Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BVY-90-033, Forwards Supplemental Info Re Feedwater Check Valve V28B Flaws Evaluation,Per NRC Request.Util Remains Committed to Replacement of Subj Valve During Upcoming 1990 Refueling Outage + (08:12:12, 21 December 2024)
- ML20012D023 + (08:12:15, 21 December 2024)
- ML20012D022 + (08:12:17, 21 December 2024)
- ML20012D021 + (08:12:18, 21 December 2024)
- ML20012D019 + (08:12:21, 21 December 2024)
- ML20012D018 + (08:12:22, 21 December 2024)
- ML20012D015 + (08:12:24, 21 December 2024)
- ML20012D016 + (08:12:24, 21 December 2024)
- ML20012D014 + (08:12:26, 21 December 2024)
- ML20012D013 + (08:12:28, 21 December 2024)
- 05000285/LER-1990-004, :on 900217,lift Pressures for 6 of 10 Main Steam Safety Valves Found Outside Acceptance Criteria. Caused by Overly Restrictive Operability Criteria.Valves Recalibr & License Amend Submitted to NRC + (08:12:29, 21 December 2024)
- ML20012D011 + (08:12:38, 21 December 2024)
- 05000285/LER-1990-003, :on 900216,determined That Auxiliary Feedwater Piping Outside Normal Stress Limits of ASME Code & Design Basis Specified in Updated Sar.Caused by Design Deficiency.Valve Operators Will Be Inspected + (08:12:39, 21 December 2024)
- ML20012D009 + (08:12:41, 21 December 2024)
- ML20012D008 + (08:12:43, 21 December 2024)
- ML20012D007 + (08:12:43, 21 December 2024)
- ML20012D006 + (08:12:44, 21 December 2024)
- ML20012D005 + (08:12:45, 21 December 2024)
- LIC-90-0203, Forwards Application for Amend to License DPR-40,making Corrections to Tech Specs Re Administrative Controls + (08:12:47, 21 December 2024)
- ML20012D004 + (08:12:47, 21 December 2024)
- ML20012D000 + (08:12:50, 21 December 2024)
- ML20012C999 + (08:12:51, 21 December 2024)
- LIC-90-0205, Responds to Generic Ltr 89-19 Re USI A-47, Safety Implication of Control Sys in LWR Nuclear Power Plants. Mod Request MR-FC-084 Initiated to Provide Automatic Steam Generator Overfill Protection + (08:12:53, 21 December 2024)
- ML20012C998 + (08:12:53, 21 December 2024)
- ML20012C995 + (08:12:56, 21 December 2024)
- ML20012C994 + (08:12:57, 21 December 2024)
- RBG-32507, Forwards Duke Engineering & Svcs,Inc to BC Fichtenkort Re Proposed Crankshaft Insp Variation & Recommends Variation Be Presented to Clearinghouse Members at 900111-12 Meeting + (08:12:58, 21 December 2024)
- ML20012C992 + (08:13:00, 21 December 2024)
- ML20012C991 + (08:13:02, 21 December 2024)
- ML20012C990 + (08:13:03, 21 December 2024)
- ML20012C989 + (08:13:04, 21 December 2024)
- ML20012C988 + (08:13:06, 21 December 2024)
- ML20012C987 + (08:13:06, 21 December 2024)
- ML20012C985 + (08:13:07, 21 December 2024)
- ML20012C984 + (08:13:08, 21 December 2024)
- JPN-90-023, Forwards Application for Amend to License DPR-59,changing Tech Spec Section 4.9.F, LPCI Motor-Operated Valve Independent Power Supplies, on Page 222a.Changes Purely Editorial in Nature & Revises Surveillance Requirement + (08:13:08, 21 December 2024)
- ML20012C981 + (08:13:12, 21 December 2024)
- ML20012C980 + (08:13:13, 21 December 2024)
- ML20012C979 + (08:13:14, 21 December 2024)
- ML20012C978 + (08:13:15, 21 December 2024)
- ML20012C977 + (08:13:16, 21 December 2024)
- ML20012C976 + (08:13:17, 21 December 2024)
- ML20012C975 + (08:13:19, 21 December 2024)
- ML20012C974 + (08:13:20, 21 December 2024)
- ML20012C973 + (08:13:21, 21 December 2024)
- LIC-90-0193, Provides Interim Update of Util Position for Testing PORV Block Valves,Per 891215 Telcon W/A Bournia.Crane 2 1/2 Inch 797-U Replacement Valves Expected to Be Delivered within 1 Yr.Test Results Expected in Second Quarter 1991 + (08:13:22, 21 December 2024)
- ML20012C970 + (08:13:24, 21 December 2024)
- TAC:76120 + (08:13:26, 21 December 2024)
- ML20012C969 + (08:13:26, 21 December 2024)
- ML20012C967 + (08:13:27, 21 December 2024)
- ML20012C966 + (08:13:29, 21 December 2024)