Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000327/LER-1980-205-03, /03L-0:on 801229 & 810105,two Ice Condenser Intermediate Deck Doors Below AHU-3A Found Frozen Closed. Caused by Overflow from Drip Pan Freezing Around Doors.Ice Removed + (22:06:05, 24 December 2024)
- ML19341B537 + (22:06:06, 24 December 2024)
- 05000327/LER-1980-205, Forwards LER 80-205/03L-0 + (22:06:07, 24 December 2024)
- ML19341B534 + (22:06:08, 24 December 2024)
- 05000327/LER-1980-207-03, /03L-0:on 801228,remote Shutdown Monitoring Indicators I-LI-68-325C & 326C Showed Erroneous Indication. Caused by Leaking Valve in Common Transmitter Drain Line. Valve Tightened Down + (22:06:09, 24 December 2024)
- ML19341B531 + (22:06:10, 24 December 2024)
- B10155, Forwards Revised Page 3 for .Original Statement Does Not Apply to Unit 1 + (22:06:16, 24 December 2024)
- ML19341B529 + (22:06:18, 24 December 2024)
- 05000327/LER-1980-207, Forwards LER 80-207/03L-0 + (22:06:19, 24 December 2024)
- ML19341B525 + (22:06:20, 24 December 2024)
- ML19341B524 + (22:06:21, 24 December 2024)
- ML19341B522 + (22:06:21, 24 December 2024)
- ML19341B520 + (22:06:23, 24 December 2024)
- ML19341B519 + (22:06:23, 24 December 2024)
- ML19341B518 + (22:06:24, 24 December 2024)
- 05000333/LER-1980-096-03, /03L-0:on 801229 & 810109,reactor Level Switch 02-3-LIS-101B Was Found Set 2.3 Inches Below +12.5 Inch Requirement & LIS-101B Was Found Set 0.5 Inches Above +58 Inch Requirement,Respectively.Caused by Normal Wear + (22:06:26, 24 December 2024)
- 05000333/LER-1980-096, Forwards LER 80-096/03L-0 + (22:06:28, 24 December 2024)
- ML19341B512 + (22:06:34, 24 December 2024)
- ML19341B510 + (22:06:40, 24 December 2024)
- 05000295/LER-1980-056-03, /03L-0:on 801226,gas Decay Tank Cubicle Rad Monitor ORT-PR02B Failed.Caused by Bad Electrical Contacts on Printed Circuit Board.Contacts Repaired + (22:06:47, 24 December 2024)
- 05000295/LER-1980-056, Forwards LER 80-056/03L-0 + (22:06:54, 24 December 2024)
- 05000324/LER-1980-121, Forwards LER 80-121/03L-0 + (22:06:59, 24 December 2024)
- ML19341B503 + (22:07:00, 24 December 2024)
- 05000327/LER-1980-202-03, /03L-0:on 801225,steamline Pressure & Flow Channel S/G-3 Train a Failed High & S/G-1,2 & 4 Train B Failed Low. Caused by Freezing of Unprotected Sense Lines.Lines Thawed. Design Changes Initiated + (22:07:01, 24 December 2024)
- 05000327/LER-1980-202, Forwards LER 80-202/03L-0 + (22:07:03, 24 December 2024)
- ML19341B499 + (22:07:09, 24 December 2024)
- ML19341B498 + (22:07:10, 24 December 2024)
- ML19341B495 + (22:07:11, 24 December 2024)
- ML19341B496 + (22:07:11, 24 December 2024)
- ML19341B494 + (22:07:17, 24 December 2024)
- ML19341B492 + (22:07:18, 24 December 2024)
- ML19341B493 + (22:07:18, 24 December 2024)
- ML19341B490 + (22:07:19, 24 December 2024)
- ML19341B489 + (22:07:25, 24 December 2024)
- ML19341B488 + (22:07:25, 24 December 2024)
- ML19341B487 + (22:07:26, 24 December 2024)
- ML19341B486 + (22:07:27, 24 December 2024)
- ML19341B484 + (22:07:33, 24 December 2024)
- ML19341B485 + (22:07:33, 24 December 2024)
- ML19341B483 + (22:07:39, 24 December 2024)
- ML19341B482 + (22:07:45, 24 December 2024)
- ML19341B481 + (22:07:46, 24 December 2024)
- ML19341B479 + (22:07:52, 24 December 2024)
- ML19341B480 + (22:07:52, 24 December 2024)
- ML19341B478 + (22:07:58, 24 December 2024)
- ML19341B477 + (22:07:59, 24 December 2024)
- 05000296/LER-1980-060-03, /03L-0:on 801231,seventeen Scram Accumulator Level Switches Found Inoperable.Caused by Dirty Floats. Switches Cleaned;One Replaced + (22:08:00, 24 December 2024)
- ML19341B475 + (22:08:02, 24 December 2024)
- ML19341B474 + (22:08:03, 24 December 2024)
- ML19341B473 + (22:08:09, 24 December 2024)
- ML19341B471 + (22:08:10, 24 December 2024)