- 05000348/LER-1982-023-03, /03L-0:on 820528,determined That FNP-2-STP-19.3 Not Performed within Time Interval Specified by Tech Spec 4.0.5.Caused by Personnel error.FNP-2-STP-19.3 Satisfactorily Performed + (03:49:08, 27 May 2025)
- NUREG/CR-0098, Forwards SEP Position Re Consideration of Inelastic Response Using NUREG/CR-0098 Ductility Factor Approach,Providing Addl Guidance Regarding Application of Ductility Methodology + (03:49:14, 27 May 2025)
- 05000364/LER-1982-028-01, /01T-0:on 820609,markings for Trains a & B Svc Water Cooling Valves Found Reversed.Caused by Personnel Error in Installing Permanent Labels.Labeling Error Corrected + (03:49:24, 27 May 2025)
- 05000339/LER-1982-029-03, /03L-0:on 820526,while in Mode 5,power-operated Relief Valve Returned to Svc W/O Testing for Operability Following Maint.When Tested,Valve Failed Operability Test. Caused by Inadequate Administrative Control + (03:49:25, 27 May 2025)
- 05000369/LER-1982-038-03, /03L-0:on 820524,QA Surveillance of Maint History of 4 Uhi Level Switches Indicated Instrument Setpoints Not within Tech Spec Requirements.Caused by Setpoint Drift. Vendor re-examining Uhi Analysis.Setpoints Adjusted + (03:49:27, 27 May 2025)
- 05000369/LER-1982-035-03, /03L-0:on 820517,in Mode 1,containment Ventilation Unit Condensate Drain Tank Composite Sampler Declared Inoperable Due to Loss of Continuous Sampling Capacity. Caused by Improper Adjustment of Pressure Regulator Valve + (03:50:20, 27 May 2025)
- 05000369/LER-1982-036-03, /03L-0:on 820521,during Diesel Generator Load Sequencer 1B Test,One Timer Failed to Pick Up Load within Allowable Tolerance.Caused by Instrument Drift.Timer Recalibr & Test Completed Satisfactorily + (03:50:24, 27 May 2025)
- 05000296/LER-1982-021-03, /03L-0:on 820525,core Standby Cooling Sys Pressure Switch PS-68-95,switches 1 & 2 & Pressure Switch PS-3-74B, Switch 2 Operated Above Allowable Level.Caused by Instrument Drift.Switches Recalibr + (03:50:28, 27 May 2025)
- ML20054J902 + (03:50:47, 27 May 2025)
- 05000366/LER-1982-058-03, /03L-0:on 820531,during Full Power Operation,Hpci Sys Determined to Be Inoperable.Caused by Component Failure Due to Fouled Contacts on HPCI Turbine Exhaust Pressure Switch 2E41-N0178B.Switch Repaired & Recalibr + (03:50:52, 27 May 2025)
- 05000259/LER-1982-035-03, /03L-0:on 820525,4-h Functional Test/Calibr Time Limit Exceeded W/O Monitor in Downscale Tripped Condition. Caused by Personnel Error.Personnel Reminded of Time Limit & Procedure Revised + (03:51:02, 27 May 2025)
- 05000366/LER-1982-022-03, During Refueling/Torus Mod Outage,Various Containment Isolation Valves Exhibited Excessive Leakage.Valves Repaired + (03:51:05, 27 May 2025)
- 05000366/LER-1982-022, Forwards Updated LER 82-022/03X-1 + (03:51:08, 27 May 2025)
- 05000321/LER-1982-029-03, /03L-0:on 820601,during Cold Shutdown,Plant Svc Water Pump D Failed to Meet Operability Test Flow Requirements.Caused by Normal Wear & Damaged First Stage Impeller.Pump Rebuilt & Tested Satisfactorily + (03:51:11, 27 May 2025)
- 05000348/LER-1982-026, Forwards LER 82-026/03L-0 + (03:51:12, 27 May 2025)
