Procedure to Include Appropriate SRs + (13:58:31, 3 December 2024)
- 05000334/LER-1999-011, :on 990909,inadequate Axial Flux Difference Monitor Alarm Surveillance Was Noted.Caused by Lack of Info in Operations Surveillance Test Procedures 1OST-5A.1 & 2OST-5A.1.Revised Procedures.With + (13:58:33, 3 December 2024)
- ML20217E872 + (13:58:34, 3 December 2024)
- ML20217E871 + (13:58:35, 3 December 2024)
- ML20217E866 + (13:58:44, 3 December 2024)
- 3F0398-11, Provides Table of Corrections/Revs to Thermo-Lag Exemptions Issued by NRC + (13:58:46, 3 December 2024)
- ML20217E865 + (13:58:46, 3 December 2024)