Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19340C211 + (23:26:06, 24 December 2024)
- ML19340C209 + (23:26:06, 24 December 2024)
- ML19340C208 + (23:26:07, 24 December 2024)
- ML19340C206 + (23:26:08, 24 December 2024)
- ML19340C203 + (23:26:09, 24 December 2024)
- ML19340C202 + (23:26:09, 24 December 2024)
- ML19340C201 + (23:26:11, 24 December 2024)
- ML19340C200 + (23:26:12, 24 December 2024)
- ML19340C199 + (23:26:13, 24 December 2024)
- ML19340C198 + (23:26:14, 24 December 2024)
- ML19340C197 + (23:26:15, 24 December 2024)
- ML19340C196 + (23:26:16, 24 December 2024)
- ML19340C195 + (23:26:17, 24 December 2024)
- ML19340C194 + (23:26:18, 24 December 2024)
- ML19340C193 + (23:26:19, 24 December 2024)
- ML19340C192 + (23:26:20, 24 December 2024)
- ML19340C188 + (23:26:21, 24 December 2024)
- ML19340C191 + (23:26:21, 24 December 2024)
- ML19340C187 + (23:26:23, 24 December 2024)
- ML19340C186 + (23:26:24, 24 December 2024)
- ML19340C184 + (23:26:24, 24 December 2024)
- AECM-80-277, Second Interim Deficiency Rept Re Linear Indications on Guyon Alloys,Inc Couplings Used in Class I & II Applications,Originally Reported on 800811.Plant Can Still Operate Safely + (23:26:25, 24 December 2024)
- ML19340C182 + (23:26:27, 24 December 2024)
- ML19340C181 + (23:26:27, 24 December 2024)
- ML19340C179 + (23:26:29, 24 December 2024)
- ML19340C178 + (23:26:31, 24 December 2024)
- ML19340C177 + (23:26:32, 24 December 2024)
- ML19340C174 + (23:26:33, 24 December 2024)
- ML19340C175 + (23:26:33, 24 December 2024)
- ML19340C173 + (23:26:35, 24 December 2024)
- ML19340C172 + (23:26:35, 24 December 2024)
- ML19340C170 + (23:26:36, 24 December 2024)
- ML19340C171 + (23:26:36, 24 December 2024)
- ML19340C169 + (23:26:37, 24 December 2024)
- ML19340C168 + (23:26:38, 24 December 2024)
- AECM-80-276, Interim Deficiency Rept Re Incorrectly Crimped Ite Imperial Control Circuitry Terminations in Engineered Safety Feature 4.16 Kv Bus,Reported 800703.Investigation Not Complete. Preliminary Indications Show Operation Is Still Safe + (23:26:39, 24 December 2024)
- ML19340C166 + (23:26:41, 24 December 2024)
- ML19340C165 + (23:26:42, 24 December 2024)
- AECM-80-278, Final Deficiency Rept Re Use of Uncertified Torque Wrench Multipliers Noted in IE Insp Rept 50-416/80-19 & First Reported on 801007.Torque Wrench Multipliers Were Certified & All Affected Equipment Retorqued.Rept Is Not Part 21 + (23:26:43, 24 December 2024)
- ML19340C163 + (23:26:43, 24 December 2024)
- ML19340C161 + (23:26:45, 24 December 2024)
- ML19340C159 + (23:26:46, 24 December 2024)
- ML19340C158 + (23:26:46, 24 December 2024)
- ML19340C157 + (23:26:47, 24 December 2024)
- ML19340C156 + (23:26:47, 24 December 2024)
- ML19340C155 + (23:26:48, 24 December 2024)
- 05000029/LER-1980-018-03, /03L-0:on 801012,both Scram Contact Setpoints of Steam Generator 1 Found Below Tech Specs Limit.Caused by Design Deficiency in Sensing Line Which Did Not Allow Adequate Venting.Setpoint Adjusted + (23:26:50, 24 December 2024)
- 05000302/LER-1980-045-01, /01T-0:on 801028,purge Isolation Valves AHV-1A & 1B Were Inoperable.Caused by Radiation Monitor RM-A1 Not Representatively Sampling Reactor Bldg Atmosphere Due to Maint Actions Involving Detector Removal/Replacement + (23:26:53, 24 December 2024)
- ML19340C152 + (23:26:54, 24 December 2024)
- ML19340C151 + (23:26:55, 24 December 2024)
- 05000029/LER-1980-018, Forwards LER 80-018/03L-0 + (23:26:56, 24 December 2024)