ML19338G218
| ML19338G218 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System, Satsop |
| Issue date: | 09/05/1980 |
| From: | Renberger D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| GO1-80-247, GO3-80-2124, IEB-80-19, NUDOCS 8010280618 | |
| Download: ML19338G218 (1) | |
Text
I i
7 Tl U p
Washington Public Power Supply System S
. A JOINT OPERATING AGENCY P. O. Box 968 3000 Geo. Wasme=stoM W AY RICMLAND. W ASMENOfoN 9 9 3 5 2 PHONE (SO9) 375 5000 September 5,1980 G01-80-247 Docket Nos.
50 460/513 G03-80-2124 50-508/509
- 4. p "
p
- /
U. S. Nuclear Regulatory Commission
/..
-3 Region V
.D'
~ L
~.~
1990 florth California Boulevard e
Suite 202, Walnut Creek Plaza
- (-.f.3 "j f J
Z Walnut Creek, California 94596 o
\\fd Attention:
Mr. R. H. Engelken, Director Gentlemen:
Subject:
WNP-1/4 AND WNP-3/5 RESPONSE ~TO IE BULLETIN 80-19 In response to the subject bulletin, please be advised that C. P. Clare Model HG2X-10ll mercury wetted relays (or any other mercury wetted relays) are not used in the logic matrix of the Reactor Protection System at our Nuclear Project flos. 1 and 4 or 3 and 5.
A total of 5 man-days were expended in the conduct of the review and reporting of this Bulletin.
Very truly yours, cM Y
D. L. RENBERGER Assistant Director, Technology DLR:GCS:nm cc: Director, Division of Reactor Operations Inspection U. Woods, NUS N. S. Reynolds, D&L l
i
._7.._.
,, _ :,, m~...
. 8 010280[p l%
.,,,%e m--%
e a e.
..._-_-----,g_
,w..
~~~
~~
~
~~