ML20263C368
From kanterella
Jump to navigation
Jump to search
ML20263C368 | |
Person / Time | |
---|---|
Site: | Peach Bottom |
Issue date: | 06/12/1973 |
From: | BECHTEL GROUP, INC. |
To: | PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
Shared Package | |
ML20005B628 | List:
|
References | |
CON-6280, RTR-NUREG-0612, RTR-NUREG-612 A-70, NUDOCS 8107160204 | |
Download: ML20263C368 (1) | |
Similar Documents at Peach Bottom | |
---|---|
Category:ARRANGEMENT-GENERAL--DRAWINGS-APPLICANT'S FACILITY
MONTHYEARML20263C3131981-06-18018 June 1981
[Table view]Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (CRD Transfer Cart Removal Winch - 00H34 CRD Transfer Cart Path).Sheet 22.No Revision Date ML20263C3101981-06-18018 June 1981 Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (Reactor Building CRD Removal Platform Winch - Hoist (Wall Mounted) 20H20,30H20).Sheet 21.No Revision Date ML20263C3021981-06-18018 June 1981 General Arrangement:Plan at El 116 Ft, as-built. (Condensate Pump Hoist - 20H15 - 30H15 Condensate Pump Aux Hoist - 20H43 - 30H43 Load Path).Sheet 19.No Revision Date ML20263C3531981-06-18018 June 1981 Equipment Location:Reactor and Radwaste Building Plan at El 165 Ft, as-built.(Precoat Material Handling - 20H54 - 30H54 Vertical Load Path).Sheet 37.No Revision Date ML20263C3001981-06-18018 June 1981 Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (Reactor Building Recirc Pump Motor Hoists Load Path).Sheet 18.No Revision Date ML20263C2941981-06-18018 June 1981 Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (Reactor Building Recir Pump Motor-Gen Hoist 20H06 - 30H06 Load Path).Sheet 16 ML20263C3441981-06-18018 June 1981 Plot Plan. (Restricted Areas for 15 Ton Yard Crane 00H56 - Ground Floor).Sheet 34.No Revision Date ML20263C2971981-06-18018 June 1981 Cw Pump Structure Plan Elev 112 Ft & 116 Ft, as-built. (Pump Structure Crane-00H16 - Load Path Pump Base - Pump Bldg Floor - El 112 Ft Pull Up Hatch & Load Path - Pump Bldg Roof - El 130 Ft 6 Inches Ground Floor - El 116 Ft).Sheet 17 ML20263C3421977-02-0606 February 1977 Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (FP Filter Demin Hoist - 00H55 Filter Load Path). Sheet 33 ML20263C3151977-02-0606 February 1977 Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (CRD Removal Hoist - 20H05 - 30H05 Load Path). Sheet 23 ML20263C3171977-02-0606 February 1977 Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (Equipment Access Lock Removal Hoist - 20H04 - 30H04 Load Path).Sheet 24 ML20263C3201977-02-0606 February 1977 Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (Personnel Lock Hoist - 20H22 - 30H22 Personnel Lock Load Path).Sheet 25 ML20263C3561975-12-15015 December 1975 Emergency Cooling Tower Switchgear Area, as-built. (Emergency CT Emergency Cooling Tower Hoist - 00H49 Emerg CT Jib Crane - 00H49).Sheet 38 ML20263C3051975-12-15015 December 1975 Shop & Warehouse 5 Ton Crane Runway, as-built.(Machine Shop Crane - 00H12 Load Path).Sheet 20 ML20263C3501975-11-22022 November 1975 Stack Requirements, as-built.(Off Gas Stack Hoist Jib Crane - 00H46 Load Path).Sheet 36 ML20263C3401975-10-29029 October 1975 Equipment Location:Recombiner Building Plans and Section, as-built.