Submits Info Clarifying QA Requirements for Diesel Generator Fuel Oil Requested in NRC .Tests to Be Performed Onsite Prior to Adding New Fuel Include Specific or API Gravity,Water & Sediment & Viscosity.Oil Added to Q-list
ML19340C194
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/07/1980
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Clark R
Office of Nuclear Reactor Regulation
References
NUDOCS 8011140127
Download: ML19340C194 (1)


Text

-.

Q__

2 s Omaha Public Power District 1623 HARNEY

, OMAHA, NESRASKA 68102 8 TELEPHONE 536 4000 AREA CODE 402 November 7, 1980 D

Director of Nuclear Reactor Regulation ATTN:

Mr. Robert A. Clark, Chief Operating Reactors Branch No. 3 U. S. Nuclear Regulatory Commission Washington, D. C.

20555 i

Reference:

Docket No. 50-285 Gentlemen:

Omaha public Power District received the Commission's letter dated September 17, 1980, requesting clarification of the District's letter dated May 2,1980, regarding quality assurance requirements for diesel generator fuel oil. The Commission requested that the District include the program for diesel fuel oil quality control in our Quality Assurance Program and add it to the Q-List. The Commission also requested a dis-cussion of how we assure fuel quality before adding it to the storage tanks. The discussion on our program is detailed below.

The District will incorporate the requirements of U.S.N.R.C. Regulatory Guide 1.137, concerning tests performed prior to adding new fuel to the supply tanks, into our Administrative Procedures. This will be accom-plished once the testing equipment is received on site. The expected delivery date for the new equipment is December 31, 1980, at the earliest.

The tests to be performed on site prior to adding new fuel include:

a.

Spacific or API Gravity b.

Water and Sediment c.

Viscosity Samples of the fuel oil will also be sent to the District's laboratory facility for an analysis of the other properties of the fuel oil listed in the applicable specifications.

The Quality Assurance Program will be revised to include the diesel generator fuel oil. Additionally, the diesel fuel oil has been added to the District's Q-List. These measures should adequately assure the quality of the Fort Calhoun Station diesel fuel oil.

Sincerely,

/

(- (

(

W. C. Jones Divis,i.on Manager

\\