- 05000325/LER-1981-092, Updated LER 81-092/01T-2:on 811226,action Statement 3.3.2b Not Entered When B21-LT-N017D-1 Instrument Failed Upscale. Caused by Failure of Operations Personnel to Recognize & Perform Required Action + (03:51:22, 27 May 2025)
- 05000302/LER-1982-039-03, /03L-0:on 820523,once-through Steam Generator B Discovered Performing Erratically.Caused by Failure of Level Transmitter Amplifier Lam 2.Amplifier Replaced & Channel Calibr.Operability Restored on 820525 + (03:51:27, 27 May 2025)
- NUREG-0878, Forwards Fes (NUREG-0878).W/o Encl + (03:51:29, 27 May 2025)
- 05000373/LER-1982-026, Forwards LER 82-026/03L-0.Detailed Event Analysis Encl + (03:52:01, 27 May 2025)
- 05000373/LER-1982-023-03, /03L-0:on 820524,piston Seal on Damper Actuator Failed to Operate in Control Room Emergency HVAC Sys.Caused by Personnel Failure to Adequately Review Degraded Equipment Log.Other HVAC Train Repaired & Parts Ordered for Dampe + (03:52:07, 27 May 2025)
- 05000315/LER-1982-043-03, /03L-0:on 820523 & 24,1-WMO-702,W Essential Svc Water Discharge Valve,Failed to Operate During Surveillance Test.Caused by Buildup of Corrosion Products.Model PR20 150B (Drawing 5-6073) Replaced W/Pratt Valve + (03:52:10, 27 May 2025)
- 05000373/LER-1982-027-03, /03L-0:on 820526,blowdown Valve House Radiation Monitor Failed.Probably Caused by Either Loss of Power or High Voltage Surge to Radwaste Effluent Monitor.High Voltage Button in Radwaste Effluent Monitor Reset.Procedure Revis + (03:52:14, 27 May 2025)
- IR 05000423/1982004 + (03:52:25, 27 May 2025)
- IR 05000295/1982003 + (03:52:27, 27 May 2025)
- 05000373/LER-1982-038-01, /01T-0:on 820609,reactor Vessel Water Low Level Channel Placed in Trip Position After Over 24-h W/Inoperable Switch.Caused by Misinterpretation of Tech Specs.Tech Specs Will Be Reviewed by Operating Personnel + (03:52:28, 27 May 2025)
- 05000336/LER-1982-017-03, /03L-0:on 820526,at 100% power,1800 Computer Processing Unit Declared Inoperable Because of Inability to Write Into Display Storage Address Register.Caused by Failure of Circuit Card.Card Replaced + (03:52:30, 27 May 2025)
- ML20054J685 + (03:52:42, 27 May 2025)
- 05000373/LER-1982-028-03, /03L-0:on 820526 & 0601,audits Revealed Temporary Procedure Changes 45-82 & 40-82 Not Signed by Station Superintendent.Caused by Improper Filing & Processing. Procedure Revised + (03:52:44, 27 May 2025)
- IR 05000334/1982008 + (03:52:45, 27 May 2025)
- 05000311/LER-1982-042-03, /03L-0:on 820518,number 21 Operational Temp Channel Trip Actuated Higher than Tech Specs.Caused by Failure of Contacts on lead/lag-derivative Switch to Complete Trip Circuit.Contacts Cleaned + (03:53:04, 27 May 2025)
- 05000346/LER-1982-024-03, /03L-0:on 820522,discharge Valve Mu 348 from Boric Acid Pump 1-1 Found in Closed Position.Caused by Personnel Error.Operators Counseled & Maint for Check Valves Reviewed + (03:53:07, 27 May 2025)
- 05000373/LER-1982-030-03, /03L-0:on 820531,particulate & Iodine Not Sampled for 7-h When RCT Failed to Return Station Stack Wide Range Monitor Sample Valve Lineup to Normal Position After Grab Sampling for Noble Gas.Rct Retrained + (03:53:08, 27 May 2025)
