Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19338G218 + (18:07:25, 25 December 2024)
- ML19338G219 + (18:07:25, 25 December 2024)
- ML19338G217 + (18:07:26, 25 December 2024)
- ML19338G216 + (18:07:27, 25 December 2024)
- ML19338G215 + (18:07:28, 25 December 2024)
- ML19338G214 + (18:07:29, 25 December 2024)
- ML19338G210 + (18:07:30, 25 December 2024)
- ML19338G212 + (18:07:30, 25 December 2024)
- ML19338G209 + (18:07:31, 25 December 2024)
- ML19338G208 + (18:07:32, 25 December 2024)
- ML19338G206 + (18:07:33, 25 December 2024)
- ML19338G205 + (18:07:34, 25 December 2024)
- ML19338G204 + (18:07:35, 25 December 2024)
- ML19338G203 + (18:07:36, 25 December 2024)
- 05000313/LER-1980-036-03, /03L-0:on 800929,nuclear Instrumentation Calibr Was Not Performed within 24-h of 10% Power Change.Caused by Personnel Error.Personnel Reacquainted W/Proper Procedure + (18:07:37, 25 December 2024)
- ML19338G200 + (18:07:39, 25 December 2024)
- ML19338G201 + (18:07:39, 25 December 2024)
- 05000267/LER-1980-053-03, /03L-0:on 800926,during Maint Shutdown Period, Seminannual Test of Standby Diesel Generators Revealed Inoperability of 1B Programmer.Caused by Faulty Wire Position Which Impeded Relay Contact.Wire Repositioned + (18:07:41, 25 December 2024)
- 05000313/LER-1980-036, Forwards LER 80-036/03L-0 + (18:07:42, 25 December 2024)
- ML19338G196 + (18:07:44, 25 December 2024)
- 05000293/LER-1980-076-03, /03L-0:on 800923,flow Integrator Fq 7032 for Drywell Floor Sump Pump Was Not Operating.Cause Undetermined + (18:07:45, 25 December 2024)
- 05000324/LER-1980-067-03, /03L-0:on 800923,following Reactor Scram,Reactor Core Isolation Cooling Injection Valve 2E51-F013 Would Not Fully Open.Caused by Missing Electrical Jumper.Jumper Installed + (18:07:47, 25 December 2024)
- 05000293/LER-1980-076, Forwards LER 80-076/03L-0 + (18:07:49, 25 December 2024)
- ML19338G191 + (18:07:50, 25 December 2024)
- 05000313/LER-1980-037-03, /03L-0:on 800929,during Monthly Surveillance of Lead Hydrogen Purge Sys,Supply Fan VSF-30A Flow Slowly Degraded & Exhaust Fan VEF-37A Tripped.Caused by Sticking Check Valves & Restricted Filters.Valves Cleaned + (18:07:51, 25 December 2024)
- 05000324/LER-1980-067, Forwards LER 80-067/03L-0 + (18:07:54, 25 December 2024)
- 05000259/LER-1980-077-01, /01T-0:on 801010,anchor Bolts Associated W/ Seismic Restraints on RHRSW Piping Had Been Degraded by Earth Settling in RHRSW Tunnels.Caused by Design Error. Pipe Restraints Modified + (18:07:56, 25 December 2024)
- 05000259/LER-1980-077, Forwards LER 80-077/01T-0 + (18:07:58, 25 December 2024)
- ML19338G183 + (18:08:00, 25 December 2024)
- ML19338G182 + (18:08:01, 25 December 2024)
- 05000339/LER-1980-064-03, /03L-0:on 800924,indicated Axial Flux Difference Exceeded 5% Target Band.Caused by High Bearing Temp Tripping Condensate Pump.Boron Added to RCS & Control Rods Withdrawn Until Axial Flux Difference Was Back Inside Target Ban + (18:08:02, 25 December 2024)
- ML19338G180 + (18:08:04, 25 December 2024)
- 05000313/LER-1980-027-03, Average Gross Gas Release Rate for 3rd Quarter Was Exceeded.Caused by Presence of 0.19% Failed Fuel & Two Shutdowns.Attempts Will Be Made to Repair or Replace Failed Fuel + (18:08:06, 25 December 2024)
- 05000267/LER-1980-054-03, /03L-0:on 800926,during Maint Shutdown Period, Scheduled Surveillance Showed Eight Hydraulic Snubbers to Be Inoperable.Caused by One Empty Reservoir,Two Interference Problems & Five Snubbers W/Improper Stroke + (18:08:07, 25 December 2024)
- 05000339/LER-1980-064, Forwards LER 80-064/03L-0 + (18:08:09, 25 December 2024)
- 05000313/LER-1980-027, Forwards Updated LER 80-027/03X-1 + (18:08:10, 25 December 2024)
- ML19338G173 + (18:08:13, 25 December 2024)
- 05000325/LER-1980-080-03, /03L-0:on 800923,low Level Switch 1-B21-LIS-N031A-2 Failed to Actuate.Caused by Sticking Switch Actuator.Switch Actuator Was Cleaned + (18:08:14, 25 December 2024)
- 05000325/LER-1980-080, Forwards LER 80-080/03L-0 + (18:08:18, 25 December 2024)
- 05000313/LER-1980-035-99, /99X-0:on 800916,during Investigation of Svc Water Condition,Flow Check & Cooling Coil Indicated Southwest Side of Coolers VCC2C & D Were Partially Restricted.Caused by Buildup of Asian Clams.Engineering Evaluation Is Contin + (18:08:20, 25 December 2024)
- 05000302/LER-1980-040, Forwards LER 80-040/04L-1 + (18:08:23, 25 December 2024)
- ML19338G163 + (18:08:28, 25 December 2024)
- 05000213/LER-1980-015-03, /03L-0:on 801020,while Boiling Down Aerated Drains Tank Waste Evaporator in Preparation for Drumming,Level Indication Was Lost.Caused by Failed Gasket on Discharge Piping of Reboiler Pump.Gasket Replaced + (18:08:30, 25 December 2024)
- 05000267/LER-1980-053, Forwards LER 80-053/03L-0 + (18:08:32, 25 December 2024)
- 05000213/LER-1980-014-03, /03L-0:on 800926,during Surveillance Testing of Diesel Fire Pump,Pump Discharge Pressure at 2500 RPM Found Below Tech Spec Limit.Caused by Low Operating RPM of Diesel Motor.Adjustments Made to Increase Motor RPM + (18:08:34, 25 December 2024)
- 05000313/LER-1980-037, Forwards LER 80-037/03L-0 + (18:08:35, 25 December 2024)
- 05000334/LER-1980-075-01, /01T-0:on 801008,determined That Overstress Condition Exists on Reactor Coolant Fill Header from High Head Charging Pumps.Cause Unknown.Necessary Mods Made Prior to Start Up + (18:08:38, 25 December 2024)
- 05000267/LER-1980-054, Forwards LER 80-054/03L-0 + (18:08:42, 25 December 2024)
- 05000259/LER-1980-074-03, /03L-0:on 800924,during Normal Operation,Seismic Monitor SMA2 Found Inoperable.Caused by Failed Printed Wiring Board 100935.Assembly Repaired,Tested & Returned to Svc.Failure Considered Random.No Further Action Planned + (18:08:43, 25 December 2024)
- ML19338G149 + (18:08:47, 25 December 2024)
- 05000293/LER-1980-073-03, /03L-0:on 800917,mgt Review of Records Revealed That Monthly Surveillance Test SP74-41,visual Insp of Energy Piping Outside Containment,Was Not Performed within Required Interval.Caused by Scheduling Error + (18:08:48, 25 December 2024)