Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000368/LER-1981-030, Forwards LER 81-030/03L-0 + (10:24:58, 21 December 2024)
- 05000267/LER-1981-049-03, /03L-0:during 810802-07,increase Occurred in Offgassing from Core & Core Outlet Temps.Caused by Increased Primary Coolant Moisture & Oxidants from Refueling Shutdown + (10:25:00, 21 December 2024)
- ML20010H929 + (10:25:05, 21 December 2024)
- 05000368/LER-1981-031-03, /03L-0:on 810808,during Axial Shape Index Dampening Maneuver,Part Length Control Element Assembly Dropped & Became Inoperable.After Repair,Dropped Again on 810809.Caused by Poor Connection of Coil Driver Card + (10:25:06, 21 December 2024)
- ML20010H927 + (10:25:08, 21 December 2024)
- 05000267/LER-1981-049, Forwards LER 81-049/03L-0.Detailed Event Analysis Encl + (10:25:09, 21 December 2024)
- ML20010H924 + (10:25:10, 21 December 2024)
- ML20010H923 + (10:25:11, 21 December 2024)
- 05000270/LER-1981-013-03, /03L-0:on 810815,reactor Bldg Spray Pump 2A Declared Inoperable Due to Oil Leak on Bearing Oil Reservoir.Caused by Loose Piping Allowing Leakage.Reservoir Refilled W/Oil + (10:25:13, 21 December 2024)
- ML20010H921 + (10:25:14, 21 December 2024)
- 05000265/LER-1981-015-03, /03L-0:on 810823,while Performing Suppression Chamber to Drywell Vacuum Breaker Monthly Exercise,Valve 2-1601-32C Failed to Indicate Fully Closed.Caused by Misalignment of Position Indication Limit Switches + (10:25:15, 21 December 2024)
- ML20010H919 + (10:25:16, 21 December 2024)
- 05000270/LER-1981-013, Forwards LER 81-013/03L-0.Detailed Event Analysis Encl + (10:25:18, 21 December 2024)
- ML20010H914 + (10:25:19, 21 December 2024)
- 05000267/LER-1981-052-03, /03L-0:on 810812,standby Bearing Water Makeup Pump Removed from Svc.Caused by Need to Repair Bonnet Leak in Valve in Suction Line to Pump.Pump Returned to Svc After Repair Completed + (10:25:20, 21 December 2024)
- 05000368/LER-1981-031, Forwards LER 81-031/03L-0 + (10:25:22, 21 December 2024)
- 05000265/LER-1981-015, Forwards LER 81-015/03L-0 + (10:25:25, 21 December 2024)
- ML20010H906 + (10:25:26, 21 December 2024)
- ML20010H905 + (10:25:31, 21 December 2024)
- 05000267/LER-1981-052, Forwards LER 81-052/03L-0.Detailed Event Analysis Encl + (10:25:33, 21 December 2024)
- 05000313/LER-1981-009-03, /03L-0:on 810727,during Start Test of Steam Driven Emergency Feedwater Pump P7A,steam Generator B Valve CV-2617 Did Not Open on Demand.Caused by Excessive Play Due to Wear.Switch Replaced + (10:25:34, 21 December 2024)
- 05000324/LER-1981-079-03, /03L-0:on 810828,while Performing Routine Maint on RHR Steam Leak Detection Temp Switches 2-E11-TS-N600A & B, HPCI Sys Isolated Automatically.Caused by Removal of Thermocouple Leads to HPCI Room Ambient Temp Switch + (10:25:36, 21 December 2024)
- ML20010H900 + (10:25:37, 21 December 2024)
- IR 05000382/1981022 + (10:25:38, 21 December 2024)
- ML20010H897 + (10:25:44, 21 December 2024)
- 05000313/LER-1981-009, Forwards LER 81-009/03L-0 + (10:25:46, 21 December 2024)
- AECM-81-357, Forwards Responses to Informal Questions Presented During 810817 Meeting W/Nrc & Bechtel Re Cable Tray Testing.Info Presented Is Also in Direct Response to SER (NUREG-0831,Sept 1981 Item 1.9(1)) + (10:25:47, 21 December 2024)
- 05000324/LER-1981-079, Forwards LER 81-079/03L-0 + (10:25:50, 21 December 2024)
- 05000368/LER-1981-029-03, /03L-0:on 810806,two Unsealed Wall Fire Barrier Penetrations Found W/O Proper Fire Watch.Caused by Inadequate Instructions to Contractor Personnel.Fire Watch Set Up & Maintained Until Fire Barrier re-established + (10:25:51, 21 December 2024)
- ML20010H887 + (10:25:56, 21 December 2024)
- ML20010H886 + (10:25:56, 21 December 2024)
- 05000368/LER-1981-029, Forwards LER 81-029/03L-0 + (10:25:57, 21 December 2024)
- 05000324/LER-1981-072-03, /03L-0:on 810827,while Performing HPCI Sys Isolation Instrumentation Steam Leak Detection Calibr, PT 2.10.3PC,steam Line Area Differential Temp Switch Failed to Calibr.Caused by Failure to Follow Calibr Procedure + (10:26:00, 21 December 2024)
- 05000267/LER-1981-048-03, /03L-0:on 810808 & 25 Loop 1 Prestressed Concrete Reactor Vessel Cooling Water Outlet Temp Exceeded 120 F Due to Failure of Temp Controller.Caused by Cold Solder Joint & Failure of Transistor in Output Circuit,Respectively + (10:26:02, 21 December 2024)
- ML20010H879 + (10:26:03, 21 December 2024)
- ML20010H881 + (10:26:03, 21 December 2024)
- 05000324/LER-1981-072, Forwards LER 81-072/03L-0 + (10:26:04, 21 December 2024)
- ML20010H876 + (10:26:06, 21 December 2024)
- ML20010H875 + (10:26:07, 21 December 2024)
- ML20010H874 + (10:26:08, 21 December 2024)
- 05000267/LER-1981-048, Forwards LER 81-048/03L-0.Detailed Event Analysis Encl + (10:26:09, 21 December 2024)
- ML20010H869 + (10:26:11, 21 December 2024)
- ML20010H871 + (10:26:11, 21 December 2024)
- AECM-81-365, Confirms That Equipment Qualification Meeting Will Be Held 811019-22 Per 810921 Telcon.Topics Discussed Will Include NSSS Qualification Files,Equipment Walkdowns & Electrical Interface Components + (10:26:12, 21 December 2024)
- ML20010H867 + (10:26:13, 21 December 2024)
- ML20010H866 + (10:26:14, 21 December 2024)
- ML20010H865 + (10:26:15, 21 December 2024)
- 05000277/LER-1981-038, Submits Followup to LER 81-038/01T-2.Several Cables W/ Deficiencies Corrected by Pulling New Cables & Redesignating Others.Interposing Relays Installed to Separate safety- Related & nonsafety-related Control Circuitry + (10:26:17, 21 December 2024)
- ML20010H862 + (10:26:18, 21 December 2024)
- ML20010H861 + (10:26:22, 21 December 2024)
- ML20010H859 + (10:26:23, 21 December 2024)