Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20140B601 + (02:31:13, 25 May 2025)
- ML20140B576 + (02:31:22, 25 May 2025)
- ML20140B572 + (02:31:25, 25 May 2025)
- ML20140B546 + (02:31:32, 25 May 2025)
- 05000295/LER-1997-013-02, :on 970412,VT-3 Insp Requirements of Relief Request CR-13 for Reactor Head Bolting Were Not Performed. Caused by Failure to Revise ISI Database After SER Received from Nrc.Procedure Revised + (02:32:13, 25 May 2025)
- 05000382/LER-1997-012, :on 970404,programmatic Breakdown of Overtime Program Occurred.Caused by Lack of Mgt Oversight in Administering & Implementing Plants Working Hour Policy. Ltr Issued Reemphasizing Working Hour Policy + (02:32:40, 25 May 2025)
- ML20140B312 + (02:32:53, 25 May 2025)
- 05000295/LER-1997-014-02, :on 970502,TS Surveillances on Radiation Monitors Were Missed Because Technical Interpretation That Kept 1(2)RT-PR15 Operable Was Inoperable.Revised Station Procedures + (02:33:06, 25 May 2025)
- ML20140B224 + (02:33:18, 25 May 2025)
- 05000278/LER-1985-029-01, :on 851213,RWCU Sys Isolated & Pump Tripped While Sys in Operation.Caused by Blown Fuse in RWCU Sys Logic.Fuse Replaced + (02:33:31, 25 May 2025)
- 05000362/LER-1986-002, :on 860212,w/core Protection Calculator Channels a & D Inoperable,Period of Greater than 2 H Elapsed Before Appropriate Channels Bypassed/Tripped.Caused by Miscommunication.Work Request Process Changed + (02:33:38, 25 May 2025)
- 05000270/LER-1985-008-04, :on 851214,unit Placed in Hot Shutdown Due to Unidentified RCS Leakage Greater than 1 Gpm,Per Tech Spec 3.1.6.Caused by Instrument Root Valve Packing Gland Failure. Valve Replaced + (02:33:40, 25 May 2025)
- 05000255/LER-1985-029, :on 851204,results of Surveillance Test for Local Leak Rate Testing Indicated That Leak Rate Outside Tech Spec Limits.Cause Unknown.Repair of Primary Coolant Sample Valves Performed + (02:33:43, 25 May 2025)
- 05000254/LER-1997-003-05, :on 970429,visual Exam (VT-2) Was Not Performed Due to Procedural Deficiencies Following HPCI Sys Valve Replacement Required by Asme,Section XI & TS Section 4.0.E. Examined VT-2 of 1-2301-45 Valve + (02:33:53, 25 May 2025)
- 05000416/LER-1986-005, :on 860215,heater for Filter Train B Found to Dissipate Approx 44.9 Kw,Violating Tech Spec Min Requirement of 45 Kw.Caused by Failure to Submit Tech Spec Change When Design Change Implemented.Tech Specs Revised + (02:34:01, 25 May 2025)
- 05000338/LER-1986-002-03, :on 860223,reactor/turbine Trip Occurred from 100% Power.Caused by Turbine Control Sys Malfunction.Exact Cause Undetermined.Sys Tested Satisfactory & Unit Restarted + (02:34:09, 25 May 2025)
- 05000244/LER-1986-002, :on 860216,two Motor Operated Valves Required to Be Operable for Refueling Discovered Inoperable Due to 480-volt Bus 14 Outage.Caused by Lack of Tech Spec Clarity. Procedures Reviewed & Modified + (02:34:13, 25 May 2025)
- 05000296/LER-1985-017, :on 850716,RHR Sys Declared Inoperable Following Discovery of Broken Hanger & Damaged Snubber on Torus Return Line.Caused by Low Cycle Fatigue Due to RHR Sys Piping Vibration.Injection Valve Modified + (02:34:19, 25 May 2025)
- ML20140B094 + (02:34:20, 25 May 2025)
- ML20140B070 + (02:35:22, 25 May 2025)
- 05000250/LER-1985-043, :on 851217,emergency Diesel Generator a Declared out-of-svc W/Generator B out-of-svc for Replacement of Control Cabinet Selector Switch.Caused by Erroneously Recorded High Temp Reading on Pyrometer + (02:35:24, 25 May 2025)
- 05000260/LER-1985-020-02, :on 851220,mgt Notified That Eight Local Reactor Protection Sys Panels Not Constructed Per Design Drawings.Caused by Failure to Properly Document Actual Constructed Configuration During Const + (02:35:30, 25 May 2025)
- DD-81-15, Notice of Issuance of Directors Decision DD-81-15,denying Petition to Institute Enforcement Action Against Fl Power & Light Co for Failure to Abide by Antitrust Condition of Facility License + (02:36:17, 25 May 2025)
- ML20140A904 + (02:36:34, 25 May 2025)
- ML20140A871 + (02:36:42, 25 May 2025)
- ML20140A849 + (02:36:48, 25 May 2025)
- ML20140A804 + (02:36:59, 25 May 2025)
- ML20140A580 + (02:38:12, 25 May 2025)
- NUREG-0830, Advises That Condition 2.c.(3)(a) of License NPF-30 Fulfilled,Based on & 860117 Rept Re Environ Qualification Program for Electrical Equipment.Program Previously Accepted Per NUREG-0830,Section 3.11 + (02:38:21, 25 May 2025)
- ML20140A495 + (02:38:56, 25 May 2025)
- IR 05000335/1996004 + (02:41:45, 25 May 2025)
- 05000346/LER-1981-035-03, /03X-1:on 810624,analysis of Containment Purge Exhaust Valves Determined That Valves Not Operable Per Design of Sar.Caused by Design Deficiency by H Pratt.Valves Disabled to Prevent Use in Models 1-4 + (02:42:07, 25 May 2025)
- TAC:M89398 + (02:43:44, 25 May 2025)
- ML20139A265 + (02:44:00, 25 May 2025)
- OIG-17-A-19, Status of Recommendations: Evaluation of NRCs Network Storage Interruption Dated May 21, 2020 + (02:44:12, 25 May 2025)
- ML20139A145 + (02:44:18, 25 May 2025)
- TAC:52980 + (02:45:12, 25 May 2025)
- ML20138S008 + (02:45:31, 25 May 2025)
- ML20138R802 + (02:46:53, 25 May 2025)
- ML20138R601 + (02:49:46, 25 May 2025)
- ML20138R585 + (02:49:56, 25 May 2025)
- ML20138R561 + (02:50:12, 25 May 2025)
- ML20138R403 + (02:52:08, 25 May 2025)
- IR 05000272/1985029 + (02:52:10, 25 May 2025)
- ML20138R363 + (02:52:28, 25 May 2025)
- 05000317/LER-1982-085-03, /03X-1:on 821230,ESFAS AL Sequencer Inoperable During Surveillance Testing & Handswitch for CTMT Spray Pump 11 Placed in pull-to-lock.Caused of Failure Unknown.Module Replaced.Failed Module Returned to Vendor + (02:57:42, 25 May 2025)
- ML20138Q733 + (02:58:28, 25 May 2025)
- 05000336/LER-1995-020-01, :on 950516,automatic Actuation of Engineered Safety Feature Occurred During Maint.Caused by Procedure Deficiency.Revised Operations Procedure OP-2384 to Add Appropriate Caution for de-energization of Cabinets + (02:58:58, 25 May 2025)
- ML20138Q564 + (02:59:26, 25 May 2025)
- ML20138Q421 + (03:00:33, 25 May 2025)
- ML20138Q409 + (03:00:38, 25 May 2025)