Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML21111A179 + (05:21:47, 22 May 2025)
- PNP 2021-015, And Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report + (05:21:51, 22 May 2025)
- ML21103A230 + (05:25:39, 22 May 2025)
- ML21078A474 + (05:33:43, 22 May 2025)
- ML20366A167 + (06:23:17, 22 May 2025)
- ML20344A114 + (06:37:09, 22 May 2025)
- ML20342A384 + (06:37:54, 22 May 2025)
- RS-20-145, Submittal of Exelon Nuclear Radiological Emergency Plan Addendum Revision + (06:39:20, 22 May 2025)
- ML20316A006 + (06:52:16, 22 May 2025)
- RS-20-137, Company Emergency Plan Addendum Revisions + (06:52:31, 22 May 2025)
- ML20307A331 + (07:12:30, 22 May 2025)
- RS-20-138, Company Radiological Emergency Plan Document Revisions + (07:12:38, 22 May 2025)
- ML20297A467 + (07:32:12, 22 May 2025)
- ULNRC-06613, Resubmittal of 2019 Annual Radiological Environmental Operating Report + (07:32:17, 22 May 2025)
- SECY-18-0106, Response to SRM-SECY-18-0106 Letter to the Petitioner Acceptance of PRM-50-110 Applicability of Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors + (08:15:25, 22 May 2025)
- ML20266E265 + (08:53:11, 22 May 2025)
- ML20264C271 + (09:40:10, 22 May 2025)
- ML20263K581 + (10:37:06, 22 May 2025)
- ML20263K579 + (10:37:12, 22 May 2025)
- ML20263K557 + (10:37:38, 22 May 2025)
- ML20263K554 + (10:37:46, 22 May 2025)
- ML20263C368 + (11:27:12, 22 May 2025)
- ML20263C347 + (11:27:21, 22 May 2025)
- ML20263C297 + (11:27:37, 22 May 2025)
- ML20261C586 + (12:50:02, 22 May 2025)
- ML20260K694 + (13:04:05, 22 May 2025)
- ML20260K689 + (13:04:08, 22 May 2025)
- ML20260K680 + (13:04:11, 22 May 2025)
- ML20260K676 + (13:04:14, 22 May 2025)
- NUREG-1123, Rev. 3 Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Boiling Water Reactors + (13:13:52, 22 May 2025)
- ML20259B958 + (13:33:52, 22 May 2025)
- 05000285/LER-1998-003, Re Individual Leaving High Radiation Area (HRA) Door Unlocked & Uncontrolled While in Hra. LER 98-003-00 Retracted + (13:43:41, 22 May 2025)
- 05000336/LER-1998-012, Forwards LER 98-012-00,re Event Which Occurred at Millstone Unit 2 on 980521.Commitments Made within Ltr,Encl + (13:44:59, 22 May 2025)
- ML20249C311 + (13:45:10, 22 May 2025)
- TAC:M98738 + (13:47:51, 22 May 2025)
- 05000352/LER-1998-008, :on 980429,discovered Pressure Setpoint Drift of Five Main Steam Sys Srvs.Caused by Corrosion Induced Bonding.Replaced Fourteen SRV Pilot Valves W/Calibr Spares During 1R07 & Util Is Evaluating three-stage SRV Design + (13:48:11, 22 May 2025)
- ML20249B458 + (13:48:17, 22 May 2025)
- 05000412/LER-1998-008-01, :on 980515,discovered Inadequacies in GL 96-01 Specification Instrumentation Surveillance.Caused by Inadequate Application of Ts.Revised Procedures to Address Identified Concerns & Will Perform Testing + (13:51:15, 22 May 2025)
- NUREG-0782, Summary of 980318 Meeting W/Portland General Electric Re Util Plans for Disposal of Trojan Reactor Vessel.List of Attendees & Copy of Util Matls,Encl + (13:51:33, 22 May 2025)
- ML20249A601 + (13:52:27, 22 May 2025)
- ML20249A523 + (13:52:44, 22 May 2025)
- 05000364/LER-1998-001-01, :on 980328,manual Reactor Trip Was Noted.Caused by Dropped Control Rod K-2 & F-10.Affected Cable & Connectors Were Replaced During Unit 2 Twelfth Refueling Outage & Tested During Startup + (13:52:46, 22 May 2025)
- ML20249A446 + (13:52:58, 22 May 2025)
- ML20249A435 + (13:53:00, 22 May 2025)
- 05000461/LER-1998-016, :on 870630,failure to Test Valves 1SX013D/E/F IAW IST Program Was Noted.Caused by Personnel Error.Tested Safety Functions of Valves 1SX012D/E/F & Added Valves to IST + (13:53:04, 22 May 2025)
- ML20249A406 + (13:53:06, 22 May 2025)
- ML20249A404 + (13:53:07, 22 May 2025)
- 05000413/LER-1998-006-01, :on 980514,missed TS Surveillance on Pressurizer Heater EP Supply Testing.Caused by Incompatible W/Sys Design.License Amend Was Submitted to Revise SR 4.4.3.3 + (13:58:26, 22 May 2025)
- 05000413/LER-1998-005, Forwards LER 98-005-00,re Missed TS Surveillance on Abv. Commitments Made within Ltr,Encl + (13:58:46, 22 May 2025)
- 05000213/LER-1998-005, :on 980511,determined That Design Deficiency Was Found in Main Stack Flow Rate Monitor.Caused by 1974 Mod Change on Original Installation.Declared F-1101 Channel Out of Svc & Develop Means of Estimating Flow + (13:58:49, 22 May 2025)
- 05000352/LER-1998-011, :on 970901,1B RHR Pump Was Inoperable Due to Intermittent Min Flow Valve Closures.Caused by Failed Rosemount 510DU Trip Unit.Failed Trip Unit Was Replaced + (13:58:55, 22 May 2025)