Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19350C277 + (00:48:09, 24 December 2024)
- ML19350C278 + (00:48:09, 24 December 2024)
- IR 05000302/1980041 + (00:48:11, 24 December 2024)
- ML19350C275 + (00:48:12, 24 December 2024)
- ML19350C273 + (00:48:13, 24 December 2024)
- IR 05000338/1981001 + (00:48:14, 24 December 2024)
- ML19350C270 + (00:48:16, 24 December 2024)
- ML19350C269 + (00:48:16, 24 December 2024)
- 05000259/LER-1981-010-03, /03L-0:on 810302,continuous Air Monitor 1-RM-90-250 for Reactor/Turbine Bldg Ventilation Exhaust Declared Inoperable.Caused by Water in Sample Line Due to Condensation.Instrument Repaired,Tested & Returned to Svc + (00:48:18, 24 December 2024)
- NL-19-1180, Units 1 and 2, Request for Exemption from 10 CFR 50 .71 (e)(4) Final Safety Analysis Report Update Schedule + (00:48:19, 24 December 2024)
- 05000259/LER-1981-010, Forwards LER 81-010/03L-0 + (00:48:20, 24 December 2024)
- ML19350C264 + (00:48:22, 24 December 2024)
- 05000267/LER-1981-014-03, /03L-0:on 810104,instrument Air Compressors 1C & 1A Out of Svc,Leaving Only Compressor 1B in Svc.Caused by Compressor 1C Tripping on High Discharge Air Temp & Compressor 1A Being Cleared Out for Insp & Repairs + (00:48:23, 24 December 2024)
- 05000267/LER-1981-014, Forwards LER 81-014/03L-0.Detailed Summary Also Encl + (00:48:25, 24 December 2024)
- ML19350C260 + (00:48:27, 24 December 2024)
- ML19350C259 + (00:48:28, 24 December 2024)
- ML19350C254 + (00:48:29, 24 December 2024)
- ML19350C253 + (00:48:30, 24 December 2024)
- 05000324/LER-1981-042-03, /03L-0:on 810224,unit 2 Torus Oxygen Concentration Exceeded 4% & Later Unit 1 Drywell Oxygen Concentration Exceeded 4%.Caused by Inability of CAC Nitrogen Inerting Sys to Make Up Due to Ruptured Section of CAC Sys Piping + (00:48:32, 24 December 2024)
- ML19350C251 + (00:48:33, 24 December 2024)
- ML19350C250 + (00:48:34, 24 December 2024)
- 05000324/LER-1981-042, Forwards LER 81-042/03L-0 + (00:48:35, 24 December 2024)
- ML19350C247 + (00:48:37, 24 December 2024)
- 05000324/LER-1981-034-03, /03L-0:on 810225,discovered Reactor Core Isolation Cooling Sys Component Test Had Not Been Performed as Required.Caused by Failure of Operating Instructions to Provide for Rescheduling Tests Not Performed on Due Date + (00:48:38, 24 December 2024)
- ML19350C245 + (00:48:40, 24 December 2024)
- 05000324/LER-1981-034, Forwards LER 81-034/03L-0 + (00:48:41, 24 December 2024)
- ML19350C242 + (00:48:42, 24 December 2024)
- 05000331/LER-1981-010, Forwards LER 81-010/03L-0 + (00:48:43, 24 December 2024)
- ML19350C240 + (00:48:44, 24 December 2024)
- 05000333/LER-1981-023-03, /03L-0:on 810225,reactor Water Level Instrument 02-3-LIS-101C Found Set Below Allowable Limits & on 810302 Instrument Found Above Allowable Limits.Cause for Both Failures Believed to Be Broken Switch Lock.Lock Repaired + (00:48:46, 24 December 2024)
- ML19350C238 + (00:48:47, 24 December 2024)
- 05000333/LER-1981-023, Forwards LER 81-023/03L-0 + (00:48:48, 24 December 2024)
- AECM-81-118, Interim Deficiency Rept 9 Re Discrepancies in Design Documentation for Power Generation Control Complex Panels & Hardware,Originally Reported on 800223.Caused by as-shipped Panels Not Matching as-shipped Drawings + (00:48:49, 24 December 2024)
- 05000339/LER-1981-022-03, /03L-0:on 810310,31-day Surveillance Interval Re Updating Axial Power Distribution Monitoring Sys Was Exceeded by 25%.Caused by Personnel Not Upgrading Surveillance Log + (00:48:58, 24 December 2024)
- ML19350C230 + (00:49:00, 24 December 2024)
- 05000339/LER-1981-022, Forwards LER 81-022/03L-0 + (00:49:01, 24 December 2024)
- ML19350C224 + (00:49:05, 24 December 2024)
- ML19350C221 + (00:49:08, 24 December 2024)
- ML19350C220 + (00:49:09, 24 December 2024)
- 05000368/LER-1981-012-03, /03L-0:on 810303,loop Two Svc Water Header Engineered Safety Feature Isolation Valve 2CV-1406-2 Would Not Open from Control Room.Caused by Valve Operator Torquing Out Due to Valve Stem Binding + (00:49:10, 24 December 2024)
- 05000368/LER-1981-012, Forwards LER 81-012/03L-0 + (00:49:12, 24 December 2024)
- 05000346/LER-1981-015-03, /03L-0:on 810227,access Door 107 Found Propped Open from ECCS 2 Pump Room 115 to Miscellaneous Waste Monitor Tank & Pump Room 114.Caused by Failure to Follow Posted Signs While Clearing Odor from Room + (00:49:14, 24 December 2024)
- 05000346/LER-1981-015, Forwards LER 81-015/03L-0 + (00:49:16, 24 December 2024)
- 05000313/LER-1981-004-03, /03L-0:on 810227,diesel Fire Pump Battery Bank Surveillance Test Found Not Completed within Grace Period. Caused by Failure to Notify Supervisor That Procedure Could Not Be Completed During Shift + (00:49:18, 24 December 2024)
- 05000313/LER-1981-004, Forwards LER 81-004/03L-0 + (00:49:20, 24 December 2024)
- 05000339/LER-1981-027-03, /03L-0:on 810228,requirement to Determine Core Axial Power Distribution within Limits Every 8-h Was Missed When Monitoring Sys Failed W/O Operator Knowledge.Caused by Processor Overheating Due to Inadequate Ventilation + (00:49:21, 24 December 2024)
- 05000339/LER-1981-027, Forwards LER 81-027/03L-0 + (00:49:23, 24 December 2024)
- ML19350C204 + (00:49:24, 24 December 2024)
- 05000339/LER-1981-030-03, /03L-0:on 810316,casing Cooling Subsys B Was Removed from Svc During Mode 1,contrary to Tech Spec 3.6.2.2.Caused by Need to Prevent Pressurization of Sys While Performing Maint on Valve MOV-RS-201B + (00:49:25, 24 December 2024)
- 05000339/LER-1981-030, Forwards LER 81-030/03L-0 + (00:49:27, 24 December 2024)
- ML19350C200 + (00:49:28, 24 December 2024)