Forwards BAW-1658, AR Nuclear One,Unit 1,Cycle 5 Reload Rept. Includes Revisions Necessary to Prevent Overpower Condition That Could Occur During Overcooling Transient Due to Nuclear Instrumentation Error.Class IV Fee Encl
ML19341B531
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/30/1981
From: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
To: Reid R
Office of Nuclear Reactor Regulation
Shared Package
ML19341B532 List:
References
NUDOCS 8102020472
Download: ML19341B531 (3)


Text

.

Ni e

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK, ARKANSAS 72203 (501)371-4422 N .

i January 30, 1981 2 y WILLIAM CAVANAUGH !!! 04 e ~S Senior Vice President .d _s j

Energy Supply 1-011-21 Director of Nuclear Reactor Regulation ATTN: Mr. Robert W. Reid, Chief Operating Recctors Branch #4 Division of Licensing U. S. Nuclear Regulatory Conniission Washington, D. C. 20555

Subject:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Cycle 5 Reload Report Submittal (File: 1510.5)

Gentlemen:

Enclosed are twenty (20) copies of the ANO-1 Cycle 5 Reload Report for your review. On November 6, 1980, AP&L submitted the " Extended Burnup Lead Test Assembly Irradiation Program" (BAW-1626) that is referenced in the Cycle 5 Reload Report. Included in the report are proposed Technical Specification changes.

The analysis done in support of the Cycle 5 Reload Report includes the revisions necessary to prevent an overpower condition that could occur during an overcooling transient because of nuclear instrumen-tation errors. This inclusion will meet the requirements of your January 14, 1981 letter to us requesting infonnation on this subject.

AP&L agrees with the B&W conclusion that only two events are affected in operating 177 FA plants - small overcooling events, including a small steam line break, and a rod ejection accident.

B&W notified AP&L on January 20, 1981, that recent work involving RPS and ESFAS equipment accuracies (or measured errors) has indicated dis-crepancies between revised calculations of these accuracies and those.

currently used for the FSAR accident analysis. The revised calcula-tions are based upon confirmatory tests performed in accordance with IEEE 323-1971 and updated error combina: ion methodology to support data in BAW-10003. The impact of these revised calculations is un-known at this time until the plant specific analysis can be completed.

AP&L will notify the NRC concerning any revisions necessary to the FSAR accident analysis as they become known to us. It is estimated that any changes will be minor (with an expected equipment accuracy change of less -than 2-3%). Therefore, the attached Cycle 5 Reload

810to20 %>.9 MEMBEF4 MiOOLE SOUTH UTIUTIES SYSTEM

o Mr. Robert W. Reid January 30, 1981 s

Report should be reviewed as it stands, and AP&L will submit any changes that are necessary from the above analysis when such analysis is complete.

It has been determined, by the criteria of 10 CFR 170, that this Tech-nical Specification change request is a Class IV complex issue change.

The appropriate fee of $12,300 is attached.

As mentioned in our October 31, 1980 submittal of the preliminary Cycle 5 Reload Report, the current outage is earlier than originally scheduled or analyzed for and has caused a delay in our final submittal. In accor-dance with our agreement on October 31, 1980, we have expedited issuance of the attached final Cycle 5 Reload Report and request your expeditious review. Per conversations with your Mr. Guy Vissing, a six (6) week turnaround should be possible. However, due to a schedule improvement in the current outage a March 10, 1981 date for initial criticality is planned. This will shorten the review time to five (5) weeks. We will work with you in resolving any concerns that may arise to help in your review.

Ve j truly your ,

A J _r2 William Cav augh III WC:LDY:sl N

STATE OF ARKANSAS )

) SS COUNTY OF PULASKI )

I, WILLIAM CAVANAUGH III, being duly sworn, subscribe to and say that I am the Senior Vice President of Energy Supply, for Arkansas Power & Light Company; that I have full authority to execute this oath; that I have read the foregoing letter no. 1-011-21 and know the contents thereof; and that to the best of my knowledge, information and belief the 4

statements made in it are true.

/

WILLI VANAUGH II SUBSCRIBED AND SWORN T0 before me, a Notary _Public in and for the County and State above named, this [ day o l/Lu[tu/ ,1981.

/ /'

lashu kut $t(Alub

. NOTARY _ 'PUBLIC MY COMMISSION EXPIRES:

idy Commissiori boires 9/1/81 4