- 05000373/LER-1982-046-01, /01T-0:on 820609,both Emergency Makeup Trains Disabled.A Train Inoperable Due to Improper Installation of Detector Paper Causing High Ammonia Signal.B Train Inoperable Due to Bent Linkage.Sys Mod Effected + (03:53:40, 27 May 2025)
- IR 05000244/1980016 + (03:53:49, 27 May 2025)
- 05000285/LER-1982-003, Forwards LER 82-003/03L-1 + (03:53:56, 27 May 2025)
- 05000336/LER-1982-016-01, /01T-0:on 820607,12-inch Ductile Cast Iron Cement Lined Underground Fire Main Broke on Const Site,Causing Both Fire Protection Storage Tanks to Fall Below Min Requirement. Cause Not Determined.Break Isolated & Tanks Refilled + (03:54:01, 27 May 2025)
- 05000316/LER-1982-048-03, /03L-0:on 820524,safety Stop Pin in Track of Pressurizer Heater Transformer Room Overhead Door Discovered.Caused by Personnel Error.Pin Removed.Ltr Sent to All Personnel Re Proper Use of Pins + (03:54:22, 27 May 2025)
- B10421, Third Interim Deficiency Rept Re Min Charging Pump Flow Design,Initially Reported on 800614.Util Is Evaluating Proposal by Westinghouse to Upgrade Automatic Actuation of Power Operated Relief Valve.Final Rept by 820618 + (03:54:44, 27 May 2025)
- 05000278/LER-1982-008, Forwards LER 82-008/01T-0.Detailed Event Analysis Submitted + (03:54:52, 27 May 2025)
- ML20054J324 + (03:55:09, 27 May 2025)
- 05000219/LER-1982-028-03, /03L-0:on 820513,pump Breaker Permissive Switch Placed in Off Position in Response to Vibration Readings in Required Action Range,Rendering Core Spray Pump NZ01A Inoperable.Cause Not Determined.Sys Retested + (03:55:16, 27 May 2025)
- 05000219/LER-1982-027-03, /03L-0:on 820512,during Routine Visual Insp,Oil Puddle Discovered Below Liquid Poison Pump B.Caused by Plugged Stuffing Box 1-inch Drain.Pump Tagged Out,Oil Changed & Drain Cleared + (03:55:19, 27 May 2025)
- 05000317/LER-1982-026-03, /03L-0:on 820517,during Mode 6 Operation,Loss of Shutdown Cooling Flow Experienced When Operating Low Pressure Safety Injection Pump 11 Breaker Opened.Cause Undetermined.Motor Supply Breaker Alignment Check Performed + (03:55:29, 27 May 2025)
- 05000334/LER-1982-019-03, /03L-0:on 820521,pin Hole Leak Discovered in Expansion Joint on River Water Discharge of Recirculation Spray Heat Exchanger 1B.Cause Under Investigation.Expansion Joint Replaced + (03:55:32, 27 May 2025)
- 05000334/LER-1982-017, Forwards LER 82-017/01T-0 + (03:55:45, 27 May 2025)
- 05000318/LER-1982-025-01, /01T-0:on 820602,emergency Diesel Generators 21 & 12 Tripped on Loss of Field & Declared Inoperable. Caused by Voltage Drift.Emergency Diesel Generator Voltage Regulator Assembly Replaced + (03:55:48, 27 May 2025)
- IR 05000254/1982007 + (03:57:16, 27 May 2025)
- TAC:45672 + (03:57:24, 27 May 2025)
- TAC:48436 + (03:57:36, 27 May 2025)
- ML20054H786 + (03:58:04, 27 May 2025)
- 05000338/LER-1982-038-03, /03L-0:on 820517 & 20,fire Door 571-17 Between 1J Emergency Diesel Generator Room & Turbine Bldg Declared Inoperable.Caused by Sticking Latch & Loose Adjustment Set Screw in Closure Mechanism.Latch Lubricated + (03:58:07, 27 May 2025)