Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217P081 + (08:36:39, 23 May 2025)
- ML20217P075 + (08:36:41, 23 May 2025)
- ML20217P072 + (08:36:42, 23 May 2025)
- ML20217P069 + (08:36:44, 23 May 2025)
- ML20217P064 + (08:36:49, 23 May 2025)
- L-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld + (08:36:50, 23 May 2025)
- ML20217P032 + (08:37:02, 23 May 2025)
- 05000336/LER-1997-033-01, Forwards LER 97-033-01,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 970727.LER Submitted Per 10CFR50.73(a)(2)(ii) & 10CFR50.73(a)(2)(v) + (08:37:03, 23 May 2025)
- 05000327/LER-1999-002-03, :on 990916,EDG Started as Result of Cable Being Damaged During Installation of Thermo-Lag for Kaowool Upgrade Project.Caused by Inadequate pre-job Briefing. Involved Individuals Were Counseled on Event + (08:37:06, 23 May 2025)
- 05000454/LER-1997-023, :on 971229,1B DG Control Power Wiring Discrepancy Occurred Due to Mod Installation Error & Programmatic Deficiencies.Caused by Failure to Use self-check Principles.Counseled Technician + (08:37:07, 23 May 2025)
- SVP-98-160, Forwards 1997 Annual Radiological Environ Operating Rept for Quad Cities Station. Rept Contains Results of Radiological Environ Meteorological Monitoring Programs + (08:37:10, 23 May 2025)
- IR 05000315/1998005 + (08:37:13, 23 May 2025)
- ML20217P010 + (08:37:15, 23 May 2025)
- TAC:M96821 + (08:37:16, 23 May 2025)
- 05000373/LER-1998-001-06, :on 980131,missed TS Fire Watch Were Noted Due to Personnel Error.Terminated Responsible Contracted Fire Watch Inspectors + (08:37:28, 23 May 2025)
- ML20217N954 + (08:37:31, 23 May 2025)
- ML20217N948 + (08:37:33, 23 May 2025)
- 05000219/LER-1998-002-01, :on 980227,480 V Switchgear Room Fire Barrier Deficiency Was Noted.Caused by Inadequate Fire Barrier Spec. Two of Seven Fire Zones Where Conduit Fire Barriers Are Installed Were Reviewed,No Deficiencies Found + (08:37:35, 23 May 2025)
- 05000334/LER-1998-003, :on 980128,failure to Perform Chemical Addition Sys Valve Cycling Surveillance as Required by TSs Occurred. Caused by Inadequate Application of Tss.Test Procedures 1OST-13.11 Was Revised + (08:37:37, 23 May 2025)
- ML20217N930 + (08:37:41, 23 May 2025)
- 05000285/LER-1998-001, :on 980202,TS Violation Occurred Due to Inadequate Inservice Testing.Caused by Lack of Attention to Detail When FCS ISI Program Plan for 3rd ten-year Interval Was Put Together in 1992.Changes Will Be Made + (08:37:43, 23 May 2025)
- ML20217N926 + (08:37:45, 23 May 2025)
- 05000219/LER-1998-003-01, :on 980303,failure to Perform High Drywell Pressure Check Surveillance Was Noted.Caused by Inadequate Procedure.Reviewed & Revised Appropriate Plant Documents & Provided Operator Training + (08:37:47, 23 May 2025)
- ML20217N914 + (08:37:50, 23 May 2025)
- 05000362/LER-1984-045-01, :on 840719,recognized That Four Iodine Transients Met Reporting Criteria of TS 3.4.7,but Had Not Been Reported.Cause Indeterminate.Nrc Approved TS Amend Which Deleted Reporting Requirement of TS 3.4.7.A + (08:37:51, 23 May 2025)
- ML20217N911 + (08:37:53, 23 May 2025)
- ML20217N902 + (08:37:57, 23 May 2025)
- ML20217N893 + (08:38:00, 23 May 2025)
- 05000373/LER-1997-033-01, Forwards LER 97-033-01,updating Safety Analysis.Commitments Made by Util,Listed + (08:38:08, 23 May 2025)
- ML20217N864 + (08:38:12, 23 May 2025)
- ML20217N863 + (08:38:13, 23 May 2025)
- ML20217N851 + (08:38:17, 23 May 2025)
- IR 05000382/1998004 + (08:38:18, 23 May 2025)
- ML20217N824 + (08:38:25, 23 May 2025)
- ML20217N822 + (08:38:27, 23 May 2025)
- NUREG-1706, Responds to to Dk Rathbun,Requesting Info on Concerns Raised by Constituent E Mayer Re Y2K Readiness of Us NPPs.NUREG-1706, Y2K Readiness in Us NPPs Encl + (08:38:28, 23 May 2025)
- ML20217N808 + (08:38:33, 23 May 2025)
- IR 05000002/1998202 + (08:38:36, 23 May 2025)
- ML20217N800 + (08:38:36, 23 May 2025)
- 05000424/LER-1999-003-02, :on 990922,CR Door Painting Resulted in Loss of Positive Pressure Boundary.Caused by Inadequate pre-job Briefing.Doors Were Closed Upon Discovery by CR Personnel. with + (08:38:38, 23 May 2025)
- NPL-99-0564, Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability + (08:38:45, 23 May 2025)
- 05000298/LER-1998-002, :on 980302,determined That off-gas Fan & Filter Bldg Was Not Installed IAW Design Requirements.Caused by Bracing Overlooked Due to Lack of or Less than Adequate Const Insps.Required Bracing Installed + (08:38:46, 23 May 2025)
- ML20217N764 + (08:38:49, 23 May 2025)
- ML20217N761 + (08:38:50, 23 May 2025)
- ML20217N759 + (08:38:52, 23 May 2025)
- ML20217N753 + (08:38:54, 23 May 2025)
- ML20217N733 + (08:39:03, 23 May 2025)
- L-98-084, Discusses Util Current Plan for Addressing CRDM Housing Issue at Bvps.Specific Actions to Address Part Length CRDM Are Based Upon Results of Insps & Removal of Housings from Other Plants to Date + (08:39:07, 23 May 2025)
- ML20217N728 + (08:39:07, 23 May 2025)
- ML20217N724 + (08:39:10, 23 May 2025)
- ML20217N719 + (08:39:13, 23 May 2025)