Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000321/LER-1981-057-03, /03L-0:on 810611,temporary Change to HNP-1-6907 (Reactor Core Isolation Cooling Pump Suction Hydro) Found Not Approved by Mgt within Reguired Time.Caused by Personnel Failure to Maintain Adequate Control Over Procedure + (13:18:42, 21 December 2024)
- 05000369/LER-1981-082, Forwards LER 81-082/03L-0 + (13:18:43, 21 December 2024)
- ML20009F640 + (13:18:44, 21 December 2024)
- 05000335/LER-1981-027, Forwards LER 81-027/03L-0 + (13:18:45, 21 December 2024)
- 05000369/LER-1981-077-01, /01T-0:on 810521,ASME Code Rejectable Indications Found in Vendor Seal Plate to Door Frame Welds During Nondestructive Exam of Personnel Lock Shim Plate Welds. Caused by Use of Seal Rather than Structural Welds + (13:18:47, 21 December 2024)
- 05000369/LER-1981-095, Forwards LER 81-095/03L-0 + (13:18:48, 21 December 2024)
- 05000364/LER-1981-025-03, /03L-0:on 810604,steam Jet Air Ejector Noble Gas Activity Monitor RE-15 Failed Low.Caused by Faulty Connection at Detector.Condition Corrected & Monitor Returned to Svc on 810615 + (13:18:51, 21 December 2024)
- ML20009F633 + (13:18:52, 21 December 2024)
- 05000369/LER-1981-077, Forwards LER 81-077/01T-0.Detailed Event Analysis Encl + (13:18:53, 21 December 2024)
- 05000321/LER-1981-057, Forwards LER 81-057/03L-0 + (13:18:55, 21 December 2024)
- 05000364/LER-1981-023-03, /03L-0:on 810604,boric Acid Storage Sys Declared Inoperable Due to Low Concentration in Boric Acid Tank 2A & Low Vol of Solution in Tank 2B.Caused by Prior Use of Sys for Boration & Personnel Error + (13:18:57, 21 December 2024)
- ML20009F627 + (13:18:58, 21 December 2024)
- 05000364/LER-1981-022-03, /03L-0:on 810603,recombiner Oxygen Outlet Analyzer a Found Not Responding to Changes in Oxygen Concentration. Probably Caused by Serviceman Failure to Place Analyzer in Measure Mode Following Performance of Alignment Procedu + (13:18:59, 21 December 2024)
- 05000369/LER-1981-074-03, /03L-0:on 810429,inadvertent Safety Injection Initiated on Train a When Solid State Protection Sys Logic Cabinets Were Returned to Svc W/O Blocking Injection Signals During Initial Fuel Load.Caused by Mods to Cabinets + (13:19:01, 21 December 2024)
- ML20009F623 + (13:19:02, 21 December 2024)
- 05000369/LER-1981-074, Forwards LER 81-074/03L-0.Detailed Event Analysis Encl + (13:19:03, 21 December 2024)
- 05000369/LER-1981-069-03, /03L-0:on 810426,while in Mode 3 Initial Fuel Loading,Cold Leg Accumulator D Low Level Alarm Received in Control Room.Caused by Leaking Safety Injection Test Header. Level Restored.Leaking Valve Will Be Replaced & Tested + (13:19:04, 21 December 2024)
- 05000366/LER-1981-051-03, /03L-0:on 810610,reactor Bldg to Torus Vacuum Breaker Isolation Valve 2T48-F310 Failed Open.Caused by Sticking Switch Reset.Switch Cleaned,Lubricated & Tested + (13:19:06, 21 December 2024)
- ML20009F617 + (13:19:07, 21 December 2024)
- ML20009F616 + (13:19:11, 21 December 2024)
- 05000369/LER-1981-069, Forwards LER 81-069/03L-0.Detailed Event Analysis Encl + (13:19:12, 21 December 2024)
- 05000369/LER-1981-068, Forwards LER 81-068/03L-0.Detailed Event Analysis Encl + (13:19:14, 21 December 2024)
- 05000366/LER-1981-051, Forwards LER 81-051/03L-0 + (13:19:16, 21 December 2024)
- 05000296/LER-1981-032-03, /03L-0:on 810701,leak Discovered at Vent Nipple of RHR Pump Room Cooler 3A.Cause Unknown.Crack Was Silver Soldered + (13:19:18, 21 December 2024)
- ML20009F603 + (13:19:19, 21 December 2024)
- 05000369/LER-1981-067-03, /03L-0:on 810425,while in Mode 3 Initial Fuel Loading,Boron Concentration in Upper Head Injection Accumulator Sys Was 2,153 Parts Per Meter.Caused by Insufficient Purging Before Sampling.Pressure Reduced + (13:19:21, 21 December 2024)
- 05000296/LER-1981-032, Forwards LER 81-032/03L-0 + (13:19:22, 21 December 2024)
- ML20009F599 + (13:19:23, 21 December 2024)
- 05000369/LER-1981-067, Forwards LER 81-067/03L-0.Detailed Event Analysis Encl + (13:19:24, 21 December 2024)
- ML20009F596 + (13:19:25, 21 December 2024)
- 05000335/LER-1981-031-03, /03L-0:on 810605,electrical Ground Occurred on 125-volt Dc Bus B.Caused by Grounded Coil in Faulty Electrohydraulic Actuator for Governor Valve.Spare Actuator Installed + (13:19:27, 21 December 2024)
- 05000335/LER-1981-031, Forwards LER 81-031/03L-0 + (13:19:28, 21 December 2024)
- ML20009F589 + (13:19:29, 21 December 2024)
- L-81-249, Interim Deficiency Rept,Originally Reported on 810312,re Failure to Follow Established Procedure When Interpreting Radiographs of safety-related Welds.Required Repair Work Not Yet Completed.Final Rept Delayed Until 810731 + (13:19:30, 21 December 2024)
- L-81-288, Deficiency Rept,Originally Reported on 810610,re Linear Indications in Reactor Coolant Pump 2A1 Volute.Further Info Needed Re Size & Depth of Excavations Required to Remove Linear Indications.Final Rept Will Be Submitted 810810 + (13:19:31, 21 December 2024)
- ML20009F586 + (13:19:33, 21 December 2024)
- ML20009F585 + (13:19:33, 21 December 2024)
- ML20009F582 + (13:19:35, 21 December 2024)
- ML20009F583 + (13:19:35, 21 December 2024)
- ML20009F580 + (13:19:36, 21 December 2024)
- ML20009F581 + (13:19:36, 21 December 2024)
- ML20009F578 + (13:19:37, 21 December 2024)
- ML20009F577 + (13:19:37, 21 December 2024)
- ML20009F576 + (13:19:38, 21 December 2024)
- ML20009F575 + (13:19:38, 21 December 2024)
- ML20009F574 + (13:19:39, 21 December 2024)
- 05000321/LER-1981-056-03, /03L-0:on 810610,during Startup,Offgas Hydrogen Analyzer 1N62-N009A Was Reported Inoperative.Caused by Personnel Error.Root Valve N62-F064 a Was Found Closed. Valve Opened + (13:19:40, 21 December 2024)
- 05000321/LER-1981-056, Forwards LER 81-056/03L-0 + (13:19:42, 21 December 2024)
- ML20009F570 + (13:19:43, 21 December 2024)
- ML20009F569 + (13:19:45, 21 December 2024)
- ML20009F567 + (13:19:45, 21 December 2024)