(Recombiner Building Hoist - 00H42 Load Path). Sheet 32 ML20263C3591975-10-23023 October 1975 General Arrangement Plan at El 165 Ft, as-built. (Radwaste Bldg Equipment Hoist Load Path).Sheet 40 ML20263C3621975-10-23023 October 1975 General Arrangement Plan at El 135 Ft, as-built. (Reactor Bldg CRD Jib Crane Load Path).Sheet 41 ML20263C3651975-10-23023 October 1975 General Arrangement Plan at El 195 Ft, as-built. (Reactor Building - El 195 Ft CRD Transport Jib Crane Load Path).Sheet 42 ML20263C2691973-10-23023 October 1973 Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Drywell Head Load Path).Sheet 6 ML20263C2791973-10-23023 October 1973 Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Fuel Load Path).Sheet 10 ML20263C2821973-10-23023 October 1973 Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 Refueling Floor - Fuel Shipping Cask Load Path).Sheet 11 ML20263C2771973-10-23023 October 1973 Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Steam Separator Load Path).Sheet 9 ML20263C2741973-10-23023 October 1973 Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Steam Dryer Load Path).Sheet 8 ML20263C2711973-10-23023 October 1973 Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane - 20H01 - 30H01 Refueling Floor - RPV Head Load Path).Sheet 7 ML20263C2541973-10-23023 October 1973 Equipment Location:Reactor and Radwaste Building, as-built.(Refueling Floor - El 234 Ft Restricted & Special Precaution Areas for the Movement of Heavy Loads During Refueling.)Sheet 2 ML20263C2661973-10-23023 October 1973 Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Slot Plug Load Path).Sheet 5 ML20263C2631973-10-23023 October 1973 Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane - 20H01 - 30H01 (Stm Dryer-Sep) Pool Plug - Load Path).Sheet 4 ML20263C2601973-10-23023 October 1973 Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 - 30H01 Refueling Floor Shield Plug Load Path).Sheet 3 ML20263C2571973-10-23023 October 1973 Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(Refueling Floor - El 234 Ft Restricted & Special Precaution Areas for the Movement of Heavy Loads During Plant Operation.) Sheet 1 ML20263C3741973-10-23023 October 1973 Equipment Location:Reactor Building Plan at El 195 Ft, as-built.(Reactor Bldg - El 195 Ft CRD Maintenance Bridge Crane Load Path).Sheet 44 ML20263C2851973-10-23023 October 1973 Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 & 30H01 Refueling Floor - New Fuel Load Path).Sheet 12 ML20263C2881973-10-23023 October 1973 General Arrangement:Plan at El 165 Ft, as-built. (TB Crane - OAH09 - OBH09 - Turbine & Generator Rotor & Parts Load Path Units 2 & 3).Sheet 13 ML20263C2911973-10-23023 October 1973 Equipment Location:Turbine Building Plan at El 165 Ft, as-built.((Reactor) Feed Pump Crane - 20H07 - 30H07 Pump & Turbine Load Path).Sheet 14 ML20263C3711973-10-23023 October 1973 General Arrangement Plan at El 195 Ft, as-built. (Reactor Building - El 195 Ft CRD Storage Jib Crane Load Path).Sheet 43 ML20263C3471973-06-16016 June 1973 Cw Pump Structure Plan Elev 112 Ft & 116 Ft, as-built. (Cw Pump Structure Trash Handling Equipment Hoist - 20H50 - 30H50 Load Path).Sheet 35 ML20263C3681973-06-12012 June 1973 Cw Screen Structure Weatherproof Building, as-built. (Screen Structure Trash Handling Eqpt Hoist - 2AH45,2BH45, 3AH45 & 3BH45).Sheet 39 ML20263C3251973-02-0606 February 1973 Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (5000 Escapement Door Lift Winch - 00H32 Vertical Load Path).Sheet 27 ML20263C3281973-02-0606 February 1973 Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (2500 Escapement Door Lift Winch - 0AH33 - 0BH33 Vertical Load Path).Sheet 28 ML20263C3311973-02-0606 February 1973 Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (RW Building Demin Hoist - 00H35 Load Path). Sheet 29 ML20263C3341973-02-0606 February 1973 Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (Torus Equipment Removal Hoist 00H37 - Load Path).Sheet 30 ML20263C3221973-01-23023 January 1973 Equipment Location:Turbine Building Plan at El 135 Ft, as-built.