UNITED STATES
84' , y"f.,
NUCLEAR REGULATORY COMMISSION
3
/ ,, j
REGION 11
Y
'f
101 M ARIETT A ST., N.W.. SulT E 3100
ATLANTA. GEORGIA 30303
.
"J; , n)
FEB 2 51981
<
".
9-
4
j
2 As,4p' ?g Dg4* i ~
Virginia Electric and Power Company
/
,
p?
ATTN:
J. H. Ferguson
-
Executive Vice President-Power
%%
P. O. Box 26666
C
N
's
'Oh
Richmond, VA 23261
Gentlemen:
Subject: Report No.<f0-b8/ l-bh
~
This refers to the routine inspection conducted by N. Economos of this office on
January 19-22, 1981, of activities authorized by NRC Operating License No. DPR-32
for the North Anna facility and to the discussion of our findings held with W. R.
Cartwright at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
Two new unresolved items resulted from this inspection and are discussed in the
enclosed report. These items will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-
tion report will be placed in the NRC's Public Document Room. If this report
contains any information that you (or your contractor) believe to be proprietary,
it is necessary that you make a written application within 20 days to this office
to withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you within the specified period, the report
will be placed in the Public Document Room.
'
G
8103 31077g
I
.-
j
,J '
\\
Virginia Electric and Power Company
2
FEB 2 51981
Should you have any questions concerning this letter, we will be glad to discuss
<
them with you.
Sincerely,
.
C. E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspection Report No. 50-338/81-01
cc w/ encl:
W. R. Cartwright, Station Manager
P. G. Perry, Senior Resident Engineer
.