Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML24222A677 + (09:01:31, 21 February 2026)
- DCL-2024-523, Submittal of Report on Discharge Self-Monitoring + (09:01:48, 21 February 2026)
- ML24221A287 + (09:03:00, 21 February 2026)
- L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval + (09:04:08, 21 February 2026)
- ML24219A393 + (09:04:24, 21 February 2026)
- ML24219A263 + (09:04:26, 21 February 2026)
- RA-24-0209, Regulatory Conference, Additional Supporting Information + (09:04:31, 21 February 2026)
- ML24219A027 + (09:04:41, 21 February 2026)
- 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal + (09:04:50, 21 February 2026)
- CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality + (09:04:51, 21 February 2026)
- PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 + (09:05:20, 21 February 2026)
- ML24215A300 + (09:05:23, 21 February 2026)
- ML24214A079 + (09:06:18, 21 February 2026)
- ML24214A072 + (09:06:23, 21 February 2026)
- ML24214A070 + (09:06:23, 21 February 2026)
- ML24214A069 + (09:06:24, 21 February 2026)
- ML24214A065 + (09:06:25, 21 February 2026)
- ML24214A064 + (09:06:25, 21 February 2026)
- ML24214A060 + (09:06:27, 21 February 2026)
- ML24214A054 + (09:06:28, 21 February 2026)
- ML24214A051 + (09:06:30, 21 February 2026)
- ML24214A049 + (09:06:31, 21 February 2026)
- ML24214A018 + (09:06:35, 21 February 2026)
- ML24214A019 + (09:06:35, 21 February 2026)
- ML24213A335 + (09:06:39, 21 February 2026)
- ML24213A141 + (09:06:47, 21 February 2026)
- NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation + (09:06:51, 21 February 2026)
- NLS2024053, Licensee Guarantees of Payment of Deferred Premiums + (09:07:00, 21 February 2026)
- GL-704111-29, Past Due General License Device Annual Registration + (09:07:10, 21 February 2026)
- AEP-NRC-2024-47, Form OAR-1, Owners Activity Report + (09:07:24, 21 February 2026)
- ML24211A041 + (09:08:30, 21 February 2026)
- RA-24-0165, Response to Request for Additional Information (RAI) Regarding Proposed Alternative for the Fifth Ten-Year Inservice Inspection Interval Limited Examinations + (09:08:43, 21 February 2026)
- WBL-24-034, NRC Regulatory Issue Summary (RIS) 2024-01 - Preparation and Scheduling of Operator Licensing Examinations + (09:08:59, 21 February 2026)
- L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections + (09:09:04, 21 February 2026)
- NLS2024052, Supplement to the Application to Modify the Allowable Value for Cooper Nuclear Station Technical Specifications High Pressure Coolant Injection Pump Discharge Low Flow + (09:09:05, 21 February 2026)
- ML24207A085 + (09:09:08, 21 February 2026)
- LG-24-089, Owners Activity Report (OAR-1) for Li1R20 + (09:09:12, 21 February 2026)
- ML24206A209 + (09:09:24, 21 February 2026)
- ML24206A116 + (09:09:48, 21 February 2026)
- LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding + (09:09:51, 21 February 2026)
- ML24206A025 + (09:10:22, 21 February 2026)
- DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 25 + (09:10:37, 21 February 2026)
- 05000400/LER-2024-001, Automatic Reactor Trip Due to Main Generator Lock-Out + (09:10:48, 21 February 2026)
- NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair + (09:10:59, 21 February 2026)
- GNRO-2013/00079, 2013-10-13 (GNRO-2013-00079) Response to RAI Set 49 (Dated Sep-12-2013) + (09:11:14, 21 February 2026)
- PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations + (09:11:52, 21 February 2026)
- ML24199A217 + (09:11:59, 21 February 2026)
- L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report + (09:12:05, 21 February 2026)
- ML24198A169 + (09:12:13, 21 February 2026)
- ML24198A168 + (09:12:14, 21 February 2026)
- L-24-161, Discharge Monitoring Report (NPDES) Permit No. PA0025615 + (09:12:23, 21 February 2026)