(Condensate Demin Hoist - 20H25 - 30H25 Condensate Demin Aux Hoist - 20H47 - 30H47 Load Path).Sheet 26 ML20263C3371972-06-16016 June 1972 Off-Gas Filter Building Plans,Elevation,Details, as-built. (Off Gas Filter Trolley - 00H53 Load Path).Sheet 31 1981-06-18 Category:DRAWINGS MONTHYEARML20266A4311996-11-20020 November 1996
[Table view]Conduit Layout Cable Spreading Room Turbine Bldg Area 3 El 150 O.Sheet 1 of 9.Actual Rev number:108 ML20266A4451996-08-0707 August 1996 Conduit Layout Cable Spreading Room Turbine Bldg Area 3 El 150 0.Sheet 5.Actual Rev number:109 ML20266A4391996-02-12012 February 1996 Conduit Layout Cable Spreading Room Turbine Bldg Area 3 Elev 150 O.Sheet 3 of 9.Actual Rev number:109 ML20266A4561996-02-0101 February 1996 Conduit Layout Cable Spreading Room Turbine Bldg Area 3 El 150 0.Sheet 8 of 9.Actual Rev Number 106 ML20266A4521996-01-10010 January 1996 Conduit Layout Cable Spreading Room Turbine Bldg Area 3 El 150 O.Sheet 7 of 9.Actual Rev number:106 ML20266A4431995-04-19019 April 1995 Conduit Layout Cable Spreading Room Turbine Bldg Area 3 Elev 150 O.Sheet 4 of 9.Actual Rev number:110 ML20266A4351995-01-23023 January 1995 Conduit Layout Cable Spreading Room Turbine Bldg Area 3 El 150 0.Sheet 2 of 9.Actual Rev number:106 ML20266A4281994-10-21021 October 1994 Tray Layout Sections & Details Turbine Bldg Area 3 El 150 O. Sheet 3 of 3 ML20266A4041994-10-21021 October 1994 Tray Layout Turbine Bldg Area 3 El 150 0.Sheet 1 of 3 ML20266A4071994-10-12012 October 1994 Tray Layout Turbine Bldg Area 3 El 150 0.Sheet 2 of 3 ML20266A4601994-09-21021 September 1994 Conduit Layout Cable Spreading Room Turbine Bldg Area 3 El 150 O.Sheet 9 of 9 ML20266A4481994-09-21021 September 1994 Conduit Layout Cable Spreading Room Turbine Bldg Area 3 El 150 0.Sheet 6 of 9.Actual Rev number:106 ML20266A3951989-08-10010 August 1989 Area No 3 Turbine Building Plan at Elevation 150 O ML20266J7241987-08-10010 August 1987 P&ID Hydrogen Water Chemistry Station. Sheet 1 of 4 ML20266J7261987-08-10010 August 1987 P&ID Hydrogen Water Chemistry Station. Sheet 2 of 4 ML20265B4711986-11-21021 November 1986 Fire Detection and Suppression-Floor Plan at El 116 Ft, as-built.Sheet 6280 ML20266G9301986-11-0505 November 1986 P&ID Service Water System. Sheet 1 of 2 ML20265B4631986-06-20020 June 1986 Fire Detection and Suppression-Floor Plan at El 165 Ft, as-built.Sheet 6280 ML20265B4671986-06-20020 June 1986 Fire Detection and Suppression-Floor Plan at El 135 Ft, as-built.Sheet 6280 ML20265E4121985-12-26026 December 1985 P&Id:Fuel Pool Cooling & Clean-Up. Sheet 1 of 2.Rev Date Illegible ML20265E3961985-10-0303 October 1985 P&Id:Service Water System ML20265E3911985-08-22022 August 1985 P&Id:Condensate & Refueling Water Storage & Transfer Systems. Sheet 1 of 2 ML20265E3761985-04-0404 April 1985 P&Id:Residual Heat Removal System Unit 3. Sheet 2 of 2 ML20265E3821985-04-0404 April 1985 P&Id:Residual Heat Removal System Unit 2. Sheet 1 of 2 ML20265E4071985-03-25025 March 1985 P&Id:Fuel Pool Cooling & Cleanup. Sheet 2 