Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LD-94-044, Forwards Revised Combustion Engineering Standard Safety Analysis Rept - Design Certification,Amend W & Affidavit + (13:00:23, 26 May 2025)
- 05000259/LER-1982-030-03, During Normal Operation, GE Error Noted in Transient Analysis for Cycle 5.Caused by Procedural Error.Min Critical Power Ratio Increased by 0.02 (1.6%).Data Constants Will Be Changed + (13:00:24, 26 May 2025)
- 05000259/LER-1982-030, Forwards Updated LER 82-030/03X-1 + (13:00:26, 26 May 2025)
- 05000259/LER-1980-049-03, Increase in Pressure Detected on Shell Side of RHR 1-C Hx.Caused by Loose Locking & Full Nuts on Floating Head Due to Thermal Cycling & Vibration.Locking Tabs Installed on Nuts + (13:00:30, 26 May 2025)
- 05000259/LER-1980-049, Forwards Updated LER 80-049/03X-1 + (13:00:32, 26 May 2025)
- ML20073S500 + (13:00:43, 26 May 2025)
- ML20073S494 + (13:00:45, 26 May 2025)
- TXX-9413, Forwards Proposed Rev 19 to CPSES Emergency Plan,Rev 8 to Emergency Plan Procedure (EPP) EPP-201, Assessment of Eals, Emergency Classification & Plan Activation, & Proposed Rev 9 to EPP-201 + (13:01:14, 26 May 2025)
- B14855, Requests Consistent W/Intent of NRC GL 90-05,relief from ASME Boiler & Pressure Vessel Code Section XI Requirements, 10CFR50.55a(g)(6)(i) to Repair Pinhole Leak in Svc Water Sys Piping Line 3SWP-030-344-3 + (13:01:20, 26 May 2025)
- RC-94-0032, Forwards Rev 33 of EPP-100, Radiation Emergency Plan + (13:01:49, 26 May 2025)
- TAC:51791 + (13:02:21, 26 May 2025)
- TAC:51343 + (13:02:32, 26 May 2025)
- ML20073R329 + (13:02:57, 26 May 2025)
- A830010, Requests 30-day Extension for Responding to IE Emergency Preparedness Appraisal Rept 50-298/82-34 on 821206-10. Emergency Plan & Emergency Plan Implementing Procedures Revised Per NUREG-0737 (Generic Ltr 82-33) + (13:04:17, 26 May 2025)
- B10737, Submits Results of Leakage Measurements Completed on 830407, Per Amend 83 to License DPR-65 Re Deferred Inservice Insp Requirements.Steam Generator Leakage Rates Acceptable + (13:04:51, 26 May 2025)
- TXX-9113, Final Deficiency Rept Re Configurations Where Rigid Overhanging Conduit Changes Direction & Terminates in Airdrop W/No Support Provided on Bent Segment.Issue Being Addressed During Design & Installation Process + (13:05:15, 26 May 2025)
- TXX-9114, Comments on SALP Rept for Facility,For Period of Sept 1989- Jan 1991.Util Performance Reflects Strong Mgt Support,Good Programs & Well Qualified Staff + (13:06:09, 26 May 2025)
- TAC:73713 + (13:06:28, 26 May 2025)
- ML20073N415 + (13:06:36, 26 May 2025)
- ML20073N108 + (13:06:48, 26 May 2025)
- TAC:51653 + (13:06:50, 26 May 2025)
- ML20073M957 + (13:07:03, 26 May 2025)
- 05000321/LER-1981-026-01, Emergency Diesel Circuit Breakers Failed to Auto Close Following loss-of-offsite Power Test Sequence.Caused by Undervoltage Relays Failure to Deactuate + (13:07:27, 26 May 2025)
- 05000321/LER-1981-026, Forwards Updated LER 81-026/01X-1 + (13:07:29, 26 May 2025)
- 05000272/LER-1981-121, Supplemental LER 81-121/03X-1:on 811228,svc Water Leak in Spool Piece Discovered Between Valves 12SW57 & 58.Design Change Package 1EC-0504 Implemented to Replace Piece W/Stainless Steel for Improved Corrosion Resistance + (13:07:32, 26 May 2025)
- 05000461/LER-1990-004-02, Forwards LER 90-004-02 Re Potential Inability of Safety Related air-operated Valves & 10CFR21 Defect Rept 21-90-05 Re Overpressurization Failure of safety-related Air Operated Valves.W/O 10CFR21 Rept + (13:07:54, 26 May 2025)
- NRC-2019-0003, NRC-2019-000301 - Resp 1 - Interim, Request for All Records and Communications Related to the Nuclear Regulatory Commissions (NRC) Determination to Allow Southern California Edison to Resume Fuel Loading at the San Onofre Nuclear Gener + (13:08:18, 26 May 2025)
- ML20073K921 + (13:09:33, 26 May 2025)
- A830011, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 5.7.7 Re Activation of Technical Support Ctr & EPIP 5.7.9 Re Activation of Emergency Operations Facility + (13:09:46, 26 May 2025)
- ML20073K716 + (13:10:03, 26 May 2025)
- 05000321/LER-1983-036, Forwards LER 83-036/01T-0 + (13:10:55, 26 May 2025)
- 05000327/LER-1983-042-03, /03L-0:on 830314,while in Mode 1,ice Condenser Inlet Doors Blew Open During Damper Alignment for in-core Instrument Room Purge.Caused by High Differential Pressure Between Upper & Lower Containment.Missile Shield Resealed + (13:11:17, 26 May 2025)
- 05000395/LER-1983-026-03, /03L-0:on 830318,reactor Bldg Cooling Unit Svc Water Flow Indicators Failed Low & Accident Monitoring Instrumentation Channel 4496 Declared Inoperable.Caused by Internal Failure of Indicator FI-4496.Indicator Replaced + (13:11:29, 26 May 2025)
- 05000370/LER-1983-002-03, /03L-0:on 830307,while Moving Temporary in-core Detector,Rope Holding Cable Fell Into Reactor Vessel & Drawn Into Hot Leg C.Caused by Personnel Error.Rope Found Wrapped Around RHR Pump & Removed on 830315 + (13:11:32, 26 May 2025)
- ML20073J869 + (13:11:35, 26 May 2025)
- 05000341/LER-1994-006, :on 940903,discovered That SRMs & IRMs Inoperable During Core Alterations.Caused by Cable Connectors Becoming Separated Due to Stress.Procedure 82.000.04 Will Be Modified + (13:11:40, 26 May 2025)
- 05000364/LER-1983-014-03, /03L-0:on 830309,RCS Controlled Leakage of 31.7 Gpm Exceeded Tech Spec Limit of 31.0 Gpm.Caused by Performing Test W/Only One Letdown Orifice in Svc.Procedure Changed to Set Valves for Highest Normal Pressure + (13:11:47, 26 May 2025)
- 05000325/LER-1983-012-03, /03L-0:on 830312,during Refueling Operations, 00 & full-in Position Indication for Control Rod 30-15 Inoperable.Caused by Bent Pins in PIP Connector to Rods. Connectors Replaced + (13:11:52, 26 May 2025)
- 05000368/LER-1983-016-03, /03L-0:on 830311,containment Spray Pump 2P-35A Tripped Due to Tripped C Phase Instantaneous Overcurrent Relay.Caused by Deviation from Setpoint.Relay Reset.Periodic Checks Will Monitor Further Setpoint Drift + (13:12:02, 26 May 2025)
- 05000267/LER-1983-012-03, /03L-0:on 830308-15,reactor Dewpoint Exceeded Limits Three Times.Caused by Plant Upsets Resulting in Increased Moisture Levels & Subsequent Vaporization Exceeding Helium Purification Sys Removal Rate + (13:12:08, 26 May 2025)
- 05000321/LER-1983-028-03, /03L-0:on 830305,torus Level Increased to 150.5 Inches on Redundant Torus Level Recorder 1T48-R607B. Caused by High Level Alarm Setpoint Set Above Tech Spec Limit.Torus Water Level Restored to Acceptable Limits + (13:12:10, 26 May 2025)
- 05000327/LER-1983-040-03, /03L-0:on 830319,containment Internal Pressure Exceeded Tech Spec Limits.Caused by Normal Air Leakage Into Containment W/O Venting.Personnel Reminded to Request Vent Packages on More Timely Basis + (13:12:14, 26 May 2025)
- 05000368/LER-1983-017-03, /03L-0:on 830312,sodium Hydroxide Addition Pump 2P-136A Failed to Start Upon Containment Spray Actuation Sys Actuation.Caused by Improper Limit Switch Setup.Maint Procedures Revised + (13:12:16, 26 May 2025)
- 05000335/LER-1983-015-03, /03L-0:on 830312,reactor Protection Sys Matrix Relay AB-3 Failed.Util Coordinating Corrective Action for Relays w/C-E & CP Clair Co + (13:12:19, 26 May 2025)
- 05000267/LER-1983-015-03, /03L-0:on 830311,emergency Feedwater Supply to Loop 1 Helium Circulator Pelton Wheel Drives Isolated.Caused by Excessive Wear Requiring Maint.Pipe Section Replaced & Flanges Installed + (13:12:21, 26 May 2025)
- 05000321/LER-1983-029-03, /03L-0:on 830307,error in Jet Pump Integrity Procedures HNP-1 & 2-9400 Discovered W/Acceptance Criteria Less Conservative than Tech Spec.Caused by Improperly Incorporating IE Bulletin 80-07 & GE SIL 330 + (13:12:24, 26 May 2025)
- 05000267/LER-1983-014-03, /03L-0:on 830309,emergency Set 1B Emergency Diesel 1D Tripped Due to Dc Electrical Sys Intermittent Ground. Caused by Loose Conduit Termination Lock Nut.Nut Tightened & Secured + (13:12:25, 26 May 2025)
- ML20073J553 + (13:12:27, 26 May 2025)
- 05000338/LER-1983-018-03, /03L-0:on 830318,individual Rod Position Indication for Rod N-09 in Shutdown Bank a Deviated from Group Demand Position by Greater than 12 Steps.Caused by Instrument Drift.Problem Generic to Westinghouse Sys + (13:12:30, 26 May 2025)
- 05000281/LER-1983-012-03, /03L-0:on 830309,performance of PT-27B Revealed Ampere Reading Less than Acceptance Criteria for Heat Tracing Circuits 6A,panel 11 & 21A & Panels 8 & 9.Caused by Heat in Damaged Circuits 6A & 21A + (13:12:33, 26 May 2025)
- 05000325/LER-1983-013-03, /03L-0:on 830313,average Power Range Monitors (APRM) B & F Rendered Inoperable While Replacing Low Power Range Monitor (LPRM) Inputs While APRM B Manually Bypassed. Caused by LPRM 20-29D,83-174A & 28-37C Failure + (13:12:34, 26 May 2025)