ML20265E4021985-02-0101 February 1985 P&ID:Make-Up Demineralizer Water ML20266A3991984-09-20020 September 1984 Area No 3 Turbine Building Plan at Elevation 165 O ML20263B1691983-10-19019 October 1983 Cross Section Drawing:9200 Offset Tee Ring Valve W/Leak-Off Detection & Disc Stop for Bechtel Corp. Rev Date Illegible ML20263B1711983-10-19019 October 1983 Marked-up Purge & Vent Valve Arrangement. No Drawing Date ML20259C1351983-03-23023 March 1983 Marked-up Fire Detection & Suppression - Floor Plan at El 116 Ft, as-built.Sheet 6280 ML20259C1391983-03-12012 March 1983 Marked-up Fire Detection & Suppression - Floor Plan at El 91 Ft 6 Inches, as-built.Sheet 6280 ML20259C1481983-03-10010 March 1983 Marked-up Fire Detection & Suppression - Floor Plan at El 165 Ft, as-built.Sheet 6280 ML20259C1431983-03-10010 March 1983 Marked-up Fire Detection & Suppression - Floor Plan at El 135 Ft, as-built.Sheet 6280 ML20263G2581983-01-31031 January 1983 Mechanical P&Id:Post Accident Sampling System. No Revision Date ML20262H4551982-10-22022 October 1982 Marked-up Electrical Index E-20088:Raceway Layout Reactor Bldg Unit 3 Area 15 El 91 Ft 6 Inches, as-built.No Revision Date ML20262H4841982-10-22022 October 1982 Marked-up Electrical Index E-2008:Tray Layout Turbine Bldg Area 3 El 150 Ft, as-built.No Revision Date ML20262H4741982-10-22022 October 1982 Marked-up Electrical Index E-2008:Raceway Layout Reactor Bldg Unit 3 Area 16 El 135 Ft, as-built.No Revision Date ML20262H5031982-10-22022 October 1982 Marked-up Electrical Index E-2008:Raceway & Grounding Layout Pump Structure Unit 3. No Revision Date ML20262H4531982-10-22022 October 1982 Marked-up Electrical Index E-2008:Raceway Layout Reactor Bldg Unit 2 Area 8 El 91 Ft 6 Inches, as-built.No Revision Date ML20262H4811982-10-22022 October 1982 Marked-up Electrical Index E-2008:Raceway Layout Radwaste Bldg Area 10 El 165 Ft, as-built.No Revision Date ML20262H5111982-10-22022 October 1982 Marked-up Electrical Index E-2008:Raceway & Grounding Layout Pump Structure Unit 2. No Revision Date ML20262H4781982-10-22022 October 1982 Marked-up Electrical Index E-2008:Raceway Layout Reactor Bldg Unit 3 Area 16 El 165 Ft, as-built.No Revision Date ML20262H4501982-10-22022 October 1982 Marked-up Electrical Index E-2008:Raceway Layout Reactor Bldg Unit 2 Area 7 El 91 F1 6 Inches, as-built.No Revision Date ML20262H4571982-10-22022 October 1982 Marked-up Electrical Index E-2008:Raceway Layout Reactor Bldg Unit 3 Area 16 El 91 Ft 6 Inches, as-built.No Revision Date ML20262H4681982-10-22022 October 1982 Marked-up Electrical Index E-2008:Raceway Layout Reactor Bldg Unit 2 Area 8 165 Ft, as-built.No Revision Date ML20262H4631982-10-22022 October 1982 Marked-up Electrical Index E-2008:Raceway Layout Reactor Bldg Unit 2,Area 8 El 136 Ft. No Revision Date ML20262H4711982-09-28028 September 1982 Marked-up Electrical Index E-2008:Raceway Layout Reactor Bldg Unit 3 Area 15 El 135 Ft ML20262H4921982-09-27027 September 1982 Marked-up Electrical Index E-2008:Raceway Layout Turbine Building Area 3 El 165 Ft, as-built.Sheet 1 of 2 ML20262H4951982-09-27027 September 1982 Marked-up Electrical Index E-2008:Raceway Layout Turbine Building Area 3 El 165 Ft, as-built.Sheet 2 of 2 ML20262H4601982-09-24024 September 1982 Marked-up Electrical Index E-2008:Raceway Layout Reactor Bldg Unit 2,Area 7 El 135 Ft 1996-08-07 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20263C368&oldid=3130345"